Enclosure 4: Risk Informed Technical Specification Task Force Risk Management Technical Specification Initiative Status
ML050380357
Person / Time
Issue date: 02/08/2005
From: Tjader T
NRC/NRR/DIPM/IROB
To: Bradley B
Nuclear Energy Institute
Tjader T., NRC/IROB, 415-1187
Shared Package
ML050380338 List:
References
Download: ML050380357 (6)


Text

RISK INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF)

RISK MANAGEMENT TECHNICAL SPECIFICATION INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 1 Technical Specification

  • Industry revising

Required Actions implementation guidance TSTF-423. The NRC/RITSTF agreed to Preferred End States for TSTF-422 and TSTF- resolutions for all the NRC comments. TSTF-423 R0 (BWROG) 423 to address NRC comments.

  • A draft of the TSTF-422 implementation guidance TSTF-431 R0 (BWOG) document was provided to the NRC for comment in 6/04. NRC provided comments on 7/9/04 and a TSTF-432 R0 (WOG) revised document has been developed to address (Not created) these comments. A revised draft was submitted to the NRC on 9/21/04.
  • The NRC provided comments on the TSTF-422 implementation guidance on October 13. The RITSTF is revising the document to address the NRCs comments.
  • The WOG transmitted the final TSTF-422 implementation guidance to NEI on 12/2/04. NEI forwarded the document to the NRC in 12/04.
  • NRC plants to issue TSTF-422 Notice for Comment in March 2005.
  • TSTF-423 was submitted to the NRC on 8/12/03.
  • RITSTF provided draft responses to NRC comments on TSTF-423 at the 1/30/04 meeting.
  • The NRC provided comments on the TSTF-423 implementation guidance on October 13. The RITSTF revised the document to address the NRCs comments.
  • NRC plants to issue TSTF-423 Notice for Comment in March 2005.

NEI RITSTF NEI Biff Bradley, 202 739-8083 WOG Jack Stringfellow, Southern Nuclear, 205 992-7037 CEOG Alan Hackerott, OPPD, 402 533-7276 Tony Pietrangelo, 202 739-8081 Jim Andrachek, Westinghouse, 412 374-5018 Gary Chung, SCE, 949 368-9431 EXCEL/ Jerry Andre, Westinghouse, 412 374-4723 Ray Schneider, CE, 860 731-6461 TSTF Donald Hoffman, 301 984-4400 EPRI Frank Rahn, 650 855-2037 BWOG Paul Infanger, Progress Energy, 352-563-4796 BWROG Rick Hill, GE, 408 925-5388 John Gaertner, 704 547-6169 S. Levinson, Framatome, 434 832-2768 Dusty Rhoads, Energy Northwest, 509 377-4298 Mike Kitlan, Duke, 980 373-8348 Don McCamy, TVA 256 729-4595 Page 1 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 1 Technical Specification

Required Actions developing implementation Preferred End States

  • BWOG Topical Report was submitted to NRC on TSTF-423 R0 (BWROG) guidance for TSTF-422 and 1/19/04. The NRC provided an RAI on 6/29/04.

TSTF-423. The BWOG will respond in 2/05. TSTF-431 R0 (BWOG)

RITSTF for review on 7/11/04.

(Not created) 2 Missed Surveillances

3 Increase Flexibility in

  • Initiative Complete. TSTF-359 R9 Mode Restraints LCO approved and published for 3.0.4 CLIIP adoption.
  • Revisions are needed to clarify the implementation guidance. The TSTF will provide
  • The final Implementation the proposed changes to NEI in the first quarter of Guidance, NEI-03-10, was 2005.

issued on September 5, 2003.

4a Individual Risk

  • Owners Groups (OGs) are

Informed Allowed pursuing generic Risk

  • TSTF-373R2 approved on 2/27/04.

Outage Times (AOTs) Informed AOT extensions

  • TSTF-430R0 approved on 8/5/04. TSTF-409 R1 (CEOG) through OG-specific Topicals and license TSTF-417 R0 (WOG) amendments.

TSTF-430 R0 (BWOG)

TSTF-439 R1 (ALL OG)

TSTF-446 R0 (WOG)

TSTF-454 R0 (BWROG)

Page 2 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 4b Risk Informed AOTs

  • Hope Creek, Fort Calhoun,
  • RITSTF will develop a White Paper to address the TSTF-424 R0 With Configuration South Texas Project, and interface of the a.4 process to the Initiative 4b and Risk Management Prairie Island have Initiative 6 process to show the overlap and Program or volunteered to develop pilot transition for ITS and non ITS plants and provide Maintenance Rule submittals. to NRC in 2/05.

Backstop

  • Fort Calhoun and South
  • NRC/RITSTF will meet 2/17-2/18, 2005 to Texas Project have discuss specifics of Initiative 4b submitted their pilots.
  • RITSTF will provide revised deliverables for the RMG, CEOG and STP based on the 12/15/04 meeting and 2/17-2/18, 2005 meeting results.
  • The RITSTF has created an Initiative 4b Subgroup to coordinate responses to the NRC RAIs.
  • The RITSTF provided responses to the NRC and met to discuss these responses on 12/15/04.
  • NRC visited STP week of 1/18/05 to evaluate applications of Initiative 4b.

