February 2005 Monthly Operating Report for St Lucie Units 1 and 2
ML050810429
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/15/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-063
Download: ML050810429 (3)


Text

I F

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 March 15, 2005

PL L-2005-063 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, A

William J r.

Vice President St. Lucie Plant WJ/KWF Attachment D' ec 

an FPL Group company

> I. -'?

L-2005-063 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME ST DATE 1

COMPLETED BY RK TELEPHONE 7

REPORTING PERIOD:

'-335

. Lucie 1 arch 11,2005 R. Boller

72) 467-7465 February 2005
1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 672.00 672.00 0.00 575,733.00 Yr-to-Date 1,416.00 1,416.00 0.00 1,212,772.00 Cumulative 202,544.12 200,645.85 0.00 164,638,014.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 1 operated in Mode 1 power operations for the entire reporting period. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Io L-2005-063 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

50-389 UNIT NAME St. Lucie 2 DATE March 11, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIOD:

February 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 347.70 316.07 0.00 235,931.00 Yr-to-Date 437.70 382.07 0.00 256,550.00 Cumulative 164,575.92 162,564.94 0.00 134,084,960.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 001 01105/2005 S

355.93 C

4 Unit 2 SL2-15 refuleing outage

SUMMARY

St. Lucie Unit 2 began the reporting period offline for the SL2-15 refueling outage. The unit was returned to service on February 15, 2005 and remained in Mode 1 power operations for the remainder of the reporting period.

In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3 Automatic Trip/Scram 4

Continuation 5

Other (Explain)