Inspection / Activity Plan, 03/01/2005 - 09/30/2006
ML050610529
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/02/2005
From:
Division Reactor Projects II
To:
Carolina Power & Light Co
Shared Package
ML050610521 List:
References
IR-05-001
Download: ML050610529 (2)


Text

Page 1 of 2 Harris 03/02/2005 11:48:02 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 03/07/2005 03/11/2005 Baseline Inspections PS2-EP - EMERGENCY EXERCISE 3 1 IP 7111401 Exercise Evaluation 04/04/2005 04/08/2005 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/04/2005 04/08/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/04/2005 04/08/2005 Baseline Inspections MTN-HS - HEAT SINK 2 1 IP 7111107B Heat Sink Performance 05/23/2005 05/27/2005 Baseline Inspections PB4-PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 06/13/2005 06/17/2005 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 06/27/2005 07/01/2005 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 4 1 IP 7111105T Fire Protection 07/25/2005 07/29/2005 Baseline Inspections PS-RP - RP PUBLIC 4 1 IP 7112101 Access Control to Radiologically Significant Areas 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 08/01/2005 08/05/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/01/2005 08/05/2005 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL 4 1 IP 7111105T Fire Protection 08/15/2005 08/19/2005 Baseline Inspections 1 IP 7111105T Fire Protection 08/29/2005 09/02/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23233 HARRIS/EXAMS AT POWER FACILITIES 01/09/2006 01/13/2006 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23233 HARRIS/EXAMS AT POWER FACILITIES 01/23/2006 02/03/2006 Not Applicable EB1-MODS - MODIFICATIONS/10CFR50.59 3 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/06/2006 02/10/2006 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 02/06/2006 02/10/2006 Baseline Inspections PS2-EP - EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/03/2006 04/07/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/03/2006 04/07/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Harris 03/02/2005 11:48:02 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1 IP 7112101 Access Control to Radiologically Significant Areas 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/10/2006 04/14/2006 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/10/2006 04/14/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/10/2006 04/14/2006 Baseline Inspections MTN-ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/17/2006 04/21/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK2 3 1 IP 7112101 Access Control to Radiologically Significant Areas 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/24/2006 04/28/2006 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/24/2006 04/28/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections MTNSGISI - STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/24/2006 04/28/2006 Baseline Inspections MTN-MR - MR EFFECTIVENESS 1 1 IP 7111112B Maintenance Effectiveness 06/26/2006 06/30/2006 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1 IP 7111121 Safety System Design and Performance Capability 09/18/2006 09/20/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.