L-2005-063, February 2005 Monthly Operating Report for St Lucie Units 1 and 2
| ML050810429 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/15/2005 |
| From: | Jefferson W Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2005-063 | |
| Download: ML050810429 (3) | |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 I March 15, 2005 F :PL L-2005-063 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, A .
William J r.
Vice President St. Lucie Plant WJ/KWF Attachment D' ec'-
an FPL Group company
> I.-'?
L-2005-063 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50'-335 UNIT NAME ST. Lucie 1 DATE 1arch 11,2005 COMPLETED BY RKR. Boller TELEPHONE 7 72) 467-7465 REPORTING PERIOD: February 2005
- 1. Design Electrical Rating 830.00
- 2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 672.00 1,416.00 202,544.12
- 4. Number of Hours Generator On-line 672.00 1,416.00 200,645.85
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 575,733.00 1,212,772.00 164,638,014.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
- St. Lucie Unit 1 operated in Mode 1 power operations for the entire reporting period. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
. Io L-2005-063 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50-389 UNIT NAME St. Lucie 2 DATE March 11, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIOD: February 2005
- 1. Design Electrical Rating 830.00
- 2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 347.70 437.70 164,575.92
- 4. Number of Hours Generator On-line 316.07 382.07 162,564.94
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 235,931.00 256,550.00 134,084,960.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 001 01105/2005 S 355.93 C 4 Unit 2 SL2-15 refuleing outage
SUMMARY
- St. Lucie Unit 2 began the reporting period offline for the SL2-15 refueling outage. The unit was returned to service on February 15, 2005 and remained in Mode 1 power operations for the remainder of the reporting period.
In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
1 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 I March 15, 2005 F :PL L-2005-063 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, A .
William J r.
Vice President St. Lucie Plant WJ/KWF Attachment D' ec'-
an FPL Group company
> I.-'?
L-2005-063 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50'-335 UNIT NAME ST. Lucie 1 DATE 1arch 11,2005 COMPLETED BY RKR. Boller TELEPHONE 7 72) 467-7465 REPORTING PERIOD: February 2005
- 1. Design Electrical Rating 830.00
- 2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 672.00 1,416.00 202,544.12
- 4. Number of Hours Generator On-line 672.00 1,416.00 200,645.85
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 575,733.00 1,212,772.00 164,638,014.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
- St. Lucie Unit 1 operated in Mode 1 power operations for the entire reporting period. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
. Io L-2005-063 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50-389 UNIT NAME St. Lucie 2 DATE March 11, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIOD: February 2005
- 1. Design Electrical Rating 830.00
- 2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 347.70 437.70 164,575.92
- 4. Number of Hours Generator On-line 316.07 382.07 162,564.94
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 235,931.00 256,550.00 134,084,960.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 001 01105/2005 S 355.93 C 4 Unit 2 SL2-15 refuleing outage
SUMMARY
- St. Lucie Unit 2 began the reporting period offline for the SL2-15 refueling outage. The unit was returned to service on February 15, 2005 and remained in Mode 1 power operations for the remainder of the reporting period.
In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
1 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)