MONTHYEARML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commissions Analysis of Dominion Energy Kewaunees Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML22076A0652022-03-15015 March 2022 Energy Solutions and Dominion Energy Kewaunee - Supplement to License Transfer Application Related to Use of Existing Dominion Energy Quality Assurance Program ML22060A1912022-02-25025 February 2022 Response to Request for Additional Information Related to Submittal for Approval of the Kewaunee Solutions Decommissioning Quality Assurance Program (Dqap), Revision O for Kewaunee Power Station (KPS) ML22066A4982022-02-24024 February 2022 Nuclear Property Insurance Coverage ML22047A0572022-02-16016 February 2022 Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program ML22032A3242022-02-0202 February 2022 Letter to C. Sly, Dominion, from B. Watson, NRC - Dominion Energy Kewaunee, Inc. - RAI Regarding Energysolutions Submittal for Approving Decommissioning Quality Assurance Program IR 05000305/20210012021-12-27027 December 2021 NRC Inspection Report Nos. 05000305/2021001 (Dnms); 07200064/2021001 (DNMS) ML21351A4352021-12-19019 December 2021 U.S. Nuclear Regulatory Commission'S Analysis of Dominion Energy Kewaunee, Inc.'S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21309A0152021-11-0909 November 2021 Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21301A1782021-10-28028 October 2021 Response to Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License ML21294A3652021-10-21021 October 2021 Changes to Decommissioning Trust Agreement ML21288A5572021-10-18018 October 2021 Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21277A2462021-09-29029 September 2021 Resubmittal of Solutions Decommissioning Quality Assurance Program (Dqap), Revision 0 2024-01-26
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML22047A0572022-02-16016 February 2022 Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program ML21131A1412021-05-10010 May 2021 Application for Order Approving Transfer of Control of KPS License and Conforming License Amendments ML19130A1952019-05-0808 May 2019 Letter - FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML16323A1932016-11-16016 November 2016 Resubmittal of Request for Approval of Security Plan ML16216A1872016-07-28028 July 2016 License Amendment Request 263; Load Drop Analysis for Spent Fuel Cask Handling Operations ML15261A2382015-09-14014 September 2015 License Amendment Request 259, ISFSI-Only Emergency Plan and Emergency Action Level Scheme ML15261A2362015-09-14014 September 2015 License Amendment Request 260, Proposed Changed to License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pool ML14029A0642014-01-16016 January 2014 Evaluation ETE-NAF-20130072, Revision 0, Kewaunee Spent Fuel Pool Zirconium Fire Parameter Comparison ML14029A0672014-01-16016 January 2014 Sargent & Lundy Calculation 2013-11284, Revision 0 - Maximum Cladding and Fuel Temperature Analysis for Uncovered Spent Fuel Pool ML14029A0662014-01-16016 January 2014 Calculation RA-0050, Revision 0 - Kewaunee Resin Cask Drop Dose Consequence Analysis ML14029A0652014-01-16016 January 2014 Calculation RA-0049, Revision 1, Addendum a - Kewaunee Emergency Action Levels for Post - Cessation of Power Operations ML14029A0632014-01-16016 January 2014 Kewaunee,Calculation 2013-07050, Revision 2 - Maximum Cladding Temperature Analysis for an Uncovered Spent Fuel Pool with No Air Cooling ML14029A0622014-01-16016 January 2014 Calculation RA-0044, Revision 1 - Dose Rate at the KPS Site Boundary Following a Complete Draindown of the Spent Fuel Pool ML14029A0612014-01-16016 January 2014 Enclosure 4 to 13-495A - Supporting Evaluations and Calculations ML14029A0592014-01-16016 January 2014 Enclosure 3 to 13-495A - Permanently Defueled Emergency Action Level Basis Document ML14029A0572014-01-16016 January 2014 Enclosure 2 to 13-495A - Permanently Defueled Emergency Action Level Scheme ML14029A0562014-01-16016 January 2014 Enclosure 1 to 13-495A - Permanently Defueled Emergency Plan ML14029A0552014-01-16016 January 2014 Attachment 2 to 13-495A - Comparison Matrix for Permanently Defueled Eals, Based Upon Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels, Revision 6 ML14029A0542014-01-16016 January 2014 Attachment 1 to 13-495A - Discussion of Change, Technical Analysis, Significant Hazards Determination, and Environmental Considerations ML14029A0532014-01-16016 January 2014 License Amendment Request 257, Permanently Defueled Emergency Plan and Emergency Action Level Scheme NEI 99-01, Kewaunee, Attachment 2 to 13-495A - Comparison Matrix for Permanently Defueled Eals, Based Upon Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels, Revision 62014-01-16016 January 2014 Kewaunee, Attachment 2 to 13-495A - Comparison Matrix for Permanently Defueled Eals, Based Upon Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels, Revision 6 ML13156A0372013-05-29029 May 2013 License Amendment Request 256, Permanently Defueled License and Technical Specifications ML12248A1492012-08-29029 August 2012 Submittal of Revision to Locked Rotor Radiological Accident Analysis: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications ML12219A0702012-07-30030 July 2012 License Amendment Request 254: Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML11222A1232011-07-25025 July 2011 License Amendment Request 244: Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications ML11137A0282011-05-0909 May 2011 License Amendment Request 252, Operation of Service Water Flow to Component Cooling Heat Exchangers ML1022904202010-08-0909 August 2010 License Amendment Request 244: Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications ML1013803992010-05-12012 May 2010 License Amendment Request 249: Conversion to Improved Technical Specifications (TAC No. ME02467) - Request to Change Proposed Service Water and Main Steam Isolation Valve Specifications ML1011101232010-04-13013 April 2010 License Amendment Request 246: Revision to Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Limitations ML0933602472009-11-20020 November 2009 Request for Approval of Cyber Security Plan ML0924403712009-08-24024 August 2009 License Amendment Request 249, Conversion to Improved Technical Specifications ML0912710592009-06-0101 June 2009 License Amendment No. 206, Containment Purge and Vent Isolation Valves Surveillance Requirement ML0902602992009-01-23023 January 2009 License Amendment Request 247: Emergency Diesel Generator Fuel Oil Technical Specification Changes ML0825507002008-09-11011 September 2008 License Amendment Request 242: Extension of the One-time Fifteen Year Containment Integrated Leak Rate Test Interval ML0823211982008-08-18018 August 2008 Application to Use Weighting Factors for External Exposure ML0823200832008-08-14014 August 2008 License Amendment Request 229, Change Technical Specifications to Require Testing Containment Purge and Vent Isolation Valves When the Reactor Is Above Cold Shutdown ML0823410392008-08-12012 August 2008 Applicants Environmental Report, Operating License Renewal Stage ML0819902662008-07-16016 July 2008 License Amendment Request 238: Increase in Technical Specification Minimum Injection Accumulator Boron Concentration ML0819303172008-07-0707 July 2008 License Amendment Request 239 for Review and Approval of Seismic Analysis Methodology for Auxiliary Building Crane ML0810604762008-04-14014 April 2008 License Amendment Request- 224, Steam Line Isolation Function Applicability ML0809504692008-04-0404 April 2008 License Amendment Request 237: Removal of Shield Building and Auxiliary Building Special Ventilation Train Filter Heater Requirements ML0809500962008-04-0303 April 2008 Response to NRC Request for Additional Information License Amendment Request 210. Technical Specification Modifications Regarding Control Room Envelope Habitability ML0806305402008-03-28028 March 2008 Issuance of License Amendment 196 Nuclear Core Design and Safety Analysis Methods ML0731707052007-11-0909 November 2007 License Amendment Request 227 Relocation of Spent Fuel Pool Crane Technical Specification to Technical Requirements Manual ML0731804992007-11-0909 November 2007 License Amendment Request 234 - Request for Review and Approval of Methodology Change Regarding Auxiliary Building Crane Upgrade ML0727605722007-10-0202 October 2007 License Amendment Request - 232 Operability Testing of Emergency Diesel Generators ML0726802782007-09-24024 September 2007 License Amendment Request 228 Incorporation of Dominion Nuclear Analysis and Fuel Topical Report DOM-NAF-5 Into Technical Specifications ML0726201442007-09-14014 September 2007 License Amendment Request 210 - Technical Specification Modifications Regarding Control Room Envelope Habitability ML0718600752007-07-0202 July 2007 License Amendment Request - 223, Deletion of License Condition 2.C (5), Fuel Burnup ML0717002572007-06-12012 June 2007 License Amendment Request - 217 Revision to Reactor Trip Permissive Setpoints 2022-02-16
