ML050530103
| ML050530103 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/15/2005 |
| From: | Overbeck G APS, Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 035-0073-DMS | |
| Download: ML050530103 (4) | |
Text
LAPS Palo Verde Nuclear Generating Station Gregg R. Overbeck Senior Vice President Nuclear TEL (623) 393-5148 FAX (623) 393-6077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 February 15, 2005 035-00733-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for JANUARY 2005 Enclosed are the Monthly Operating Reports for JANUARY 2005, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Ucenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
- sly, DMS/ap
Enclosures:
JANUARY 2005 Monthly Operating Reports cc:
(all w/enclosures)
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
~ cQ~ ~I
OPERATING DATA REPORT DOCKET NO.
50-528 UNIT NAME Palo Verde I DATE February 15, 2005 COMPLETED BY Don Vogt TELEPHONE 623-393-626 REPORTING PERIOD:
January 2005
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00
- 3. Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator Online
- 5.
Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 744.00 131,25222 744.00 744.00 129,803.70 0.00 0.00 0.00 907,103.61 907,103.61 156,398,590.89 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason I Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Began month in Mode 1: RX power at full power. Ended month in Mode 1: RX power at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Ucense Examination F Administration G Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-529 Palo Verde 2 FeDruary -I, Zuoo 9on Vogt 623393-5926 January 2005
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe.Net) 1,336.00 1,314.00 3.
4.
6.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 744.00 744.00 744.00 744.00 0.00 0.00 976,445.12 976,445.12 Cumulative 129,713.67 128,273.80
, 0.00 157,026,597.28 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Began month in Mode 1: RX power at full power. Ended month in Mode 1: RX power at full power.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TrIplScram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-530 Palo Verde 3 February 15, 2005 Don Vogt 623-393-6926 January 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator Online S.
Reserve Shutdown Hours
- 6.
Net Electrical EnergyGenerated (MWHrs)
This Month Yr-to-Date Cumulative 744.00 744.00 125,550.48 744.00 744.00 124,386.59 0.00 0.00 0.00 934,624.19 934,624.19 152,219,809.62 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reson Shutting Cause & Corrective Action S: Scheduled
{Hours)
Down 2 Comments
SUMMARY
- Began month in Mode 1: RX power at full power. Ended month in Mode 1: RX power at full power.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1