AmerGen SM AmerGen Energy Company, LLC Oyster Creek US Route 9 South, PO. Box 388 Forked River, NJ 08731-0388 www.exeloncorp.com An Exelon Company GL 97-02 February 11, 2005 2130-05-20036 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219
Subject:
Monthly Operating Report - January 2005 Enclosed is the January 2005 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.
Siner I C. N. Swenso Vice President, Oyster Creek Generating Station CNSIDIF
/
Enclosure cc:
S. J. Collins, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 05002
'j~ e4(11I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-219 Oyster Creek I F-ebruary 09,200U5 Hoger B Gayley (609) 971-4406 January 2005
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 470,468.00 Yr-to-Date 744.00 744.00 0.00 470,468.00 Cumulative 227,223.50 222,914.45 918.20 127,712,192.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
- During January, Oyster Creek generated 470,468 net MWh electric, which was 102.2% of its MDC rating.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)