MONTHYEARML24232A1812024-08-19019 August 2024 Summer_2024-04_RP Information Request ML24190A0412024-07-0505 July 2024 Notification of Inspection and Request for Information ML24170A3892024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review for VC Summer Containment Tendon Relief Request (L-2024-LLR-0035) ML24165A1912024-06-13013 June 2024 003 Radiation Safety Baseline Inspection Information Request ML24156A0022024-06-0303 June 2024 VC Summer SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Eric Carr ML24129A0722024-05-0808 May 2024 VC Summer SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Eric Carr ML24075A1872024-03-15015 March 2024 NRR E-mail Capture - Draft RAIs for Alternative Request RR-5-V2 (L-2023-LLR-0068) ML24067A0672024-03-0707 March 2024 NRR E-mail Capture - Draft RAIs for Inverter CT License Amendment Request TS 3.8.3.1, Onsite Power Distribution - Operating, (L-2023-LLA-0157) ML24061A1892024-03-0101 March 2024 NRR E-mail Capture - Request for Additional Information (RAI) for VC Summer Inverter License Amendment Request (LAR) to Revise the Emergency Plan ML24052A0102024-02-16016 February 2024 NRR E-mail Capture - Draft RAIs for Emergency Plan (EP) Changes License Amendment Request (LAR) (L-2023-LLA-0083) ML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23186A1392023-07-0505 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083) ML23131A1492023-05-10010 May 2023 2023 V.C. Summer Commercial Grade Dedication Inspection Information Request ML23044A3392023-02-13013 February 2023 NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002) ML23027A0122023-01-26026 January 2023 002 Radiation Safety Baseline Inspection Information Request ML23026A0152023-01-23023 January 2023 NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion Slides ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22173A0292022-06-17017 June 2022 NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052) ML22139A2302022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060) ML22139A2322022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059) ML22084A4052022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21197A0432021-07-15015 July 2021 VCS ISI 2021004 RFI - Combined ML21187A1242021-06-28028 June 2021 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification ML21173A1782021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21125A1942021-05-0505 May 2021 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20316A0122020-11-0404 November 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20302A2032020-10-28028 October 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20260H4262020-09-0303 September 2020 NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885 ML20178A5892020-06-26026 June 2020 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124) ML20178A5912020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21 ML20178A5932020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19 ML20149K4262020-05-21021 May 2020 NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092) ML19218A3742019-08-0606 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19214A2732019-08-0202 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19155A2752019-06-0404 June 2019 VC Summer 2019003 Rad Safety Inspection Document Request 2024-08-19
[Table view] |
Text
Charles R. Ogle - Fwd: Re: HELP ON SUMMER INSPECTION Page_1 From: Charles R. Ogle eC G/
To: Payne, Charlie Date: 6/24/04 7:38AM
Subject:
Fwd: Re: HELP ON SUMMER INSPECTION If you still need help
CharloR. 0 le - Re: HELP ON SUMMER INSPECTION Page 1 From: Sunil Weerakkody) 10 li .
To: Ogle, Charles R.
Date: 6122/04 5:30PM
Subject:
Re: HELP ON SUMMER INSPECTION Chuck:
I was at meetings all day. I called the number in the appended Email around 5.20 PM. Please ask Charlie to contact either Phil Qualls (301-415-1849) orAlex Klein (301-415-3477). In the mean time, here is my two cents (Please confirm with Alex or Phil you proceed):
- 1. The licensee may have an unapproved Manual Action.
- 2. If they do, Charlie should focus on determining the feasibility of the action using March 2003 Feasibility Criteria.
- 3. If they meet the criteria, this becomes an open Item (a green NCV).
They should be able close it when we issue the Interim enforcement discretion, until the rule is finalized.
- 4. If they cannot meet the March 2003 criteria, then the risk could be higher and you enter the enforcement space.
>>> Charles R. Ogle 06/22/04 09:37AM >>>
I know your folks are really busy, but we need to have someone talk to Charlie at Summer. We are in the second week of the TFP and are finding maior problems with the licensee's compliance strategy with Appendix R. As I understand it, they did not provide the protection required by III.G.2 and instead de-energize the electrical busses to avoid any maloperations. They then send operators out in the field to perform manual actions to verify that the de-energize components are in the proper position.
In response to our queries, the licensee has been unable to provide any licensing basis documentation to justify their approach. Though they are still looking for paper, their latest position is that this was discussed in phone calls with the NRC when they set up their fire protection program.
Looking ahead, assuming the licensee can't find any paper to document that this approach received NRC approval, I expect the risk will be very large.
Before we get too far down this path, I'd like to have the Inspectors talk this over with a technical expert to ensure that we aren't missing something really obvious. If one of your folks has a minute, I'd appreciate it if they could get in contact with Charlie Payne at the Summer RI office 803.345.5683 CC: Hannon, John; Klein, Alex; Koltay, Peter; Qualls, Phil
C-.\TEMP\GWI00001 .TMP Page 1 J
Mail Eeeo is D Mail Envelope Properties (40DABD36.606: 20: 51263)
Subject:
Fwd: Re: HELP ON SUMMER INSPECTION Creation Date: 6/24/04 7:38AM From: Charles R. Ogle Created By: CRO @nrc.gov Recipients Action Date & Time nrc.gov AThPO.ATIDO Delivered 06/24/04 07:38AM DCP (Charlie Payne) Opened 06/25/04 10:23AM Post Office Delivered Route AThPO.ATL_DO 06/24/04 07:38AM nrc.gov Files Size Date & Time MESSAGE 521 06/24/04 07:38AM Mail Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened