ML050030039

From kanterella
Jump to navigation Jump to search

Correction to License Page Associated with the Issuance of Amendment No. 39 Dated August 2, 1979
ML050030039
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/30/2004
From: Spaulding D
NRC/NRR/DLPM/LPD3
To: Koehl D
Nuclear Management Co
Spaulding, D W, NRR/DLPM, 415-2928
References
TAC MC1109
Download: ML050030039 (1)


Text

WISCONSIN ELECTRIC POWER COMPANY NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-266 FACILITY OPERATING LICENSE License No. DPR-24 Amendment No. 215 The Atomic Energy Commission (the Commission) now the Nuclear Regulatory Commission having found that:

a. The application for facility license filed by Wisconsin Electric Power Company and Wisconsin Michigan Power Company,* dated March 12, 1969, as amended by Supplements Nos. 1 through 10, thereto, dated September 2, 1969, January 19, 1970, February 11, 1970, March 13, 1970, April 2, 1970, April 7, 1970, April 21, 1970, June 5, 1970, June 17, 1970, and July 27, 1970, respectively, complies with the requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter 1; and
b. Construction of the Point Beach Nuclear Plant Unit No. 1 (the facility) has been substantially completed, in conformity with Provisional Construction Permit No. CPPR-32, as amended, the application as amended, the provisions of the Act, and the rules and regulations of the Commission; and
c. The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; and
d. There is reasonable assurance (i) that the activities authorized by the operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the regulations of the Commission set forth in 10 CFR Chapter 1; and
e. NMC is technically qualified and Wisconsin Electric Power Company is financially qualified to engage in the activities authorized by this operating license, in accordance with the regulations of the Commission set forth in 10 CFR Chapter 1; and
f. The applicable provisions of 10 CFR Part 140 have been satisfied; and
9. The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public.
  • On December 31, 1977, Wisconsin Electric Power Company and Wisconsin Michigan Power Company (formerly the licensees) merged with Wisconsin Electric Power Company surviving the merger. This license, as amended, was amended, as of the effective date of the merger with Wisconsin Electric Power Company remaining as the licensee. Nuclear Management Company, LLC, hereinafter referred to as NMC, succeeds Wisconsin Electric Power Company as operator of the Point Beach Nuclear Plant, Unit 1. Consequently, NMC is authorized to act as agent for Wisconsin Electric Power Company and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.