[Table view] |
Text
GoM Y
to Pimmftte Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC January 27, 2005 NRC-05-011 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 License Amendment Request 205a To The Kewaunee Nuclear Power Plant Technical Specifications, Change to Accumulator Completion Time and Deletions of Items from Table TS 4.1-1
References:
- 1) Letter from T Coutu (NMC) to Document Control Desk (NRC),
"LAR 205 to the Kewaunee Nuclear Power Plant Technical Specifications, Change to Accumulator Completion Time and Deletions of Items from Table TS 4.1-1," dated July 6, 2004.
- 2) Letter from CF Lyon (NRC) to T Coutu (NMC), "Kewaunee Nuclear Power Plant - Issuance of Amendment Re: Accumulator Completion Time (TAC NO. MC3771)," dated October 5,2004.
Pursuant to 10 CFR 50.90, the Nuclear Management Company, LLC, (NMC) is submitting this supplement to License Amendment Request (LAR) 205 to the Kewaunee Nuclear Power Plant (KNPP) Technical Specifications (TS). The LAR 205 originally deleted Table TS 4.1-1, Item 22, "Accumulator Level and Pressure," in its entirety.
However, the NMC wishes to retain the surveillance to perform a check each shift as listed in Table TS 4.1-1, Item 22. Therefore, this supplement will restore Table TS, Item 22, and relocate only its calibration requirements to plant procedures. This change does not affect the regulatory safety analysis or the environmental considerations evaluation submitted in reference 1.
The original LAR also proposed to extend the completion time in the KNPP TS 3.3.a.2.B and to relocate Table TS 4.1-1, Item 25, "Portable Radiation Survey Instruments," to the Technical Requirements Manual. The NRC issued a safety evaluation (SE) on October 5, 2004 (reference 2), approving the change to TS 3.3.a.2.B for the accumulator completion time. This supplemental LAR does not change any information related to the accumulator completion time that has already been approved or to the proposed change to portable radiation survey instruments that is currently under review.
N490 Highway 42 . Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560
Document Control Desk Page 2 Enclosure I to this letter contains an evaluation of the proposed change to Table TS 4.1-1, Item 22. Enclosure 1 does not include a regulatory analysis nor an environmental considerations evaluation, as the original evaluations of LAR 205 remain unchanged. Enclosure 2 contains the marked up TS pages and Enclosure 3 contains the affected (revised) TS pages. Note that Table TS 4.1-1, page 4 of 7, is affected by LAR 204, which is currently on the docket.
No new commitments are made as a result of this supplemental LAR. Once approved, the amendment will be implemented within 60 days. If you have any questions or require additional information, please contact Mr. Gerald Riste at (920) 388-8424. A complete copy of this submittal has been transmitted to the State of Wisconsin as required by 10 CFR 50.91(b)(1).
I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 27, 2005.
LamLAL4 Craig W. be Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosures (3) cc: Administrator, Region l1l, USNRC Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin
ENCLOSURE I NUCLEAR MANAGEMENT COMPANY, LLC, EVALUATION OF LICENSE AMENDMENT REQUEST 205a TO KEWAUNEE NUCLEAR POWER PLANT, OPERATING LICENSE NO. DPR-43, DOCKET NO. 50-305
1.0 DESCRIPTION
The Nuclear Management Company (NMC), LLC, proposes to supplement a license amendment request (LAR) made to amend the Kewaunee Nuclear Power Plant (KNPP) operating license DPR-43, Appendix A, 'Technical Specifications." The LAR 205 (reference 1) originally deleted Technical Specification (TS) Table TS 4.1-1, Item 22, "Accumulator Level and Pressure," in its entirety. However, the NMC wishes to retain the surveillance to perform a check each shift as listed in Table TS 4.1-1, Item 22.
