Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1 Three ECCS accumulators shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2, MODE 3 with RCS pressure > 1000 psig.
NOTE ------------------------
In MODE 3, with RCS pressure > 1000 psig, the accumulators may be inoperable for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to perform pressure isolation valve testing per SR 3.4.14.1.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One accumulator A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable due to boron concentration to within concentration not within limits.
limits.
B.
One accumulator 3.1 Restore accumulator to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable for reasons OPERABLE status.
other than Condition A.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND not met.
C,2 Reduce RCS pressure to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
<- 1 000 psig.
D.
Two or more DA Enter LCO 3.0.3.
Immediately accumulators inoperable.
Farley Units 1 and 2 3.5.1-1 Amendment No. 162 (Unit 1)
Amendment No. 155 (Unit 2)
Accumulators 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FRECUENCY SR 3.5.1.1 Verify each accumulator isolation valve is fully open.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5.1.2 Verify borated watervolume in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 2 7555 gallons (31.4%) and < 7780 gallons (58.4%).
SR 3.5.1.3 Verify nitrogen cover pressure in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
Ž 601 psig and - 649 psig.
SR 3.5.1.4 Verify boron concentration In each accumulator Is 31 days 2Ž2200 ppm and < 2500 ppm.
AND NOTE-Only required to be performed for affected accumulators Once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of 2Ž12%
level, Indicated, that is not the result of addition
- from the refueling water storage tank SR 3.5.1.5 Verify power is removed from each accumulator 31 days isolation valve operator when RCS pressure is
Ž 2000 psig.
Farley Units 1 and 2 3.5.1-2 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
9,j 00
AC Sources -
Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:
- a.
Two qualified circuits between the offsite transmission network and the onsite Class I E AC Electrical Power Distrbution System; and
- b.
Two diesel generator (DG) sets capable of supplying the onsite Class 1 E power distribution subsystem(s); and
- c.
Automatic load sequencers for Train A and Train B.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION A.
One required offsite circuit inoperable.
REQUIRED ACTION COMPLETION TIME A.1 Perform SR 3.8.1.1 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> required OPERABLE offsite circuit.
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite offsite power available power to one train inoperable when its concurrent with redundant required inoperability of feature(s) is inoperable, redundant required feature(s) lAND (continued)
Farley Units 1 and 2 3.8.1-1 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit2)
AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
(continued)
A.3 Restore required offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE status.
AND 13 days from discovery of failure to meet LCO B.
One DG set inoperable.
NOTE-----------------
LCO 3.0.4 is not applicable when only one of the three DGs is inoperable.
B.1 Perform SR 3.8.1.1 for the required offsite circuit(s).
AND B.2 Declare required feature(s) supported by the inoperable DG set inoperable when its required redundant feature(s) is inoperable.
AND B.3.1 Determine OPERABLE DG set is not inoperable due to common cause failure.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)
Farley Units 1 and 2 3.8.1-2 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
AC Sources-Operating 3.8.1 ACTIONS CONDITION B.
(continued)
C.
Two required offsite circuits inoperable.
REQUIRED ACTION B.3.2 Perform SR 3.8.1.6 for OPERABLE DG set.
AND B.4 Restore DG set to OPERABLE status.
COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 10 days AND 13 days from discovery of failure to meet LCO 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required features C.1 Declare required feature(s) inoperable when its redundant required feature(s) is inoDerable.
AND C.2 Restore one required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> offsite circuit to OPERABLE status.
Farley Units 1 and 2 3.8. 1-3 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
AC Sources -Operating 3.8.1 ACTIONS CONDITION D. One required offsite circuit inoperable.
AND One DG set inoperable.
E. Two DG sets inoperable.
F.
Required Action and associated Completion Time of Condition C or E not met.
REQUIRED ACTION COMPLETION TIME
NOTE----------------
Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems -
Operating," when Condition D is entered with no AC power source to any train.
D.1 Restore required offsite circuit to OPERABLE status.
OR 0.2 Restore DG set to OPERABLE status.
E.1 Restore one DG set to OPERABLE status.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if all three DGs are inoperable OR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> if DG 1-2A and DG 1(2)B are inoperable OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if DG IC and DG 1(2)B are inoperable F.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Farley Units I and 2 3.8.1-4 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
AC Sources-Operating 3.8.1 ACTIONS CONDITION G.
One automatic load sequencer inoperable.
REQUIRED ACTION G.1 Restore automatic load sequencer to OPERABLE status.
COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> H.
Required Action and H.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, D, AND or G not met.
H2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I.
Three or more required AC 1.1 Enter LCO 3.0.3.
Immediately sources inoperable.
Farley Units 1 and 2 3.8.1-5 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
Accumulators 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators LCO 3.5.1 Three ECCS accumulators shall be OPERABLE.
APPLICABILITY:
MODES I and 2, MODE 3 with RCS pressure > 1000 psig.
NOTE------------------------------------------------
in MODE 3, with RCS pressure > 1000 psig, the accumulators maybe inoperable for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to perform pressure isolation valve testing per SR 3.4.14.1.
ACTIONS CONDITION A.
One accumulator inoperable due to boron concentration not within limits.
B.
One accumulator inoperable for reasons other than Condition A.
