L-AF A subsidihar of Pinnade s.rt Capital Carporation Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.
623-393-6116 Fax.
623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 December 14, 2004 035-00730-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for NOVEMBER 2004 Enclosed are the Monthly Operating Reports for NOVEMBER 2004, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
Sincerely, DMS/ap
Enclosures:
NOVEMBER 2004 Monthly Operating cc:
(all w/enclosures)
Dr. Bruce S. Mallelt - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-528 Palo Verde 1 December 10, 2004 Don Vogt 623-393-5926 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 720.00 6,982.30 720.00 6,926.67 0.00 0.00 872,605.18 8,339,455.29 Cumulative 129,764.22 128,315.70 0.00 154,595,145.63 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason1 Down 2 Comments
SUMMARY
- Began month in Mode 1: RX power at full power."Ended month in Mode 1: RX power at full power.
I Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-529 Palo Verde 2 December 10, 2004 Don Vogt 623-393-5926 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,354.00 1,335.00
- 3. Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line S.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 720.00 7,436.41 128,225.67 720.00 7,396.28 126,785.80 0.00 0.00 0.00 941,308.52 9,684,772.24 155,072,865.11 UNIT SHUTDOWNS Type Method of F: Forced Duration' Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)-
Reason I _ Down 2 Comments
SUMMARY
- The Design Electrical Rating (DER) and the Maxinfum Dependable Capacity (MDC) reflect the power uprate performed in 2003. These are interim values. Official values approved by station owners will be effective on 12/01104. Began month in Mode 1: RX power at full power. Ended month in Mode 1: RX power at full power.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
'Continuation 5
Other (Explain)
I_.
1
.,Page 1 of I
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD OPERATING DATA REPORT 50-530 Palo Verde 3 December 10, 2004 Don Vogt 623-393-5926 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 0.00 0.00 0.00 0.00 Yr-to-Date Cumulative 6,216.05 124,179.35 6,133.85 123,045.22 0.00 0.00 7,577,059.64 150,638,927.66 UNIT SHUTDOWNS Type Method of F: Forced Duration R
Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Dowri 2 Comments 04-04 10/02/2004 S
720.00 C
4 Manually tripped the RX for U3R1 1
SUMMARY
- Began month with RXdefueled. Entered Mode 6 on 11/12/04 at 0918. Entered Mode Son 11119104 at 0210. Entered Mode 4 on 11/23/04 at 0516 and entered Mode 3 at 1655. Discovered an anomaly with the safety injection check valves gaskets on 11/24104 and decided to cool the plant to Mode 5 for rework. Entered Mode 4 on 11/24/04 at 1646 and entered Mode 5 at 2130. Ended month in Mode 5.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
U Page 1 of I