UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 611 RYAN PLAZA DRIVE. SUITE 400 ARLINGTON, TEXAS 76011-4005 February 18, 2005 Gregory M. Rueger, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424
SUBJECT:
MEETING
SUMMARY
FOR THE FEBRUARY 15,2005, PUBLIC MEETING REGARDING INSPECTION FINDINGS FROM AN ENGINEERING TEAM INSPECTION.
Dear Mr. Rueger:
This refers to the public meeting conducted at the Embassy Suites Hotel in San Luis Obispo, California, on February 15, 2005. The meeting was a technical meeting to discuss the results of an Engineering Team Inspection. The meeting attendance list is enclosed. The meeting was video taped by AGP Video and it is our understanding that the meeting will be broadcast over the local access channel in March 2005. A question concerning the Price-Anderson Act was presented by a member of the public. Information related to this topic can be found on the NRC website at www.nrc.qov/readins-rm/doc-collections/fact-sheets/funds.html.
In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readins-rm/adams/index.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Engineering Branch Division of Reactor Safety
Pacific Gas and Electric Company Dockets: 50-275 License: DRP-80 50-323 DRP-82
Enclosure:
Attendance List cc w/enclosures:
David H. Oatley, Vice President Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Lawrence F. Womack Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company and General Manager Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Room 370 County Government Center San Luis Obispo, CA 93408 Supervisors
Pacific Gas and Electric Company Truman Burns\\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 941 02-3298
-3.
Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Richard F. Locke, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-01 12 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814
Pacific Gas and Electric Company Electronic distribution by RIV:
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (DLP)
Branch Chief, DRPIE (WBJ)
Senior Project Engineer, DRPlE (VGG)
Team Leader, DRP/TSS (RLNI)
RlTS Coordinator (KEG)
DLStearns 21 / 8 105
, & A.
JAClark fl 21/$105 Initials: /*r 0 Non-Sensitive P Review Completed:
ADAMS: AS U N O Publicly Available Non-Publicly Available 0 Sensitive
I 1
PUBLIC MEETING AlTENDANCE LICENSEE/FACILITY DATE/TI ME LOCATION Pacific Gas & Electric Diablo Canyon Power Plant February 15,2005 6:OO p.m. (PDT)
Embassy Suites, San Luis Obispo, CA 1
\\
L, -
\\\\,"*
t I
a4A
/.'
1 *~.Q*+(-J
,&z-3....
1 ~ 7 y i L
PUBLIC MEETING ATTENDANCE I
LICENSEUFACILITY
LICENSEE/FACILITY DATE/TlME 3LIC MEETING ATTENDANCE Pacific Gas & Electric Diablo Canyon Power Plant February 15,2005 6:OO p.m. (PDT)
Embassv Suites. San Luis ObisDo. CA ORGANIZATION
I PUBLIC MEETING AlTENDANCE LICENSEUFACILITY DATER1 ME LOCATION Pacific Gas & Electric Diablo Canyon Power Plant February 15,2005 6:OO p.m. (PDT)
Embassy Suites, San Luis Obispo, CA I