C.
Required Action and associated Completion REQUIRED ACTION COMPLETION TIME A.1 Restore boron concentration to within limits.
B.1 Restore accumulator to OPERABLE status.
C.1 Be in MODE 3.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 24 hours I
Time of Condition A or B AND not met.
C.2 Reduce RCS pressure to
- 1000 psig.
D. Two or more D.1 Enter LCO 3.0.3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours Immediately Farley Units I and 2 3.5.1-1 Amendment No. 162 (Unit 1)
Amendment No. 155 (Unit 2)
Accumulators 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify each accumulator isolation valve is fully open.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.5.1.2 Verify borated water volume in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
> 7555 gallons (31.4%) and < 7780 gallons (58.4%).
SR 3.5.1.3 Verify nitrogen cover pressure in each accumulator is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
> 601 psig and
- 649 psig.
SR 3.5.1.4 Verify boron concentration in each accumulator is 31 days
Ž 2200 ppm and
- 2500 ppm.
Al
-NTNEL I
NOTE -------
Only required to be performed for affected accumulators Once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of 2 12%
level, indicated, that is not the result of addition from the refueling water storage tank SR 3.5.1.5 Verify power is removed from each accumulator 31 days isolation valve operator when RCS pressure is
> 2000 psig.
Farley Units 1 and 2 3.5.1-2 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
Farlev Units 1 and 2 3.8.6-1 Amendment No. 146 (Unit 1)
Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for Train A and Service Water Intake Structure (SWIS)
Table 3.8.6-1.
Train B Auxiliary Building and batteries shall be within the limits of APPLICABILITY:
When associated DC electrical power subsystems are required to be OPERABLE.
ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each battery.
CONDITION A.
One or more required batteries with one or more battery cell parameters not within Category A or B limits.
REQUIRED ACTION A.1 Verify pilot cells electrolyte level and float voltage meet Table 3.8.6-1 Category C limits.
AND COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 24 hours AND A.2 Verify battery cell parameters meet Table 3.8.6-1 Category C limits.
Once per 7 days thereafter AND A.3 Restore battery cell 31 days parameters to Category A and B limits of Table 3.8.6-1.
Farley Units 1 and 2 38.6-1 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
Battery Cell Parameters 3.8.6 ACTIONS CONDITION B.
Required Action and associated Completion Time of Condition A not met.
REQUIRED ACTION COMPLETION TIME B.1 Declare associated Immediately battery inoperable.
OR One or more required batteries with average electrolyte temperature of the representative cells
< 600F for the Auxiliary Building batteries or < 350F for the SWIS batteries.
OR One or more required batteries with one or more battery cell parameters not within Category C values.
NOTE--------------
Battery terminal voltage of 127.8 volts as measured by SR 3.8.4.1 is equivalent to average cell float voltage of 2.13 volts per cell.
One or more required batteries with the average cell float voltage
- 2.13 volts.
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.6.1 Verify battery cell parameters meet Table 3.8.6-1 Category A limits.
Farley Units 1 and 2 3.8.6-2 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
Battery Cell Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.6.2 Verify battery ceil parameters meet Table 3.8.6-1 Category B limits.
SR 3.8.6.3 Verify average electrolyte temperature of representative cells is 2 600F for the Auxiliary Building batteries and > 350F for the SWIS batteries.
FREQUENCY 92 days AND Once within 7 days after a battery discharge
<110V AND Once within 7 days after a battery overcharge
> 150 V 92 days Farley Units 1 and 2 3.8.6-3 Amendment No. 146 (Unit 1)
Amendment No. 137 (Unit 2)
Battery Cell Parameters 3.8.6 Table 3.8.6-1 (page 1 of 1)
Battery Cell Parameters Requirements PARAMETER CATEGORY A:
CATEGORY B:
CATEGORY C:
LIMITS FOR EACH LIMITS FOR EACH ALLOWABLE LIMITS DESIGNATED CONNECTED CELL FOR EACH PILOT CELL CONNECTED CELL Electrolyte Level
> Minimum level
> Minimum level Above top of plates, indication mark, and indication mark, and and not overflowing
< 1/4 inch above
< '4 inch above maximum level maximum level indication mark(a) indication mark(a)
> 2.08 V 2.08 V
> 2.02 V Specific Gravity(b)
> i.19 5(C)
>1.190 If a cell is < 1.190, then it shall not have AND decreased more than 0.080 from the Average of all previous 92 day test.
connected cells
> 1.195 AND Average of all connected cells
Ž 1.190 (a) it is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.
(b)
Corrected for electrolyte temperature and level. Level correction is not required, however, when battery charging is < 2 amps when on float charge.
(c)
Or battery charging current of < 2 amps when on float charge is specific gravity limits.
Farlev Units 1 and 2 3.8.6-4 Ami acceptable for meeting andment No. 146 (Unit 1) andment No. 137 (Unit 2)
- -I-Am4
122' 122' 12"-
II"-
10" 0p C0 122' Ml
-I E-0 A%
w
'C C,wa4 U,
122'9" 12n' rl 122'r' 122' 6"
- 27 200 20C0 2500 300P 1000 I1500 RHR INTAKE FLOW (GA.f/MEN)