Inspection / Activity Plan, 03/01/2005 - 09/30/2006
ML050610749
Person / Time
Site: Farley, 07200042  Southern Nuclear icon.png
Issue date: 03/03/2005
From:
NRC/RGN-II/DRP/RPB2
To:
Southern Nuclear Operating Co
Shared Package
ML050610747 List:
References
IR-05-001
Download: ML050610749 (3)


Text

Farley Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/03/2005 09:31:32 Report 22 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 03/01/2005 03/03/2005 Fire Protection IP 7111105T 1, 2 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Fire Protection IP 7111105T 1, 2 Baseline Inspections 04/04/2005 04/08/2005 Fire Protection IP 7111105T 1, 2 4

ISFSI

- ISFSI DRY RUN INSPECTION Other Routine 05/12/2005 05/31/2005 Preoperational Testing Of An ISFSI IP 60854 1, 2 1

PS1-RP

- RADIATION PROTECTION PRE-INSP VISIT Baseline Inspections 06/06/2005 06/10/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1

PB2-FP

- FLOOD PROTECTION Baseline Inspections 06/27/2005 06/30/2005 Flood Protection Measures IP 7111106 1, 2 4

PS1-RP

- RP PUBLIC BASELINE Baseline Inspections 06/27/2005 07/01/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Performance Indicator Verification IP 71151 1, 2 3

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 07/11/2005 07/15/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 07/11/2005 07/15/2005 Permanent Plant Modifications IP 7111117B 1, 2 1

PB2-PI&R

- PI&R PREINSPECTION VISIT Baseline Inspections 07/18/2005 07/22/2005 Identification and Resolution of Problems IP 71152B 1, 2 4

PB2-PI&R

- BIENNIAL PI&R Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2 1

PS2-EP

- EP INSPECTION/EXERCISE Baseline Inspections 08/22/2005 08/26/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Performance Indicator Verification IP 71151 1, 2 3

MTN-HEAD - U-2 REACTOR HEAD REPLACEMENT Other Routine 09/12/2005 09/16/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

2 MTN-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Farley Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/03/2005 09:31:32 Report 22 1

MTNTI160

- 2515/160 U-2: PZR PENTRATION NOZZLES Safety Issues 10/31/2005 11/04/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160 2

1 PS1-RP

- RP BASELINE & RX HEAD REPLACEMENT Other Routine 10/31/2005 11/04/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 1, 2 1

MTN-MR

- MR EFFECTIVENESS Baseline Inspections 12/05/2005 12/09/2005 Maintenance Effectiveness IP 7111112B 1, 2 1

MTN-HS

- HEAT SINK Baseline Inspections 02/13/2006 02/17/2006 Heat Sink Performance IP 7111107B 1, 2 1

PS1-RP

- RP PREINSPECTION OCCUPATIONAL/ ISFSI Baseline Inspections 03/13/2006 03/15/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 2

PS1-RP

- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 04/03/2006 04/07/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/03/2006 04/07/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/03/2006 04/07/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/03/2006 04/07/2006 Performance Indicator Verification IP 71151 1, 2 1

MTN-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 04/10/2006 04/14/2006 Inservice Inspection Activities - PWR IP 7111108P 1

1 MTNSGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 04/17/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1

3 PS1-RP

- RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 04/17/2006 04/21/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/17/2006 04/21/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Performance Indicator Verification IP 71151 1, 2 1

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 07/31/2006 08/02/2006 Safety System Design and Performance Capability IP 7111121 1, 2 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 08/14/2006 08/18/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 3

PS2-EP

- EP EXERCISE Baseline Inspections 09/11/2006 09/15/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 09/11/2006 09/15/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 09/11/2006 09/15/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Farley Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/03/2005 09:31:32 Report 22 6

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 09/11/2006 09/15/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 09/25/2006 09/29/2006 Safety System Design and Performance Capability IP 7111121 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.