Summary of the 12/06/04, Public Meeting to Discuss Licensee Performance and Planned Activities as Part of the Manual Chapter 0350 Process at the Davis-Besse Nuclear Power Station
ML043550129
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/17/2004
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
NRC/RGN-III
References
Download: ML043550129 (5)


Text

December 17, 2004 LICENSEE: FirstEnergy Nuclear Operating Company FACILITIES: Davis-Besse Nuclear Plant, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 6, 2004, PUBLIC MEETING TO DISCUSS LICENSEE PERFORMANCE AND PLANNED ACTIVITIES AS PART OF THE MANUAL CHAPTER 0350 PROCESS AT THE DAVIS-BESSE NUCLEAR POWER STATION On December 6, 2004, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building in Oak Harbor, Ohio. The meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss licensee performance and planned activities as part of the Manual Chapter 0350 process at the Davis-Besse Nuclear Power Station. The meeting request letter, meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML043290176, ML043290077, ML043420431, and ML043420442, respectively. The transcript of the meeting will be made publicly available in ADAMS and on the NRCs Davis-Besse web page when it is available. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an assessment of recent performance at the Davis-Besse Nuclear Power Plant. The NRC discussed recent activities at Davis-Besse, which included a Triennial Fire Protection Inspection, a Generic Letter 89-13 Service Water System Inspection, a Supplemental Inspection in support of the discrepant Alert and Notification System performance Indicator, a Problem Identification and Resolution Inspection, and ongoing Baseline Inspections. At the conclusion of the NRC remarks, FENOC presented an overview of significant items being worked on at Davis-Besse. FENOC discussed the progress of the Independent Assessment teams, the status of backlog reduction, a reiteration of management support for a healthy Safety Culture, and Mid-Cycle outage preparations. The FENOC presentation concluded with a statement that safety is their priority, and that plant performance is improving at Davis-Besse.

FirstEnergy Nuclear Operating Company These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution DOCUMENT NAME: G:\Davis-Besse 0350\External Meetings\Public Meeting Summary\Published Summaries\ML043550129.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME GRoach/trn CLipa DATE 12/16/04 12/17/04 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: The Honorable Dennis Kucinich Mark Bezilla, Vice President-Nuclear G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners of Lucas County C. Koebel, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Jacqueline Bird INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

GYS DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure Meeting Participants NRC J. Grobe, Davis-Besse Oversight Panel Manager, RIII S. Reynolds, Acting Division Director, DRP, RIII G. Suh, Section Chief, DLPM, NRR C. Lipa, Branch Chief, DRP, RIII S. Thomas, Senior Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company M. Bezilla, Vice President, Davis-Besse B. Allen, Director, Site Operations, Davis-Besse R. Schrauder, Director, Site Performance Improvement, Davis-Besse R. Hruby, Manager, Nuclear Oversight, Davis-Besse