ML043430441

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report (Colr), Cycle 22, Rev. 21
ML043430441
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/30/2004
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-70, Rev 21
Download: ML043430441 (35)


Text

_ Duke E Power.

A Duke Energy Company RON A. JONES Vice President Oconee Nuclear Site Duke Power ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax November 30, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Site Docket No. 50-287 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 22, Rev. 21.

Ve uly yours, Ro s Site, Vice President Oconee Nuclear Site Attachment

-Oc) 

www. dukepower. corn

NRC Document Control Desk November 30, 2004 Page 2 xc wlatt:

Mr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr. Mel Shannon Senior Resident Inspector Oconee Nuclear Site

ONEI-0400-70 Rev 21 Page 1 of 33 Duke Power Company

-Oconee 3 Cycle 22 Core Operating Limits Report QA Condition I FOR INFORMATION ONLY Prepared By: A. T. Godfrey All A/ /a Date: (5 'DO 2.OOI/

Checked By: L. D. Mc Clain /

Date: )bN6ig/

2oV-CDR By: G. J. Byers V

Date:

\\\\

Approved By: R. R. St.Clair Date:,

Date :

/

Document No. / Rev. ONEI-0400-70 Rev. 21 Date November 10. 2004 Page No.

Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By:

Hi (Spons&)'.

Date:

11,/Y40" CATAWBA Inspection Waived MCE (Mechanical & Civil)

E Inspected By/Date:

RES (Electrical Only)

[

Inspected By/Date:

RES (Reactor)

E Inspected By/Date:

MOD D

Inspected By/Date:

Other (

)

l Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) 0 Inspected By/Date:

RES (Electrical Only) 0 Inspected By/Date:

RES (Reactor) 0 Inspected By/Date:

MOD Inspected By/Date:

Other ( _)

Q Inspected By/Date:

-MCGUIRE Inspection Waived MCE (Mechanical & Civil)

D Inspected By/Date:

RES (Electrical Only)

[

Inspected By/Date:

RES (Reactor) a Inspected By/Date:

MOD El Inspected By/Date:

Other (

I)

[

nspected By/Date:

ONEI-0400-70 Rev 21 Page 3 of 33 Oconee 3 Cycle 22 Core Operating Limits Report Insertion Sheet for Revision 21 This revision Is not valid until the end of operation for Oconee 3 Cycle 21.

Remove these Revision 20 pages Insert these Revision 21 pages 1-33 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages 1Oconee 3 Cycle 22 revisions below 1

21 Nov 2004 1

33 lOconee 3 Cycle 21 revisions below 20 Sep 2004 1 6 33 19 Feb2004 1-4,6 33 18 Nov.2003 1 -3, 5 33 17 Apr. 2003 1 - 31 32 - 33 33 CXn3Gycle O revlslqrns below --.

4 -ct.2002

-1.3,5 31 N15

.Nov.2001 1-3 31 14 Nov. 2001 1

31

ONEI-0400-70 Rev 21 Page 4 of 33 Oconee 3 Cycle 22 1.0 Error Adjusted Core Operating Lmits The Core Operating Umits Report for 03C22 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references I through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 03C22 by references is through 17. The 03C22 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB) Tavg reduction of up to 10"F provided 4 RCPs are in operation and Tavg does not decrease below 569*F.

The error adjusted core operating limits Included In section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C22 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004P-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002A, Revision 1.

SER dated October 1, 1985.

3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8,2000.
4. ONS Core Thermnal Hydraulic Methodology Using VIPRE-01, DPG-NE-2003P-A, Revision 1, SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005P-A, Revision 2, SER dated June 8, 1999.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008P-A, Revision 0. SER dated April 3,1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24,2003.
8. DPC-NE'-OOOP-A, Thermal Hydraulic Transient Analysis Methodology, Rev. 3, SER dated September 24,2003.
9. BAW-10192-PA, BWNT LOCA-BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, SER dated February 18,1997.
10. BAW-10164P-A, Rev. 4, "REiAP5IMOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis", SER dated April 9, 2002.
11. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, SER dated February 4, 2000.
12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
15. 03C22 Maneuvering Analysis, OSC-8630, Revision 1, November 2004.
16. 03C22 Specific DNB Analysis, OSC-8635, Revision 0, August 2004.
17. 03C22 Reload Safety Evaluation, OSC-8684, Revision 0, November 2004.

ONEI-0400-70 Rev 21 Page 5 of 33 Oconee 3 Cycle 22 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to byTS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1838 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm.

Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than:

Unear interpolation is'valid within the table provided.

Referred to by TS 3.1.3.

MTC x 10-4 Ap I OF

+0.90

+0.73 0.00 0.00 0.00

% FP 0

15 80 100 120 Departure from Nudeate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1.

