Correction to Administrative Change to Facility Operation License and Associated Safety Evaluation in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat (Dbt); and Revisions to Physical .
ML050140061
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/14/2004
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Ted Sullivan
Entergy Nuclear Operations
Nakoski J A, NRR/DLPM, 415-1068
References
TAC MC2921
Download: ML050140061 (8)


Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION December 14, 2004 Mr. T. A. Sullivan Site Vice President James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc.

P. O. Box 110 Lycoming, NY 13093

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - CORRECTION TO ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE AND ASSOCIATED SAFETY EVALUATION IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT (DBT); AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2921)

Dear Mr. Sullivan:

By letter dated October 29, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative license change to the James A. FitzPatrick Nuclear Power Plant (FitzPatrick)

Facility Operating License (FOL No. DPR-59) to incorporate the reference to the recently revised physical security plan, training and qualification plan, and safeguards contingency plan.

The license page provided in the October 29, 2004, letter contained errors in that the page did not include changes from License Amendment No. 274 dated July 3, 2002. In addition, as discussed with your staff, minor inconsistencies were identified between the FitzPatrick security plan dated October 26, 2004, and the NRC staffs safety evaluation (SE) dated October 29, 2004. The inconsistencies identified were either editorial in nature or clarified the SE with regard to statements made in the revised security plans. The changes made to the SE did not affect the NRC staffs evaluation of the revised security plans.

Therefore, the NRC is issuing a corrected page 4 and a revised page 4a, which was omitted from the October 29, 2004, letter, to FOL No. DPR-59. Also, corrected pages to the SE are provided in Enclosure 2 (Safeguards Information).

NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

T. Sullivan Please replace the enclosed pages to your FOL and SE as indicated in the enclosures. We regret any inconvenience this may have caused. If there are any further questions, please call Mr. Pat Milano, at (301) 415-1457.

Sincerely,

/RA/

John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Changes to FOL No. DPR-59
2. Correction to SE (Safeguards Information) cc w/encl 1 only: See next page cc w/encls 1 and 2: Mr. Jonathan LaPlante

T. Sullivan Please replace the enclosed pages to your FOL and SE as indicated in the enclosures. We regret any inconvenience this may have caused. If there are any further questions, please call Mr. Pat Milano, at (301) 415-1457.

Sincerely,

/RA/

John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Changes to FOL No. DPR-59
2. Correction to SE (Safeguards Information) cc w/encl 1 only: See next page cc w/encls 1 and 2: Mr. Jonathan LaPlante DISTRIBUTION (w/o Enclosure 2):

PUBLIC SPRT R/F OGC ACRS SLittle PMilano RLaufer CHolden DLPM DPR TBoyce GHill (2)

GMatakas, RI Accession No.: ML050140061 OFFICE SPRT/PM PDI-1/PM DLPM/LA NSIR/RSS PDII-1/SC NAME RFretz PMilano SLittle JPeralta JNakoski DATE 11/29/04 12/13/04 12/10/04 12/13/04 12/10/04 OFFICIAL RECORD COPY

James A. Fitzpatrick Nuclear Power Plant cc w/o encl 2:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Kevin J. Mulligan General Manager, Plant Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P. O. Box 110 Lycoming, NY 13093 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. William Maquire Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P. O. Box 110 Lycoming, NY 13093 Mr. Andrew Halliday Manager, Regulatory Compliance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P. O. Box 110 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271

James A. Fitzpatrick Nuclear Power Plant cc w/o encl 2:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Ken L. Graesser BWR SRC Consultant 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Jim Sniezek Nuclear Management Consultant 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Ron Toole BWR SRC Consultant 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop L-ENT-15E New Orleans, LA 70113 Mr. Michael Kansler, President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10611

CHANGES TO FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 Replace the following pages of Facility Operating License DPR-59 with the attached revised pages as indicated. The revised pages are identified by revision date and contain marginal lines indicating the areas of change.

Remove Page Insert Page 4

4 4a 4a (4)

Systems Intergrity Deleted by Amendment No. 274 (5)

Iodine Monitoring Deleted by Amendment No. 274 (6)

New or Revised ITS Surveillance Requirements Applicability:

The schedule for performing Surveillance Requirements (SRs) that are new or revised in Amendment No. 274 shall be as follows:

(a)

For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.

(b)

For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.

(c)

For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.

(d)

For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is die at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.

D.

Physical Protection ENO shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "James A.

FitzPatrick Nuclear Power Plant Physical Security, Training & Qualification and Safeguards Contingency Plan, Revision 0," submitted by letter dated October 26, 2004.

1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 274 Revised by letter dated October 29, 2004 Revised by letter dated December, 2004

- 4a -

E.

Power Uprate License Amendment Implementation The licensee shall complete the following actions as a condition of the approval of the power uprate license amendment.

Amendment No. 274 Revised by letter dated December, 2004