v am Duke
- SPowere A Duke Energy Company GARY R. PETERSON Vice President McGuire Nuclear Station Duke Power MGOI VP / 12700 Hagers Ferry Road Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters@duke-energy.com January 17, 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555-0001
Subject:
Reference:
McGuire Nuclear Station, Unit 2 Docket No. 50-370 Relief Request (RR)02-003 Request for Additional Information (1) Letter from Mr. G.R. Peterson of Duke Energy Corporation (Duke) to the NRC, dated March 8, 2004 (Relief Request 02-003), and (2) Letter from Mr. J.J. Shea of the NRC to Duke, dated December 20, 2004.
This letter provides additional information that was requested by the NRC staff in reference 2 above.
The NRC staff's request for information and Duke's response are stated in the following attachment.
Please direct any questions pertaining to this request to Norman T. Simms of Regulatory Compliance at (704) 875-4685.
Sincerely, G. R. Peterson Attachment 6YQLV71 www.duke-energy.com
U.S. Nuclear Regulatory Commission January 17, 2005 Page 2 xc w/attachment:
Mr. W.D. Travers U.S Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T 85 Atlanta, Georgia 30303 Mr. J.J. Shea, McGuire Project Manager (addressee only)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0-8G1 11555 Rockville Pike Rockville, MD 20852-2738 J.B. Brady Senior NRC Resident Inspector McGuire Nuclear Station
ATTACHMENT Relief Request No.02-003 RAI
Response to Nuclear Regulatory Commission's Request for Additional Information, Letter dated December 20, 2004 Question "The March 8, 2004, Duke Energy Corporation, Inservice Inspection relief request submittal does not provide the definitive hold times before performing the VT-2 visual examinations for the proposed alternative system leakage test for the McGuire, Unit 2, Class 3, Category D-B, pressure-retaining components subject to IWD-5222 hydrostatic testing.
Please provide clarification that states the hold times required for your proposed system leakage tests for the McGuire, Unit 2, Class 3, Category D-B pressure-retaining components."
Response
10 CFR 50.55a(b)(2)(xx) requires a 10-minute holding time after attaining test pressure for Class 2 and Class 3 components that do not normally operate during operation, and no holding time is required for the remaining Class 2 and Class 3 components provided that system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for uninsulated components.
Duke Energy Corporation did not request relief from the hold time requirements; therefore, the hold time requirements stated in 10 CFR 50.55a(b)(2)(xx) shall be met for the proposed system leakage tests for the McGuire, Unit 2, Class 3, Category D-B pressure-retaining components.