April 27, 2005 Dennis Koehl Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

REVIEW OF POINT BEACH NUCLEAR PLANT, UNIT 2, STEAM GENERATOR TUBE INSPECTION REPORTS FOR 2003 REFUELING OUTAGE (TAC NO. MC2070)

Dear Mr. Koehl:

By letters dated November 7, 2003 and October 13, 2004, Nuclear Management Company, LLC, the licensee for Point Beach Nuclear Plant (Point Beach), Unit 2, submitted reports summarizing the steam generator (SG) tube inspections performed at Point Beach, Unit 2, during Refueling Outage 26 in the fall of 2003.

The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by their technical specifications. In addition, the NRC staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. TAC No. MC2070 has been closed, based on issuance of this letter.

Sincerely,

/RA/

Harold K. Chernoff, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-301 cc: See next page

ML050460097 *Memo dated 11/8/2004 NRR-106 OFFICE PDIII-1/PM PDIII-1/LA EMCB/C PDIII-1/SC NAME HChernoff DClarke LLund LRaghavan DATE 4/26/05 02/25/05 11/08/04 4/27/05

Point Beach Nuclear Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. F. D. Kuester President & Chief Executive Officer WE Generation 231 West Michigan Street Milwaukee, WI 53201 Regulatory Affairs Manager Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Mr. Jeffery Kitsembel Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Site Director of Operations Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241