5a Relocate Surveillance

  • Deterministic portion of
  • TSTF reviewing candidate SRs to be relocated. None assigned Requirements Not Initiative 5 transferred to Related to Safety TSTF responsibility.
  • TSTF will provide a TSTF to the NRC by 6/05.

Page 3 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 5b Relocate Surveillance

  • RITSTF/BWROG/Pilot
  • NRC attended several Limerick IDP meetings to TSTF-425 R0 Test Intervals to Plant will be applying the observe process.

Licensee Control methodology and interfacing with the NRC

  • The Limerick lead plant license amendment was on the issues in 2004. submitted on June 11, 2004.
  • TSTF-425 was submitted to the NRC on 8/31/04.
  • A final draft of the methodology document was provided to the NRC in 09/04.
  • NEI will provide the formal Methodology Document to NRC by 2/4/05.
  • NRC is currently reviewing the Limerick LAR, TSTF-425, and the methodology document and plans to issue RAIs in 3/05.

Page 4 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 6a Modify LCO 3.0.3

  • On hold.
  • On hold for resolution of Initiative 6b and 6c to None assigned Actions and Timing 1 determine if Initiative 6a is required.

hour - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6b Provide Conditions in

  • NRC issued Safety
  • CEOG submitted revised version of Topical TSTF-426 R0 the LCOs for Those Evaluation for Topical Report to address NRC RAIs in 10/03.

Levels of Degradation Report on 7/9/04.

Where No Condition

  • NRC issued Safety Evaluation for Topical Report Currently Exists to

Preclude Entry Into submitted to the NRC on LCO 3.0.3 8/30/2004.

  • TSTF-426 R0 was submitted to the NRC on 8/30/04.
  • The TSTF will develop draft Implementation Guidance and provide responses to the NRCs RAIs by 3/31/05.

6c Provide Specific Times

  • NRC issued Safety
  • CEOG submitted revised version of Topical TSTF-426 R0 in the LCO For Those Evaluation for Topical Report to address NRC RAIs in 10/03.

Conditions That Report on 7/9/04.

Require Entry Into

  • NRC issued Safety Evaluation for Topical Report LCO 3.0.3 Immediately

submitted to the NRC on 8/30/2004.

  • TSTF-426 R0 was submitted to the NRC on 8/30/04.
  • The TSTF will develop draft Implementation Guidance and provide responses to the NRCs RAIs by 3/31/05.

Page 5 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 7a Impact of Non

  • The NRC published the FRN Notice for Comment TSTF-372 R4 Technical Specification submitted on 4/23/04. on TSTF-372 on 11/24/04.

Design Features on TSTF-427 R0 Operability

  • The TSTF provided comments on the FRN Notice Requirements - Barriers 3/4/03. for Comment on 1/10/05.
  • NRC provided comments
  • The NRC is reviewing the TSTF comments and on TSTF-427 on 11/13/04. will work with the TSTF to revise the SE and issue the FRN Notice of Availability in 2/05.
  • NRC provided feedback on RITSTF responses on TSTF-427 in February 2004.
  • TSTF/RITSTF will delete the additions to the definition of OPERABILITY for TSTF-427 to address NRC concerns.
  • TSTF-427 implementation guidance was provided to the NRC on 09/21/04. NRC provided comments on the draft guidance on 10/13.
  • RITSTF will provide response to the NRCs RAIs by 3/31/05 and TSTF / RITSTF will provide a revision to TSTF-427 after completion of NRC review of the implementation guidance document and resolution of the NRCs questions.

7b Impact of Non TS

  • A White Paper on the
  • RITSTF will develop a White Paper to outline the None assigned Design Features on process to address this scope process to address this scope of SSCs by 3/05.

Operability of SSCs is being developed.

Requirements - All

  • RITSTF/TSTF reviewed and has commented on other SSCs not in the revised Operability guidance that will Technical supersede the guidance distributed with GL 91-18.

Specifications

  • RITSTF/TSTF will develop a TSTF and submit to NRC by 9/05.

Page 6 of 7 1/31/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 8a Remove or Relocate

  • A White Paper on the
  • NEI 00-04 is being reviewed and will serve as the None assigned Systems LCOs That Do application of the 10 CFR basis for Criterion 4 application.

Not Meet the 4 50.36 criteria is being Criterion of 10 CFR developed.

  • RITSTF will develop a White Paper to outline the 50.36 From Technical guidance and methodology based on NEI 00-04 Specifications for the application of the four criteria of 10 CFR 50.36 and a list of the systems identified for relocation. RITSTF working on the schedule -

current plans are second quarter 2005.

8b Modify 50.36 Rule to

  • Requires Rulemaking
  • RITSTF looking at coordinating Initiative 8b with Not applicable Permit Removal or longer term initiatives given the requirements for Relocation of Non Risk rulemaking.

Significant Systems out of Technical

  • Approach favored by NEI and NRC is making Specifications Criterion 4 a two way door (e.g., if it doesnt meet Criterion 4, Specification can be relocated even if it meets Criteria 1, 2, or 3).

BWOG - Active in Initiatives 1, 4 and 7 CEOG - Active in Initiatives 1, 4, 5 and 6 BWROG - Active in Initiatives 1, 4, 5 and 8 WOG - Active in Initiatives 1, 4, and 5 Page 7 of 7 1/31/2005