Hatch Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:13:23 Report 22 2
PS1-RP
- RP OCCUPATIONAL BASELINE WK-2 Baseline Inspections 02/28/2005 03/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/28/2005 03/04/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/28/2005 03/04/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 02/28/2005 03/04/2005 Performance Indicator Verification IP 71151 1, 2 1
PB2-PIR
- PI&R PRE-INSP VISIT Baseline Inspections 06/20/2005 06/24/2005 Identification and Resolution of Problems IP 71152B 1, 2 4
PB2-PIR
- BIENNIAL PI&R Baseline Inspections 07/11/2005 07/15/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 07/25/2005 07/29/2005 Identification and Resolution of Problems IP 71152B 1, 2 1
PB2-FP
- FLOOD PROTECTION Baseline Inspections 08/15/2005 08/19/2005 Flood Protection Measures IP 7111106 1, 2 2
PS2-EP
- EP EXERCISE Baseline Inspections 10/03/2005 10/07/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 10/11/2005 10/14/2005 HATCH/EXAMS AT POWER FACILITIES V23230 1
1 MTN-HS
- HEAT SINK Baseline Inspections 10/24/2005 10/28/2005 Heat Sink Performance IP 7111107B 1, 2 3
OL EXAM
- INITIAL EXAM Not Applicable 10/31/2005 11/04/2005 HATCH/EXAMS AT POWER FACILITIES V23230 1
2 MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 02/20/2006 02/24/2006 Inservice Inspection Activities - BWR IP 7111108G 1
4 EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 03/07/2006 03/09/2006 Fire Protection IP 7111105T 1, 2 4
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 04/03/2006 04/07/2006 Fire Protection IP 7111105T 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Fire Protection IP 7111105T 1, 2 1
PS-RP
- RADIATION PROTECTION PREINSP VISIT Baseline Inspections 05/15/2006 05/19/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 4
PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 06/05/2006 06/09/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Hatch Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:13:23 Report 22 4
PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 06/05/2006 06/09/2006 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Performance Indicator Verification IP 71151 1, 2 1
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 06/13/2006 06/15/2006 Safety System Design and Performance Capability IP 7111121 1, 2 2
PS2-EP
- EP INSP Baseline Inspections 07/09/2006 07/13/2006 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 07/09/2006 07/13/2006 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 07/09/2006 07/13/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 07/09/2006 07/13/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 07/09/2006 07/13/2006 Performance Indicator Verification IP 71151 1, 2 6
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 07/10/2006 07/14/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 07/24/2006 07/28/2006 Safety System Design and Performance Capability IP 7111121 1, 2 1
MTN-MR
- MR EFFECTIVENESS Baseline Inspections 09/18/2006 09/22/2006 Maintenance Effectiveness IP 7111112B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.