G20040833/LTR-04-0740 - Sen. Joseph R. Biden, Sen. Thomas R Carper, Rep. Michael N. Castle Ltr. Safe Operations of the Hope Creek Nuclear Power PlantML050040363 |
Person / Time |
---|
Site: |
Hope Creek |
---|
Issue date: |
12/09/2004 |
---|
From: |
Biden J, Carper T, Castle M US HR (House of Representatives), US SEN (Senate) |
---|
To: |
Diaz N NRC/Chairman, NRC/OCM, Office of Public Affairs |
---|
Collins D, NRR/DLPM, 415-1427 |
Shared Package |
---|
ML043580222 |
List: |
---|
References |
---|
+sispmjr200501, CORR-05-0002, FOIA/PA-2007-0093, FOIA/PA-2009-0107, G20040833, LTR-04-0740 |
Download: ML050040363 (5) |
|
|
---|
Category:Congressional Correspondence
MONTHYEARML0522401622005-09-13013 September 2005 G20050520/LTR-05-0376 - Rep. Robert Andrews Ltr Shutdown of the Hope Creek Nuclear Reactor ML0520600842005-07-22022 July 2005 G20050520/LTR-05-0376 - Rep. Robert Andrews Ltr Shutdown of the Hope Creek Nuclear Reactor ML0504703222005-01-12012 January 2005 G20050022/LTR-05-0018 - Senator Joseph R. Biden, Senator Thomas R. Carper, Rep. Michael N. Castle, Ltr. Hope Creek Generating Station ML0435705162005-01-0707 January 2005 G20040833/LTR-04-0740 - Senator Joseph Biden, Jr., Senator Thomas Carper and Representative Michael Castle Ltr Hope Creek Nuclear Power Plant ML0500403632004-12-0909 December 2004 G20040833/LTR-04-0740 - Sen. Joseph R. Biden, Sen. Thomas R Carper, Rep. Michael N. Castle Ltr. Safe Operations of the Hope Creek Nuclear Power Plant ML0430603502004-10-25025 October 2004 G20040733/LTR-04-0677 - Sen. Joseph R. Biden, Sen. Thomas R. Carper, and Rep. Michael N. Castle Ltr Salem-Hope Creek Nuclear Generating Station ML0325907172003-09-0404 September 2003 G20030547/LTR-03-0588 - Rep. Robert E. Andrews Ltr Opposition of the Proposed Storage Methods of Spent Fuel at Hope Creek (Norm Cohen) ML0321800922003-08-20020 August 2003 G20030411/LTR-03-0455 - Rep. Frank A. Lobiondo Ltr. Request for Public Mtg in Salem - Possible Plans to Construct Dry Cask Storage ML0301604452003-01-0909 January 2003 G20030007/LTR-03-0012 - Rep. Edward J. Markey Ltr. Deliveries of Hazardous Materials, Including Fresh Nuclear Fuel Rods to Hope Creek Nuclear Power Plant 2005-09-13
[Table view] Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] |
Text
EOPrincipal.Correspon'denceCotl FRM0DE 012/5EDO CONTROL:: G20040833 DOC DT: -12/09/.04 FINAL REPLY:
Senator.Joseph R. Biden,Jr Senator Thomas"R. Carper Representative Michael N.- Castle TO:
Chairman':Diaz NO: 04-0740-FOR SIGNATURE:OF : *PRI **CRC
-Chairman Di'az DESC: ROUTING:
- Hopei Creek Nuclear, Poe Plnt 'Reyes.
-Kane Mer choff-Norr:y,.
Dean-DATE 1~/b/P4Btirn's/Cyr DAT: 2/1/0 -Collins, -'"'
ASSIGNED TO: CONTACT: .Rathbun;' OCA'.
NRR De SPECIAL-INSTRUCTIONS OR-REMARKS' 01fb 1 c-97
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Prnted:Dec 09, 2004 16:47 PAPER NUMIBER: LTR-04-0740 LOGGING DATE: 12/08t2004 ACTION OFFICE: EDO AUTHOR: Joseph Biden AFFILIATION: SEN ADDRESSEE: &t 'cO an cm
SUBJECT:
Safe Operations of the Hope Creek nuclear power plant ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 12/09/2004 ACKNOWLEDGED No SPECIAL HANDLING:
NOTES: Commission Correspondence FILE LOCATION: ADAMS DATE DUE:: 01/03/2005 DATE SIGNED:
( //y t, 2 205/0 December 9, 2004 The Honorable Nils J. Diaz Chairman U.S. Nuclear Regulatory Commission Office of Public Affairs Washington, DC 20555
Dear Chairman Diaz,
Thank you for arranging the briefing that took place recently between our staffs and Nuclear Regulatory Commission personnel. We appreciate your responsiveness in keeping us informed of your ongoing Investigation into operations at the Hope Creek nuclear power plant. During that meeting, as well as subsequent discussions with both the NRC and PSEG, the operator of Hope Creek, issues were raised that continue to be of concern to us and we believe need to be addressed before operations resume at Hope Creek.
Commission staff has informed us that a primary focus of its special investigation into the October 10, 2004 steam pipe rupture Is the condition of a valve associated with the failed pipe. NRC's preliminary findings indicate that the reactor operators at Hope Creek were aware that the valve was malfunctioning several days prior to the pipe failure. The operators requested an opinion from company engineers on whether or not the malfunctioning valve could unduly stress the associated pipe. The engineering team did not foresee the conditions which ultimately led to the pipe failure, and thus did not advise the operators to take preventative action. We feel this raises very serious concerns regarding analytical procedures being used to guide the operators when abnormal conditions arise. It also raises questions about the NRC's oversight role as it relates to ensuring that corrective actions are completed at the plant.
The NRC has also confirmed that it is investigating the status of the Hope Creek
'Bo recirculation pump, which has exhibited a higher than average degree of vibration.
PSEG has announced its Intention to replace this pump at the next refueling outage, which is likely to occur 18 months after this current outage. NRC informed our staffs that the operation of this pump is not considered part of the safety system at Hope Creek. Specifically, the safety system would not be compromised if the pump was shut down and no longer moved cooling water through the pipes. However, we understand that if the pump's housing were to fail and allow cooling water to be released, that would be considered a safety system failure. The difference between what is and is not a safety system is difficult to understand. The safety consequences of a pump failure need to be clearly and concisely explained to afford not only us, but the public the opportunity to understand the ramifications of delaying the replacement of the
recirculation pump.
Page 2 In addition, we understand that the NRC will conduct a public exit meeting with PSEG at the conclusion of the special Investigation and prior to the restart of the Hope Creek reactor. At this meeting, both PSEG and the NRC will present findings of their investigations into the steam leak and the "SR recirculation pump. PSEG will also report on initiatives it has undertaken to resolve outstanding issues related to these investigations. After the NRC and PSEG discussions conclude, the public will be invited to ask questions and make comments. Much of the information released at the exit meeting will be presented or available for the first time. Given the likely importance and complexity of this Information, we believe it is important for interested parties, Including the public, to have sufficient time to review the information before the restart of the Hope Creek plant, to review the findings of the investigation, and to raise additional questions and concerns should they arise. We urge you to make such a review possible.
Finally, it is our understanding that PSEG has not been asked by the NRC to cease operations of the Salem or Hope Creek reactors, and does not require formal permission from the NRC to resume operation of a reactor after a refueling outage like the one currently occurring at Hope Creek. However, It is also our understanding that the NRC retains the authority to order a reactor's operator to cease reactor operations if the NRC determines that the reactor is not meeting certain standards and expectations.
We fully expect that the NRC will continue to closely monitor the repairs, refueling, and restart activities at Hope Creek and insure the safety of the plant, its workers and its neighbors.
The safe operations of our nuclear power plants is and should be of utmost importance to all of us. We appreciate the importance you have placed on the investigations at Hope Creek and look forward to continuing our discussions as new Information becomes available.
Sincerely, Joseph R. Biden, Jr. Thomas R. Carper Michael N. Castle United States Senator United States Senator Member of Congress
-- --- . - . -, , - -- - ..... .- . .. . -- I---.-- I -. J!t -L.
Mail Envelope Properties (41BSACSI.E48: 10: 20040)
Subject:
The letter I left a message about is attached Creation Date: 12/9104 2:50PM From: "Baker, Tonya (Biden)" <Tonva Baker@biden.senate.aov>
Created By: Tonva B aker@biden.senate.gov Recipients nrc.gov twf5_po.TWFN_DO TJM (Thomas Madden)
Post Office Route tivf5po.TWFN_DO nrc.gov Files Size Date & Time December2 to NRC v5.wpd 17292 Mime.822 25530 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard