Harris Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 11:48:02 Report 22 2
- REQUAL INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Licensed Operator Requalification Program IP 7111111B 1
3 PS2-EP
- EMERGENCY EXERCISE Baseline Inspections 04/04/2005 04/08/2005 Exercise Evaluation IP 7111401 1
Baseline Inspections 04/04/2005 04/08/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 04/04/2005 04/08/2005 Performance Indicator Verification IP 71151 1
2 MTN-HS
- HEAT SINK Baseline Inspections 05/23/2005 05/27/2005 Heat Sink Performance IP 7111107B 1
4 PB4-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 06/13/2005 06/17/2005 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 06/27/2005 07/01/2005 Identification and Resolution of Problems IP 71152B 1
4 EB2-TFP
- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 07/25/2005 07/29/2005 Fire Protection IP 7111105T 1
4 PS-RP
- RP PUBLIC Baseline Inspections 08/01/2005 08/05/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/01/2005 08/05/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 08/01/2005 08/05/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 08/01/2005 08/05/2005 Radiological Environmental Monitoring Program IP 7112203 1
Baseline Inspections 08/01/2005 08/05/2005 Performance Indicator Verification IP 71151 1
4 EB2-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/15/2005 08/19/2005 Fire Protection IP 7111105T 1
Baseline Inspections 08/29/2005 09/02/2005 Fire Protection IP 7111105T 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 01/09/2006 01/13/2006 HARRIS/EXAMS AT POWER FACILITIES V23233 1
3 OL EXAM
- INITIAL EXAM Not Applicable 01/23/2006 02/03/2006 HARRIS/EXAMS AT POWER FACILITIES V23233 1
3 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/06/2006 02/10/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 02/06/2006 02/10/2006 Permanent Plant Modifications IP 7111117B 1
1 PS2-EP
- EP INSPECTION Baseline Inspections 04/03/2006 04/07/2006 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 04/03/2006 04/07/2006 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 04/03/2006 04/07/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 04/03/2006 04/07/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 04/03/2006 04/07/2006 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Harris Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 11:48:02 Report 22 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 04/10/2006 04/14/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/10/2006 04/14/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/10/2006 04/14/2006 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/10/2006 04/14/2006 Performance Indicator Verification IP 71151 1
1 MTN-ISI
- INSERVICE INSPECTION Baseline Inspections 04/17/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1
3 PS1-RP
- RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 04/24/2006 04/28/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/24/2006 04/28/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/24/2006 04/28/2006 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/24/2006 04/28/2006 Performance Indicator Verification IP 71151 1
1 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 04/24/2006 04/28/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTN-MR
- MR EFFECTIVENESS Baseline Inspections 06/26/2006 06/30/2006 Maintenance Effectiveness IP 7111112B 1
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 09/18/2006 09/20/2006 Safety System Design and Performance Capability IP 7111121 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.