Catawba Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:52:13 Report 22 1
PS2-EP
- EP INSPECTION Baseline Inspections 03/14/2005 03/18/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Performance Indicator Verification IP 71151 1, 2 1
MTN-MR
- MR EFFECTIVENESS Baseline Inspections 03/21/2005 03/25/2005 Maintenance Effectiveness IP 7111112B 1, 2 1
MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 05/16/2005 05/20/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTNTI160
- 2515/160 U-1: PZR PENETRATION NOZZLES Safety Issues 05/16/2005 05/20/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 MTNSGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 05/23/2005 05/27/2005 Inservice Inspection Activities - PWR IP 7111108P 1
2 MNTISFSI
- ISFSI PAD CONSTRUCTION Other Routine 05/31/2005 06/03/2005 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 1, 2 1
MTN-HS
- HEAT SINK Baseline Inspections 08/01/2005 08/05/2005 Heat Sink Performance IP 7111107B 1, 2 2
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 08/22/2005 08/26/2005 Safety System Design and Performance Capability IP 7111121 1, 2 4
PS-RP
- RP PUBLIC BASLINE Baseline Inspections 08/22/2005 08/26/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Performance Indicator Verification IP 71151 1, 2 6
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 09/19/2005 09/23/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Safety System Design and Performance Capability IP 7111121 1, 2 3
OL PREP
- INITIAL PREP Not Applicable 11/14/2005 11/18/2005 CATAWBA/EXAMS AT POWER FACILITIES V23229 1
3 OL EXAM
- INITIAL EXAM Not Applicable 12/05/2005 12/09/2005 CATAWBA/EXAMS AT POWER FACILITIES V23229 1
3 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/13/2006 02/17/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Catawba Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:52:13 Report 22 3
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/13/2006 02/17/2006 Permanent Plant Modifications IP 7111117B 1, 2 3
PS-RP
- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 03/20/2006 03/24/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/20/2006 03/24/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/20/2006 03/24/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/20/2006 03/24/2006 Performance Indicator Verification IP 71151 1, 2 2
MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 03/27/2006 03/31/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNTI160
- 2515/160 U-2: PZR PENETRATION NOZZLES Safety Issues 03/27/2006 03/31/2006 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 MTNSGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 04/03/2006 04/07/2006 Inservice Inspection Activities - PWR IP 7111108P 2
3 PS1-RP
- RP OCCPATIONAL BASELINE - WEEK 2 Baseline Inspections 04/03/2006 04/07/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/03/2006 04/07/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/03/2006 04/07/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/03/2006 04/07/2006 Performance Indicator Verification IP 71151 1, 2 2
- REQUAL INSPECTION Baseline Inspections 04/24/2006 04/28/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 3
PS2-EP
- EP EXERCISE Baseline Inspections 05/16/2006 05/20/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 05/16/2006 05/20/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 05/16/2006 05/20/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.