2/25/05, Perry - Withdrawal of an Amendment Request
ML050490118
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/25/2005
From: Macon W
NRC/NRR/DLPM/LPD3
To: Myers L
FirstEnergy Nuclear Operating Co
Macon W, NRR/DLPM,415-3965
References
TAC MB3893
Download: ML050490118 (6)


Text

February 25, 2005 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MB3893)

Dear Mr. Myers:

By letter dated April 26, 2004, you applied for an amendment to the Perry Nuclear Power Plant, Unit 1, Facility Operating License No. NPF-58. The proposed change would have revised the frequency of the Mode 5 Intermediate Range Monitoring Instrumentation CHANNEL FUNCTIONAL TEST contained in Technical Specification 3.3.1.1 from 7 days to 31 days.

Subsequently, by letter dated February 17, 2005, you withdrew the amendment request.

The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

William A. Macon, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next page

February 25, 2005 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308

SUBJECT:

PERRY NUCLEAR POWER PLANT - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MB3893)

Dear Mr. Myers:

By letter dated April 26, 2004, you applied for an amendment to the Perry Nuclear Power Plant, Unit 1, Facility Operating License No. NPF-58. The proposed change would have revised the frequency of the Mode 5 Intermediate Range Monitoring Instrumentation CHANNEL FUNCTIONAL TEST contained in Technical Specification 3.3.1.1 from 7 days to 31 days.

Subsequently, by letter dated February 17, 2005, you withdrew the amendment request.

The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

William A. Macon, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next page DISTRIBUTION:

Public RidsNrrDlpmLpdiii2 (GSuh) RidsNrrDlpmLpdiii (WRuland)

PD3-2 r/f RidsNrrPMWMacon DLPM DPR RidsOgcMailCenter RidsNrrLADClarke RidsAcrsAcnwMail, T2E26 DHills, RIII ADAMS Accession Number: ML050490118 OFFICE PM:LPDIII-2 LA:LPDIII-2 SC:LPDIII-2 NAME WMacon DClarke GSuh DATE 2/25/05 2/25/05 2/25/05 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc:

David W. Jenkins Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident Inspector's Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Dennis Clum Regional Administrator, Region III Radiological Assistance Section Supervisor U.S. Nuclear Regulatory Commission Bureau of Radiation Protection 801 Warrenville Road Ohio Department of Health Lisle, IL 60532-4531 P.O. Box 118 Columbus, OH 43266-0118 Sue Hiatt OCRE Interim Representative Zack A. Clayton 8275 Munson DERR Mentor, OH 44060 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Manager - Regulatory Compliance P.O. Box 1049 FirstEnergy Nuclear Operating Company Columbus, OH 43266-0149 Perry Nuclear Power Plant P.O. Box 97, A210 Chairman 10 Center Road Perry Township Board of Trustees Perry, OH 44081 3750 Center Road, Box 65 Perry, OH 44081 Director, Site Operations FirstEnergy Nuclear Operating Company Daniel Z. Fisher Perry Nuclear Power Plant Transportation Department P.O. Box 97, SB306 Public Utilities Commission Perry, OH 44081 180 East Broad Street Columbus, OH 43215-3793 Mayor, Village of North Perry North Perry Village Hall Joseph J. Hagan 4778 Lockwood Road Senior Vice President, Engineering and North Perry Village, OH 44081 Services First Energy Nuclear Operating Company Donna Owens, Director 76 South Main Street Ohio Department of Commerce Akron, OH 44308 Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009

Perry Nuclear Power Plant, Unit 1 cc:

Richard Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A290 10 Center Road Perry, OH 44081 Perry Nuclear Power Plant, Unit 1 Director, Regulatory Affairs FirstEnergy Nuclear Operating Company 395 Ghent Road Akron, OH 44333

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT, UNIT 1 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of FirstEnergy Nuclear Operating Company (the licensee), to withdraw its April 26, 2004, application for a proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit 1, located in Lake County, Ohio.

The proposed amendment would have revised the frequency of the Mode 5 Intermediate Range Monitoring Instrumentation CHANNEL FUNCTIONAL TEST contained in Technical Specification 3.3.1.1 from 7 days to 31 days.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on August 31, 2004 (69 FR 53109). However, by letter dated February 17, 2005, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated April 26, 2004, and the licensee's letter dated February 17, 2005, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in

accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 25th day of February 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

William A. Macon, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation