Fermi 2 6400 North Dixie Hlwy.,
Newport, MI 48166 Detroit Edison Generic Letter 97-02 February 9, 2005 NRC-05-0009 U. S. Nuclear Regulatory Commnission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for January 2005 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January 2005. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely,
,,,7, Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
E. R. Duncan N. K. Ray M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m
- DJED A DTE Energy Company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2 February 9. 2005 Kevin Burke (734) 586-5148 REPORTING PERIOD: January 2005
- 1.
Design Electrical Rating (MWe-Net) 1.150.00
- 2.
Maximum Dependable Capacity (MWe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3.
Number of Hours the Reactor Was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWH) 568.32 568.32 0.00 638.803 568 568 0.00 638,803 116.369 112,343 0.00 113.715,481 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Cause and Corrective Action F: Forced (Hours)
(1)
Shutting Comments S: Scheduled Down (2) 05-01 01/24/05 F
175.7 A
2 Plant shutdown caused by unidentified drywell leakage above Technical Specification limit. Inspection identified Drywell Cooler unit Number 4 failed end-bell gasket as the source of the leak. Shutdown continued into February 2005.
SUMMARY
The plant operated at full power until shutdown on January 24, 2005 at 1619 hours0.0187 days <br />0.45 hours <br />0.00268 weeks <br />6.160295e-4 months <br />.
At 2054 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.81547e-4 months <br />, drywell leakage identified as Emergency Equipment Cooling Water was isolated. At 2228 hours0.0258 days <br />0.619 hours <br />0.00368 weeks <br />8.47754e-4 months <br />, the Alert declaration was terminated based on source of leakage was not from the Reactor Coolant System. The leak was determined to be caused by a failed end-bell gasket on the Number 4 Drywell Cooler. A root cause team was established to review extent of condition and specify repair actions.
On January 25, 2005 plant shutdown was completed at 1321 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.026405e-4 months <br />, and continued into February 2005.
(1) Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E
Operator Training and License Examination F
Administration G Operational Error (Explain)
H Other (Explain)
(2) Method:
I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation S Other (Explain)