Inspection / Activity Plan, 03/01/05 - 09/30/06
ML050610579
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML050610567 List:
References
IR-05-001
Download: ML050610579 (2)


Text

Page 1 of 2 Robinson 03/02/2005 11:31:45 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 6 2 IP 7111121 Safety System Design and Performance Capability 02/28/2005 03/04/2005 Baseline Inspections DRY RUN - ISFSI DRY RUN 1 2 IP 60854 Preoperational Testing Of An ISFSI 06/15/2005 06/25/2005 Other Routine ISFSI - ISFSI DRY RUN INSPECTION 1 2 IP 60854 Preoperational Testing Of An ISFSI 06/20/2005 06/24/2005 Other Routine MTN-MR - MR EFFECTIVENESS 1 2 IP 7111112B Maintenance Effectiveness 07/18/2005 07/22/2005 Baseline Inspections MTN-HEAD - REACTOR HEAD REPLACEMENT 3 2 IP 71007 Reactor Vessel Head Replacement Inspection 08/15/2005 08/19/2005 Other Routine 2 IP 71007 Reactor Vessel Head Replacement Inspection 09/19/2005 09/21/2005 Other Routine PS1-RP - RP OCCUPATIONAL BASELINE WK1 1 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2005 09/22/2005 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 09/18/2005 09/22/2005 Baseline Inspections 2 IP 71151 Performance Indicator Verification 09/18/2005 09/22/2005 Baseline Inspections MTN-ISI - U2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 10/03/2005 10/06/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL BASELINE WK2 1 2 IP 7112101 Access Control to Radiologically Significant Areas 10/03/2005 10/07/2005 Baseline Inspections 2 IP 71151 Performance Indicator Verification 10/03/2005 10/07/2005 Baseline Inspections MTNSGISI - SG INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 10/10/2005 10/14/2005 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 4 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/30/2006 02/03/2006 Baseline Inspections 2 IP 7111117B Permanent Plant Modifications 01/30/2006 02/03/2006 Baseline Inspections PS1-RP - RP BASELINE PUBLIC 4 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/31/2006 08/04/2006 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/31/2006 08/04/2006 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program 07/31/2006 08/04/2006 Baseline Inspections 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections MTN-HS - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 08/14/2006 08/18/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 2 V23242 ROBINSON/EXAM AT POWER FACILITIES 08/21/2006 08/25/2006 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Robinson 03/02/2005 11:31:45 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 3 2 V23242 ROBINSON/EXAM AT POWER FACILITIES 09/11/2006 09/15/2006 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.