Appendix D Scenario Outline Form ES-D-1 Facility: SSES Scenario No.: IL0602A (SRO) Op-Test No.:

Examiners: Operators:

Initial Conditions: Unit 1 at 50% power EOL, Unit 2 in ,ade 4.

Turnover: Startup Bus 10 is currently suwlied from Startup Bus 20 with Tie Breaker OAlO502 closed The shift will be directed to restore the electric plant lineup to normal by transferrinq Startup Bus 10 to Startup Transformer I O . Followinu restoration of the electric plant lineup, the crew will continue with power ascension by pulling control rods and raise Dower 4 0 % . Standby Liquid Control Pump 1B is inoperable while maintenance investiqates a hiuh motor vibration.

Event No. I Malf.

No. I Event Type*

Event Description Transfer SUB I O to SUT I O

~ ~

Increase Reactor Power FW Flow Transmitter B Fails Low Steam Leak Detection Failure / HPCl Isolation Loss of Instrument Air Recirc Loop B Suction Line Break Auto ADS Logic Failure Rapid Depressurization LPCl Injection Valve HV-FO15B Fails to Auto-Open

~ ~~ ~

RPV Flooding

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor L-NUREG-1021,Revision 9 Susquehanna Facsimile 2004 NRC RE-Exam Rev. 0

Appendix D Scenario Outline Form ES-D-1 1 Facility: SSES Scenario No.: ILO-503A (ATC) Op-Test No.:

\-.-

Examiners: Operators:

Initial Conditions: Unit 1 at 65% power EOL, Unit 2 in Mode 1.

Turnover: The scenario begins with Unit 1 at 65% power, rod seuuence BZSU step 550 and RX Enqineer is finalizing instructions for increasing power. Instrument Air compressor B is out of service for rebuild. SRV R is leakinq. Reactor Recirc B is experiencing seal oscillations accompanied bv seal staqe Hi/Lo flow alarms. Unit 2 is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from svnchronizing to the qrid. Fuel handlinq is in proqress in Unit 1 Spent Fuel Pool.

~~

Event Malf. Event Event No. No. Type* Description 1 C RRP B Lower Seal Failure 2 R Control Rod Drift OUT 3 C RRP B Upper Seal Failure 4 C, M LOCA Inside Drywell HPCI Auto Start Failure/Trip D/G Start Failure Loss Of Offsite Power (LOOP) 1A201 Bus Lockout Rapid Depressurization LPCl Injection Valve HV-FOI5B Fails to Auto-Open,

  • (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9 Susquehanna Facsimile 2004 NRC RE-Exam Rev. 0

Facility: SSES Scenario No.: ILO-302 (Backup) Op-Test No.:

Initial Conditions: Unit 1 at 75% power EOL, Unit 2 in Mode 4 Turnover: CRD Dump 1B is out of service for breaker maintenance and is not expected to return this shift.

Condensate pump 1B has a Dossible ground, requirinq the crew to remove 1B Condensate pump from service for inspection. No surveillance activities are Dlanned or due durinq the shift. Chemistry and Reactor Enaineerinq are investiaatina a spike in Off-Gas activitv durina the last Control Rod Exercise S urveiIlance.

~

Event Malf. Event Event No. No. Type* Description 1 N Shutdown 1B Condensate Pump 2 1 I C I Condensate Minimum Flow Recirc Valve Failure 1 I I A Narrow Range Level Instrument Fails Upscale 4 C Fuel Clad Failure RPS AFailure to Trip (Momentary ATWS) 5 I

~~ ~

6 C D Main Steam Line Failure to Isolate 7 C,M Main Steam Line Leak in Turbine Building 8 M Radioactivity Release 9 M Rapid Depressurization

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 9 Susquehanna Facsimile 2004 NRC RE-Exam Rev. 0