April 11, 2005 EA-04-190 Mr. Jeffrey T. Gasser Executive Vice President and Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2, JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REQUEST FOR EXTENSION OF TIME TO REPLY TO NOVEMBER 5, 2004, ORDER IMPOSING REQUIREMENTS FOR PROTECTING CERTAIN SAFEGUARDS INFORMATION
Dear Mr. Gasser:
By letter dated November 22, 2004, you requested an extension of time to respond to the above referenced Order. You requested the extension until 20 days after receiving clarifications from the U.S. Nuclear Regulatory Commission (NRC) regarding differences between the implementation of the SAFEGUARDS information - MODIFIED HANDLING (SGI-M) requirements provided in the November 5, 2004, Order, and the SAFEGUARDS Information program carried out by your facility for handling SAFEGUARDS information pertaining to special nuclear material under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 73.21. In your extension request, you indicated that the SGI-M designated information transmitted with the Order would be managed during the extension period under the provisions of the 10 CFR Part 73 SAFEGUARDS Information program currently being used at your facility.
Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 may use that program to control SGI-M, as designated by Commission Orders.
The NRC considers that 10 CFR Part 73 SAFEGUARDS Information programs are adequate for protection of SGI-M. As a general matter, an acceptable response to the November 5, 2004, Order, is that the designated SGI-M will be handled under the same provisions as the current 10 CFR Part 73 SAFEGUARDS Information program.
Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 will find it necessary to ensure that their program adequately addresses the following circumstances associated with SGI-M:
J. T. Gasser 1.
When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.
These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.
- 2.
SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.
This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.
Please contact the NRC licensing project manager if you have any questions regarding these clarifications.
Sincerely,
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-321, 50-366, 50-348, 50-364, 50-424,and 50-425 cc: See next page
J. T. Gasser 1.
When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.
These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.
- 2.
SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.
This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.
Please contact the NRC licensing project manager if you have any questions regarding these clarifications.
Sincerely,
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-321, 50-366, 50-348, 50-364, 50-424, and 50-425 cc: See next page DISTRIBUTION:
PUBLIC DNS R/F RZimmerman JDyer AGiantelli RFoster SYoung OGC ACRS PDII ADAMS Accession No. ML050310065 NRR-106 OFFICE SC:MTWS/DNS PD:NSPPD/DNS OGC D:DNS/NSIR D:NSIR D:NRR NAME MLayton:jph*
MLayton for JWShea JGoldberg DDorman for GTracy RZimmerman JDyer DATE 12/23/04 12/29/04 12/30/04 12/30/04 1/05/05 4/9/05 OFFICE DLPM/PM DLPM/LA DLPM/SC DLPM/PD DLPM/D NAME CGratton CHawes EHackett for JNakowski EHackett LMarsh DATE 3/17/05 3/17/05 3/17/05 3/17/05 4/8/05 OFFICIAL FILE COPY
Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:
Laurence Bergen Oglethorpe Power Corporation 2100 E. Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Mr. R.D. Baker Manager - Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Resident Inspector Plant Hatch 11030 Hatch Parkway N.
Baxley, GA 31531 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. G. R. Frederick, General Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
U.S. Highway 1 North P.O. Box 2010 Baxley, GA 31515 Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant P.O. Box 2010 Baxley, GA 31515
Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:
Mr. J. R. Johnson General Manager Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312 Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe St.
Montgomery, AL 36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312
Vogtle Electric Generating Plant, Units 1 & 2 cc:
Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Skip Kitchens, General Manager Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
P.O. Box 1600 Waynesboro, GA 30830 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830