4 RCP:

measured hot leg pressure > 2125 psig 3 RCP:

measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be:

Referred to by TS 3.4.1.

The measured Tavg must be less than COLR'limits minus instrumentjuncertainty. ATc is the setpoint value selected by the operators. Values are expanded by linear interpolation on page 33 of this document without instrument uncertainty.

Max Loop Tavg (Incl 20F unc)

ATc, F 4RCPOp 3RCPOp 0

581.0 581.0 1

581.4 581.2 2

581.8 581.4 3

582.1 581.7 4

582.5 581.9 5

582.9 582.1

  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be:

Referred to by TS 3.4.1.

4 RCP:

Measured > 107.5 %df 3 RCP:

Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5. group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 21 Page 6 of 33 Oconee 3 Cycle 22 EFPD o to 436 436 to EOC Core Power Level, %FP Full Incore Out of Core Backup Incore Steady State Operating Band Rod Index APSR %WD Min Max Min Max 292 +/- 5 300 30 40 292 +/- 5 300 100 100 Quandrant Power Tilt Setpoints Steady State Transient 30 -100 0 - 30 30 - 100 0 - 30 3.50 7.35 6.85 9.14 2.59 6.09 5.63 7.72 2.33 3.87 3.63 4.81 Referred to by TS 3.2.3 Maximum 0 - 100 16.29 14.22 10.07 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 21 Page 7 of 33 Oconee 3 Cycle 22 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 a-1 2100 0

41, a.

C 0

g 2000 1900 1800 1700 4-540 560 580 600 Reactor Coolant Outlet Temperature, OF 620 640

ONEI-0400-70 Rev 21 Page 8 of 33 Oconee 3 Cycle 22 RPS Power Imbalance Setpoints

% FP 4 Pumps

.0 87.7 107.9 107.9 90.4 0

0 60.4 80.6 80.6 63.1 0

% Imbalance

-33.0

-33.0

-11.6 14.4 33.0 33.0

-33.0

-33.0

-11.6 14.4 33.0 33.0 3 Pumps Maximum Allowable RPS Power Imbalance Setpoints

% FP

% Imbalance 4 Pumps 0

-35.0 87.3

-35.0 109.4

-11.6 109.4 14.4 90.0 35.0 0

35.0 3 Pumps 0

-35.0 59.6

-35.0 81.7

-11.6 81.7 14.4 62.3 35.0 0

35.0

ONEI-0400-70 Rev 21 Page 9 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints 4 Pumps

%FP 0

80 90 100 102 102 100 90 80 0

Full Incore

-30.2

-30.2

-26.9

-16.3

-14.2 17.0 19.1 29.7 29.9 29.9

-30.2

-30.2

-14.2 17.0 29.9 29.9 Backup Incore

-29.6

-29.6

-26.5

-16.3

-14.2 16.5 18.7 29.3 29.3 29.3

-29.6

-29.6

-14.2 16.5 29.3 29.3 Out of Core

-30.2

-30.2

-26.9

-16.3

-14.2 17.0 19.1 29.7 29.9 29.9

-30.2

-30.2

-14.2 17.0 29.9 29.9 3 Pumps 0.0 61.92 62.49 77.0 77.0 65.42 64.84 0.0

ONEI-0400-70 Rev 21 Page 10 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints Operation vwth 4 RCS Pumps, BOC to EOC

% FP I

RPS Trip I

Full Incore Alarmn Out of Core Alarm 107.9 107 106 105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90.38

  • 90

-89 88 87.71 87 86 85 84 83 82 81 80 0

-11.56

-12.51

-13.57

-14.64

-15.70

-16.76

-17.82

-18.88

-19.94

-21.01

-22.07

-23.13

-24.19

-25.25

-26.32

-27.38

-28.44

-29.50

-30.16

-30.56

-31.63

-32.69

-33.00

-33.00

-33.00

-33.00

-33.00

-33.00

-33.00

-33.00

-33.00

-33.00 14.40 15.36 16.42 17.48 18.54 19.60 20.66 21.73 22.79 23.85 24.91 25.97 27.04 28.10 29.16 30.22 31.28 32.35 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00

-14.16

-15.22

-16.28

-17.34

-18.40

-19.47

-20.53

-21.59

-22.65

-23.71

-24.77

-25.84

-26.49

-26.90

-27.23

-27.55

-27.65

-27.88

-28.21

-28.53

-28.86

-29.19

-29.52

-29.84

-30.17

-30.17 17.00 18.06 19.12 20.19 21.25 22.31 23.37 24.43 25.49 26.56 27.62 28.68 29.34 29.74 29.76 29.78 29.78 29.79 29.81 29.83 29.84 29.86 29.88 29.89 29.91 29.91

