Robinson Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 11:31:45 Report 22 6
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2
1 DRY RUN
- ISFSI DRY RUN Other Routine 06/15/2005 06/25/2005 Preoperational Testing Of An ISFSI IP 60854 2
1 ISFSI
- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2
1 MTN-MR
- MR EFFECTIVENESS Baseline Inspections 07/18/2005 07/22/2005 Maintenance Effectiveness IP 7111112B 2
3 MTN-HEAD - REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
Other Routine 09/19/2005 09/21/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
1 PS1-RP
- RP OCCUPATIONAL BASELINE WK1 Baseline Inspections 09/18/2005 09/22/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 09/18/2005 09/22/2005 ALARA Planning and Controls IP 7112102 2
Baseline Inspections 09/18/2005 09/22/2005 Performance Indicator Verification IP 71151 2
2 MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/03/2005 10/06/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 PS1-RP
- RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 2
2 MTNSGISI
- SG INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2
4 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2
Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2
4 PS1-RP
- RP BASELINE PUBLIC Baseline Inspections 07/31/2006 08/04/2006 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 07/31/2006 08/04/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2
Baseline Inspections 07/31/2006 08/04/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2
Baseline Inspections 07/31/2006 08/04/2006 Radiological Environmental Monitoring Program IP 7112203 2
Baseline Inspections 07/31/2006 08/04/2006 Performance Indicator Verification IP 71151 2
1 MTN-HS
- HEAT SINK Baseline Inspections 08/14/2006 08/18/2006 Heat Sink Performance IP 7111107B 2
3 OL PREP
- INITIAL EXAM PREP Not Applicable 08/21/2006 08/25/2006 ROBINSON/EXAM AT POWER FACILITIES V23242 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Robinson Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 11:31:45 Report 22 3
OL EXAM
- INITIAL EXAM Not Applicable 09/11/2006 09/15/2006 ROBINSON/EXAM AT POWER FACILITIES V23242 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.