Submittal of Cycle 12 Startup Report, Supplement 3
ML043560183
Person / Time
Site: Palo Verde 
Issue date: 12/09/2004
From: Bauer S
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-05188-SAB/TNW/JAP
Download: ML043560183 (2)


Text

L A P Scott A. Bauer TRM T5.0.600.2.c Department Leader Regulatory Affairs Tel: 623/393-5978 Mail Station 7636 Palo Verde Nuclear Fax: 6231393-5442 P.O. Box 52034 Generating Station e-mail: sbauer~apsc.com Phoenix, AZ 85072-2034 102-05188-SAB/TNW/JAP December 9, 2004 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission

-Washington, DC 20555-0001--

Reference:

1) Letter 102-05071-SABITNW/JAP, "Unit 2, Cycle 12 Startup Report-"

from Scott A. Bauer, APS to USNRC, dated March 11, 2004

2) Letter 102-05111 -SAB/TNW/JAP, Unit 2, Cycle 12 Startup Report -

Supplement 1," from Scott A. Bauer, APS to USNRC, dated June 11, 2004

3) Letter 102-05161-SAB/TNW/JAP, Unit 2, Cycle 12 Startup Report -

Supplement 2," from Scott'A. Bauer, APS to USNRC, dated October 15, 2004

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 Unit 2, Cycle 12 Startup Report - Supplement 3

Dear Sirs:

As required by the PVNGS Technical Requirements Manual (TRM), Arizona Public Service Company (APS) is submitting this supplemental report to the PVNGS Unit 2, Cycle 12 Startup Report (Reference 1). TRM T5.0.600.2.c requires that supplemental reports be submitted at least every 3 months until all testing has been completed. At the time that Unit 2, Cycle 12 Startup Report (Reference 1) was initially submitted, two tests had not yet been performed. Those two tests were 1) steam generator moisture carryover and, 2) steam generator blowdown piping vibration measurement. As reported in Reference 2, the remaining portions of the Steady State Vibration Testing for Unit 2 were completed on May 20, 2004. The Steam Generator Moisture Carryover Test remains to be completed. A subsequent report will be provided when this testing is completed.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Unit 2, Cycle 12 Startup Report -

Supplement 3 Page 2 No commitments are being made to the NRC by this letter.

If you have any questions, please contact Thomas N. Weber at (623) 393-5764.

Sincerely, SAB/TNW/JAP/kg cc:

B. S. Mallet M. B. Fields N. L. Salgado NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS I