Letter Sequence Other |
---|
|
|
MONTHYEARML0435705162005-01-0707 January 2005 G20040833/LTR-04-0740 - Senator Joseph Biden, Jr., Senator Thomas Carper and Representative Michael Castle Ltr Hope Creek Nuclear Power Plant Project stage: Other 2005-01-07
[Table View] |
G20040833/LTR-04-0740 - Senator Joseph Biden, Jr., Senator Thomas Carper and Representative Michael Castle Ltr Hope Creek Nuclear Power PlantML043570516 |
Person / Time |
---|
Site: |
Hope Creek ![PSEG icon.png](/w/images/c/cc/PSEG_icon.png) |
---|
Issue date: |
01/07/2005 |
---|
From: |
Diaz N NRC/Chairman |
---|
To: |
Biden J, Carper T, Castle M US HR (House of Representatives), US SEN (Senate) |
---|
Collins D, NRR/DLPM, 415-1427 |
Shared Package |
---|
ML043580222 |
List: |
---|
References |
---|
+sispmjr200501, CORR-05-0002, FOIA/PA-2007-0093, G20040833, LTR-04-0740, TAC MC5369 |
Download: ML043570516 (3) |
|
|
---|
Category:Congressional Correspondence
MONTHYEARML0522401622005-09-13013 September 2005 G20050520/LTR-05-0376 - Rep. Robert Andrews Ltr Shutdown of the Hope Creek Nuclear Reactor ML0520600842005-07-22022 July 2005 G20050520/LTR-05-0376 - Rep. Robert Andrews Ltr Shutdown of the Hope Creek Nuclear Reactor ML0504703222005-01-12012 January 2005 G20050022/LTR-05-0018 - Senator Joseph R. Biden, Senator Thomas R. Carper, Rep. Michael N. Castle, Ltr. Hope Creek Generating Station ML0435705162005-01-0707 January 2005 G20040833/LTR-04-0740 - Senator Joseph Biden, Jr., Senator Thomas Carper and Representative Michael Castle Ltr Hope Creek Nuclear Power Plant ML0500403632004-12-0909 December 2004 G20040833/LTR-04-0740 - Sen. Joseph R. Biden, Sen. Thomas R Carper, Rep. Michael N. Castle Ltr. Safe Operations of the Hope Creek Nuclear Power Plant ML0430603502004-10-25025 October 2004 G20040733/LTR-04-0677 - Sen. Joseph R. Biden, Sen. Thomas R. Carper, and Rep. Michael N. Castle Ltr Salem-Hope Creek Nuclear Generating Station ML0325907172003-09-0404 September 2003 G20030547/LTR-03-0588 - Rep. Robert E. Andrews Ltr Opposition of the Proposed Storage Methods of Spent Fuel at Hope Creek (Norm Cohen) ML0321800922003-08-20020 August 2003 G20030411/LTR-03-0455 - Rep. Frank A. Lobiondo Ltr. Request for Public Mtg in Salem - Possible Plans to Construct Dry Cask Storage ML0301604452003-01-0909 January 2003 G20030007/LTR-03-0012 - Rep. Edward J. Markey Ltr. Deliveries of Hazardous Materials, Including Fresh Nuclear Fuel Rods to Hope Creek Nuclear Power Plant 2005-09-13
[Table view] Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
January 7, 2005 The Honorable Joseph R. Biden, Jr.
United States Senate Washington, D.C. 20510
Dear Senator Biden:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter of December 9, 2004, regarding activities related to an October 10, 2004 steam pipe break at the Hope Creek Generating Station (Hope Creek). You also raised questions regarding the B reactor recirculation pump, specifically with respect to potential consequences if the pump were to fail.
An NRC special inspection team has reviewed the circumstances surrounding the October 10, 2004 steam pipe break. The five-member team of inspectors performed on-site reviews of Public Service Enterprise Group, Nuclear LLC (PSEG) actions to determine the root cause, review the extent of the problems, and identify corrective actions. The special inspection included a review of engineering guidance to operators to address a malfunctioning steam valve that may have caused or contributed to the steam pipe break. As discussed with your staff on December 21, 2004, the special inspection team has completed its activities and plans to publish the preliminary results in advance of a public exit meeting scheduled for January 12, 2005.
The NRC staff continues to review not only PSEGs corrective actions for the pipe failure, but also corrective actions on other ongoing technical issues, including PSEGs efforts to address the issues associated with the B reactor recirculation pump. On December 17, 2004, members of the NRC Region I and Headquarters technical staffs met with PSEG technical staff in a public meeting to gather information and to ask questions about the recirculation pump and other related technical issues. The staff expects to issue a summary of the review prior to the public meeting scheduled for January 12, 2005. The outcome of the NRC review of the recirculation pump issues will also be discussed at that meeting. The NRC will also continue monitoring plant operations thereafter.
Regarding the relationship between safety-related and non-safety-related aspects of the B reactor recirculation pump, the description provided in your letter was accurate. Certain components may perform non-safety-related functions as well as safety-related functions. In the case of a reactor recirculation pump, the non-safety-related function of the pump is to circulate water through the reactor core for the production of electricity. The safety-related function of the pump seals and pump casing is to prevent a loss of reactor coolant, which could impact cooling of the reactor core. If the reactor recirculation pump stopped running, it would likely lead to plant shutdown. If the pump seals or pump casing were to fail, reactor coolant leakage would be detected by the plants systems, and actions could be taken to put the plant in a safe condition. Depending on the size of the leak, this might involve shutting down and
2 injecting water as needed to counter leakage while also taking action to stop the leak. Failure of a recirculation pump to run and the loss of reactor coolant are both events that are within the plants design basis, and operators have received extensive training on how to cope with these types of events. The NRC is focused on the licensees ability to identify any degradation of pump conditions and to respond prior to failure.
The NRC is committed to ensuring the protection of public health and safety through oversight of the facilities that we regulate. NRC actions have been focused on ensuring safe operations at Hope Creek. The plant will not be permitted to operate unless the NRC believes it is safe. The preliminary inspection and review of the other technical issues indicate that the licensee can safely operate the plant without replacing the recirculation pump shaft. A publicly available letter will formalize the commitments made by PSEG to the NRC regarding implementation of a monitoring program for the B recirculation pump, actions to be taken in the event of abnormal indications, and future repairs of the pump. Additionally, I want to assure you that the NRC will continue to oversee PSEGs actions to address technical issues at Hope Creek and will maintain openness for public involvement in the regulatory process. The NRC plans to discuss the results of its reviews of the October 10, 2004 steam pipe break, the B reactor recirculation pump issues, and other technical issues at a public meeting on January 12, 2005. This meeting, along with issuing the preliminary results of the special inspection and summaries of NRC technical issue reviews, will provide an opportunity for the public to review the results of our assessments before the plant starts up from the refueling outage. If you have further questions, please feel free to contact me.
Sincerely,
/RA/
Nils J. Diaz
Identical letter sent to:
The Honorable Joseph R. Biden, Jr.
United States Senate Washington, D.C. 20510 The Honorable Thomas R. Carper United States Senate Washington, D.C. 20510 The Honorable Michael N. Castle United States House of Representatives Washington, D.C. 20515