Therefore, this supplemental LAR (LAR 205a) will restore Item 22 and relocate only the 18 month calibration listed in Table TS 4.1-1, Item 22, "Accumulator Level and Pressure," from the TS to plant procedures. This change does not affect the outcome of the regulatory safety analysis or the environmental considerations submitted in reference 1.
The original LAR also proposed to extend the accumulator completion time in the KNPP TS 3.3.a.2.B and to relocate Table TS 4.1-1, Item 25, 'Portable Radiation Survey Instruments." The NRC issued a safety evaluation (SE) on October 5, 2004 (reference 2), approving the change to TS 3.3.a.2.B for the accumulator completion time. This supplemental LAR does not change any information related to the approved accumulator completion time that has already been approved and also does not change any information related to the portable radiation survey instrument change that is currently under NRC review.
2.0 PROPOSED CHANGE
The following change is proposed in this supplemental LAR. The marked up and the affected TS page showing the proposed change are located in Enclosures 2 and 3, respectively.
- 1. Restore Table TS 4.1-1, Item 22, "Accumulator Level and Pressure," in its entirety. Delete only the calibration requirement from Table TS 4.1-1, Item 22, "Accumulator Level and Pressure." The calibration requirement will be relocated to plant procedures.
3.0 BACKGROUND
In December 1992, the NRC completed a comprehensive examination of surveillance requirements in TS that require testing during power operation. The effort was part of the NRC Technical Specification Improvement Program (TSIP). The results were reported in NUREG-1 366, "Improvements to Technical Specification Surveillance Requirements," (reference 3). On September 27, 1993, the NRC issued Generic Letter (GL) 93-05, 'Line-Item Technical Specification Improvements to Reduce Surveillance Requirements for Testing During Power Operation," (reference 4). This correspondence provided licensees with guidance for implementing the recommendations of NUREG-1366.
Page 1 of 3
In the reference 1 submittal, the NMC removed the entire contents of Table TS 4.1-1, Item 22. However, after further review of the GL 93-05, the NMC recognized that the checks performed each shift as required by this TS line item should have been retained.
The checks each shift are used to confirm accumulator operability. Generic Letter 93-05 specifically stated that the only surveillance that should be retained is that required to confirm that the parameters defining accumulator operability are within their specified limits. Additionally, the GL text describes removing the analog channel operational test and channel calibrations from TS to existing plant procedures. Therefore, the NMC proposes to restore Item 22 of Table TS 4.1-1 and relocate only the calibration requirements. There is no analog channel operational test specified in KNPP TS. The relocation of the calibration requirements of Table TS 4.1-1, Item 22, "Accumulator Level and Pressure," to plant procedures is consistent with and implements the recommendations of GL 93-05.
4.0 TECHNICAL ANALYSIS
This change relocates the accumulator water level and pressure calibrations from TSs to plant procedures. This change is consistent with industry recognition that accumulator instrumentation operability is not directly related to the capability of the accumulators to perform their safety function. This proposed change implements GL 93-05, Item 7.4, "Accumulator Water Level and Pressure Channel Surveillance Requirements (PWR)."
5.0 REGULATORY SAFETY ANALYSIS This proposed change does not affect the original regulatory safety analysis submitted in reference 1. Please refer to the original regulatory safety analysis in reference 1.
6.0 ENVIRONMENTAL CONSIDERATION
S This proposed change does not affect the original environmental considerations review submitted in reference 1. Please refer to the original environmental considerations review in reference 1.
7.0 REFERENCES
- 1. Letter to Document Control Desk (NRC) from T Coutu (NMC), "LAR 205 to the Kewaunee Nuclear Power Plant Technical Specifications, Change to Accumulator Completion Time and Deletions of Items from Table TS 4.1-1,"
dated July 6, 2004.
- 2. Letter from CF Lyon (NRC) to T Coutu (NMC), "Kewaunee Nuclear Power Plant-Issuance of Amendment Re: Accumulator Completion Time (TAC NO. MC3771)," dated October 5, 2004.
- 3. NUREG-1366, "Improvements to Technical specification Surveillance Requirements," dated December 1992.
Page 2 of 3
- 4. Generic Letter (GL) 93-05, "Line-item Technical Specification Improvements to Reduce Surveillance Requirements for Testing During Power Operation," dated September 27, 1993.
Page 3 of 3
ENCLOSURE 2 NUCLEAR MANAGEMENT COMPANY, LLC, MARKED UP TS PAGES FOR LICENSE AMENDMENT REQUEST 205a TO KEWAUNEE NUCLEAR POWER PLANT, OPERATING LICENSE NO. DPR-43, DOCKET NO. 50-305 Marked Up TS Pages:
Table TS 4.1-1, Page 4 of 7 I page follows
TABLE TS 4.1-1 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TEST OF INSTRUMENT CHANNELS CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS
- 18. a. Containment Each shift Each refueling cycle Monthly(a) (a) Isolation Valve Signal Pressure (SIS signal)
- b. Containment Each shift(a) Each refueling cycle(a) Monthly(a) (a) Narrow range containment pressure Pressure (-3.0, +3.0 psig excuded)
(Steamline Isolation) __3_0__ _3_0___ _ __ __ _ __ __ _
- c. Containment Each shift Each refueling cycle Monthly Pressure (Containment Spray Act) _
- d. Annulus Pressure Not applicable Each refueling cycle Each refueling (Vacuum Breaker) cycle
- 19. Radiation Monitoring Daily (a,b) Each refueling cycle (a) Quarterly (a) (a) Includes only channels R1 1 thru R1 5, R1 9, System R21, and R23 l_ . (b) Channel check required in all plant modes
- 20. Deleted
- 21. Containment Sump Level Not applicable Not applicable Each refueling l_ cycle
- 22. Accumulator Level and Each shift EaGh refueling Not applicable Pressure GyleDleted__
- 23. Steam Generator Each shift Each refueling cycle Monthly Pressure Amendment No. 151LAR 205a I Page 4 of 7 02412/2004
ENCLOSURE 3 NUCLEAR MANAGEMENT COMPANY, LLC, AFFECTED TS PAGES FOR LICENSE AMENDMENT REQUEST 205a TO KEWAUNEE NUCLEAR POWER PLANT, OPERATING LICENSE NO. DPR-43, DOCKET NO. 50-305 Affected TS Pages:
Table TS 4.1-1, Page 4 of 7 I page follows
. hi TABLE TS 4.1-1 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TEST OF INSTRUMENT CHANNELS CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS 3
- 18. a. Containment Each shift Each refueling cycle Monthly(a) (a) Isolation Valve Signal Pressure (SIS signal) l
- b. Containment Each shift(a) Each refueling cycle(a) Monthly(a) (a) Narrow range containment pressure Pressure (-3.0, +3.0 psig excluded)
(Steamline Isolation) l
- c. Containment Each shift Each refueling cycle Monthly Pressure (Containment Spray Act) . .
- d. Annulus Pressure Not applicable Each refueling cycle Each refueling (Vacuum Breaker) cycle
- 19. Radiation Monitoring Daily (a,b) Each refueling cycle (a) Quarterly (a) (a) Includes only channels R11 thru R15, R19, System R21, and R23 (b) Channel check required in all plant modes
- 20. Deleted
- 21. Containment Sump Level Not applicable Not applicable Each refueling cycle
- 22. Accumulator Level and Each shift Deleted Not applicable Pressure I
- 23. Steam Generator Each shift Each refueling cycle Monthly Pressure Page 4 of 7 I