Change in Training Frequency for Personnel Who Have Overall Responsibility for Preparing Radioactive Hazardous Materials for Shipment
ML050610430
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 02/24/2005
From: Morris J
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050610430 (2)


Text

-'kDuke

OrPower, A Duke Energy Company February 24, 2005 U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk James R. Morris Vice President, Nuclear Support Nuclear Generation Duke Power EC07H/526 South Church Street Charlotte, NC 28202-1006 Mailing Address:

P. O. Box 1006 EC07H Chadotte, NC 28201-1006 704-382-6041 704-382-6056 fax

SUBJECT:

james.morris duke-energy.com Duke Energy Corporation Oconee Nuclear Station, Units 1,2, & 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1&2 Docket Nos. 50-369 and 50-370 Catawba Nuclear Station, Units 1 & 2 Docket Nos. 50-413, 50-414 Change in Training Frequency for Personnel Who Have Overall Responsibility for Preparing Radioactive Hazardous Materials for Shipment On March 31, 1993 a letter was submitted by Catawba, McGuire and Oconee Nuclear Stations adopting a training frequency of once every 2 years for personnel who have overall responsibility for preparing radioactive hazardous materials for shipment, as required by the Department of Transportation Final Rule, published in the Federal Register on May 15, 1992.

The purpose of this letter is to inform the staff that Duke Energy Corporation intends to change the training frequency for personnel who have the overall responsibility for preparing radioactive hazardous materials for shipment from once every two years to once every three years. This change meets the current requirements of 49 CFR part 172: subpart H for recurrent training.

If you have any questions regarding this submittal, please contact Mary Hazeltine at 704-382-5880.

Very truly yours, James R. Morris Vice President, Nuclear Support A oDI www. dukepower. corn

I U. S. Nuclear Regulatory Commission February 24, 2005 Page 2 xc w/att:

W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 23T85 61 Forsyth St., SW Atlanta, GA 30303 L. N. Olshan (Addressee only)

NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J. J. Shea (Addressee only)

NRC Senior Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S. E. Peters (Addressee only)

NRC Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. E. Shannon, NRC Senior Resident Inspector (ONS)

J. B. Brady, NRC Senior Resident Inspector (MNS)

E. F. Guthrie, NRC Senior Resident Inspector (CNS)