Duke Energy Corporation Letter of Intent to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition
ML050670305
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 02/28/2005
From: Barron H
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050670305 (3)


Text

PkDuke HENRY B. BARRON OrPowere Group VP, Nuclear Generation and Chief Nuclear Officer A Duke Energy Company Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 Mailing Address:

February 28, 2005 P. 0. Box 1006 - EC07H Charlotte, NC 28201-1006 704 382 2200 U. S. Nuclear Regulatory Commission 704 382 6056 fax Washington, DC 20555-0001 hbarron@duke-energy.com ATTENTION: Document Control Desk

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Letter of Intent to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition This letter serves to inform you of Duke Energy Corporation's (Duke) intent to adopt NFPA 805 (Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition) in accordance with 10 CFR 50.48(c).

The transition to the performance-based standard for fire protection is expected to commence in a staggered fashion with Oconee being the first to transition. Duke expects Oconee to begin the transition process in the second quarter of 2005 and will take 24 months to fully implement.

McGuire should be the next to begin transition followed by Catawba with all units complete by the end of 2009.

This schedule is subject to change depending on the extent to which the plant determines that it needs to make either physical modifications or changes to the fire protection program to comply with NFPA 805. 'An updated schedule will accompany the License Amendment Request required under 10 CFR 50.48(c)(3)(i).

In accordance with the interim enforcement policy, enforcement discretion is requested for NRC unresolved items (URI) related to Fire Protection. Duke has determined that a necessary prerequisite to transitioning to a performance-based fire protection program is performing the Appendix R Reconstitution Project at each plant. An extension to the enforcement discretion window is being requested for the following reasons:

(1) Within Duke and in the nuclear industry in general, there are limited experts in areas of Electrical Engineering (circuit analysis), System Engineering, and Appendix R Safe Shutdown, needed to support reconstitution of the Appendix R design basis and the transition to NFPA-805; 1007.

td 19().2 Heritage

  • Service
  • Vision www.dukepower.comr

U. S. Nuclear Regulatory Commission February 28,2005 Page 2 (2) Based on past experience at Duke, there is a strong desire to maintain consistency between our plants. If sufficient personnel (either in-house or contractor) are used to perform the Appendix R Reconstitution Project and the NFPA-805 transition in parallel, there is added burden to maintain the analysis consistency and quality; (3) Based on the fact that Oconee will be the first plant within Duke and in the industry to transition to NFPA-805, Duke believes that there is much to be learned from the first pilot plant. Duke plans to perform the transition at McGuire and Catawba after Oconee in order to learn from the pilot; and (4) Finally, Duke believes that the risk of extension of the enforcement discretion window is low since all issues have either been assessed as low risk or corrective actions taken.

Duke understands that this letter of intent initiates a period of enforcement discretion during which no enforcement actions will be taken for non-compliances discovered as a result of evaluations to support this licensing basis transition process.

The NFPA-805 transition process will proceed in three phases:

Phase I - Preliminary Assessment of the Fire Protection Program Technical and regulatory assessments performed to determine the feasibility and practicality of performing the transition.

Phase II - Reviews and Engineering Analysis Fundamental Fire Protection Program and Design Elements review Nuclear Safety Performance Criteria Transition review Non-Power Operational Mode Transition review Radiological Release Transition review.

Change Evaluations License Amendment Request Phase IlIl - Implementation Program Documentation Configuration Control Monitoring The process will be considered complete upon receipt of the approved License Amendment authorizing the transition to NFPA-805.

Duke considers our current licensing basis with respect to spurious actuation to be unclear.

During our transition to NFPA-805, Duke plans on clarifying the spurious actuation issue by implementing a new basis in accordance with the guidance in NEI-04-02, Revision F, Enclosure 2, Guidance for Implementing A Risk-Informed, Performance Based Fire-Protection Program under 10 CFR 50.48(c), July 2004.

Duke proposes that Oconee be considered a pilot plant for the initial implementation of performance-based fire protection using NFPA-805. As a part of this pilot process, Duke

U. S. Nuclear Regulatory Commission February 28,2005 Page 3 requests all licensing and review fees be waived for the License Amendment Request. Duke believes that our participation in the pilot process will benefit the NRC significantly through the experience gained throughout the NRC observation process. The pilot process will provide significant technical and process information that can be used as input into future revisions of the Regulatory Guide and industry guidance governing NFPA-805 transition. The experience gained by the NRC and Duke in developing, submitting and reviewing this Letter of Intent and the Transition Report will allow the development of valid industry templates for future licensees undergoing transition. Knowledge and experience gained in the observation process will provide valuable input into the NRC Inspection Guidance for transition. In addition, waiver of the licensing fees will somewhat offset the expense and burden of orchestrating the on-site observation process. Additionally, if no other pilot plants come forward this year, Duke offers McGuire as a second pilot plant. McGuire utilizes a different Nuclear Steam Supply System and has substantially different safe shutdown issues than Oconee.

This correspondence contains no regulatory commitments.

If you have any questions concerning this subject, please contact L. B. Jones at (704) 382-4753.

Very truly yours, A& 7 Henry B. Barron xc:

W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 J. J. Shea (addressee only)

NRC Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station L. N. Olshan (addressee only)

NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S. E. Peters (addressee only)

NRC Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station E. F. Guthrie NRC Senior Resident Inspector Catawba Nuclear Station