ML050770297
| ML050770297 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/16/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Donohew J N, NRR/DLPM,415-1307 | |
| Shared Package | |
| ML050810540 | List: |
| References | |
| TAC MC3864 | |
| Download: ML050770297 (1) | |
Text
Seal Injection Flow 3.5.5 0
LI)
CL LI)
Iir a::
U)
LI)
An L) a::
l LU 03 LU7 LU C:
LIJ I
3 Lt]
L 3'
25 0Ir (n 20 to 15(
0 100 z
0o:
50 tof 760
'0 9 10. 111I 31I1 s1 81ao dt-SEAL INJECTION FLOW (GPM)
Figure 3.5.5-1 (page 1 of 1)
Seal injection Flow Limits
.W -- I 4V o I 23 Wolf Creek - Unit I 3.5-12 Amendment No. 4 12 160
Seal Injection Flow 3.5.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.5.1 NOTE' Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the Reactor Coolant System pressure stabilizes at > 2215 psig and *2255 psig.
Verify manual seal injection throttle valves are 18 months adjusted to give'a flow within the limits of Figure 3.5.5-1.
7 Jo Wolf Creek - Unit 1 3.5-11 Amendment No. 123