Inspection / Activity Plan, 03/01/05 - 09/30/06
ML050610579
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML050610567 List:
References
IR-05-001
Download: ML050610579 (2)


Text

Robinson Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 11:31:45 Report 22 6

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2

1 DRY RUN

- ISFSI DRY RUN Other Routine 06/15/2005 06/25/2005 Preoperational Testing Of An ISFSI IP 60854 2

1 ISFSI

- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2

1 MTN-MR

- MR EFFECTIVENESS Baseline Inspections 07/18/2005 07/22/2005 Maintenance Effectiveness IP 7111112B 2

3 MTN-HEAD - REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

Other Routine 09/19/2005 09/21/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

1 PS1-RP

- RP OCCUPATIONAL BASELINE WK1 Baseline Inspections 09/18/2005 09/22/2005 Access Control to Radiologically Significant Areas IP 7112101 2

Baseline Inspections 09/18/2005 09/22/2005 ALARA Planning and Controls IP 7112102 2

Baseline Inspections 09/18/2005 09/22/2005 Performance Indicator Verification IP 71151 2

2 MTN-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/03/2005 10/06/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 PS1-RP

- RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 2

Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 2

2 MTNSGISI

- SG INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2

4 EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2

Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2

4 PS1-RP

- RP BASELINE PUBLIC Baseline Inspections 07/31/2006 08/04/2006 Access Control to Radiologically Significant Areas IP 7112101 2

Baseline Inspections 07/31/2006 08/04/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2

Baseline Inspections 07/31/2006 08/04/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2

Baseline Inspections 07/31/2006 08/04/2006 Radiological Environmental Monitoring Program IP 7112203 2

Baseline Inspections 07/31/2006 08/04/2006 Performance Indicator Verification IP 71151 2

1 MTN-HS

- HEAT SINK Baseline Inspections 08/14/2006 08/18/2006 Heat Sink Performance IP 7111107B 2

3 OL PREP

- INITIAL EXAM PREP Not Applicable 08/21/2006 08/25/2006 ROBINSON/EXAM AT POWER FACILITIES V23242 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Robinson Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 11:31:45 Report 22 3

OL EXAM

- INITIAL EXAM Not Applicable 09/11/2006 09/15/2006 ROBINSON/EXAM AT POWER FACILITIES V23242 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.