-14.16

-15.22

-16.28

-17.34

-18.40

-19.47

-20.53

-21.59

-22.65

-23.71

-24.77

-25.84

-26.49

-26.90

-27.23

-27.55

-27.65

-27.88

-28.21

-28.53

-28.86

-29.19

-29.52

-29.84

-30.17

-30.17 17.00 18.06 19.12 20.19 21.25 22.31 23.37 24.43 25.49 26.56 27.62 28.68 29.34 29.74 29.76 29.78 29.78 29.79 29.81 29.83 29.84 29.86 29.88 29.89 29.91 29.91

% FP I

RPS Trip Full Incore Alarm I

Out of Core Alarm ONEI-0400-70 Rev 21 Page 11 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP I RPS Trip I

Full Incore Alarm I

Out of Core Alarm 80.58 80 79 78 77.0 76 75 74 73 72 71 70 69 68

67 66 65 64.84 64 63.06 63 62 61.92 61 60.38 60 0

-11.56

-12.17

-13.23

-14.30

-15.36

-16.42

-17.48

-18.54

-19.60

-20.67

-21.73

-22.79

-23.85

-24,91

-25.98

-27.04

-28.10

-28.27

-29.16

-30.16

-30.22

-31.29

-31.37

-32.35

-33.00

-33.00

-33.00 14.40 15.02 16.08 17.14 18.20 19.26 20.32 21.39 22.45 23.51 24.57 25.63 26.70 27.76 28.82 29.88 30.94 31.11 32.01 33.00 33.00 33.00 33.00 33.00 33.00 33.00 33.00

-14.16

-15.22

-16.28

-17.34

-18.40

-19.47

-20.53

-21.59

-22.65

-23.71

-24.77

-25.84

-26.90

-27.07

-27.96

-28.96

-29.02

-30.08

-30.17

-30.17

-30.17

-30.17

-30.17 17.00 18.06 19.12 20.19 21.25 22.31 23.37 2443 25.49 26.56 27.62 28.68 29.74 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91

-14.16

-15.22

-16.28

-17.34

-18.40

-19.47

-20.53

-21.59

-22.65

-23.71

-24,77

-25.84

-26.90

-27.07

-27.96

-28.96

-29.02

-30.08

-30.17

-30.17

-30.17

-30.17 17.00 18.06 19.12 20.19 21.25 22.31 23.37 24.43 25.49 26.56 27.62 28.68 29.74 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91 29.91

-30.17

% FP I

RPS Trip Full Incore Alarm I

Out of Core Alarm ONEI-0400-70 Rev 21 Page 12 of 33 Oconee 3 Cycle 22 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120

(-11.6,107.9)

(14.4,107.9)

Ml = 0.942

(-33.0,87.7)

Acceptable

(-11.6,80.6):

(14.4,80.6)

Operation M2 = -0.942 (33.0,90.4)

(-33.0,60.4) 60 -

Acceptable 3 or 4 Pu 40-

20 20-up Operatioin (33.0,63.1)

Jf I

-30.0

-20.0

-10.0 0.0 10.0 Percent Power Imbalance 20.0 30.0 40.0

(

C Oconee 3 Cycle 22 Imbaoince Setpoints for 4 Pump Operation, BOC to EOC ONEI-0400.(

.ev 21 Page 13 of 33 110 100 90 80 70 so CL 4-00~

0 a,

60 50 40 30 20 10 0

-40

-35

-30

-25

-20

-15

-10

-5 0

5 Percent Axial Imbalance 10 15 20 25 30 35 40

(

Oconee 3 Cycle 22 Imbalance Setpoints for:3 Pump Operation, BOC to EOC ONEI-0400-74.,ev 21 Page 14 of 33 110 0 100 I

90 RPS Trip Setpoint RPS Trip Setpoint ~

I 80 Incore & Outcore Alarm 70 I-0 CL.

U.-

0 C

0L 60 50

-I.. Ir 1 40 30 20 10 0 w

-35

-30

-40

-25

-20

-15

-10

-5 9

0 5

10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev 21 Page 15 of 33 Oconee 3 Cycle 22 4 Pumps 3 Pumps Operational Rod Index Setpoints RI Insertion Setpoint

%FP No nop Rod 1 Inop Rod 102.0 261.5 291.7 100.0 261.5 289.5 90.0 261.5 278.3 80.0 261.5 267.2 50.0 201.5 233.7 48.0 195.2 231.5 15.0 91.5 165.5 13.0 76.5 161.5 5.0 16.5 93.5 3.0 1.5 76.5 2.8 0.0 74.8 0.0 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300

-77.0 75.0 50.0 48.0 15.0 13.0 5.0 3.0 2.8 0.0 255.5 251.5 201.5 195.2 91.5 76.5 16.5 1.5 0.0 0.0 285.2 281.5 235.2 231.5 165.5 161.5 93.5 76.5 74.8 51.0

ONEI-0400-70 Rev 21 Page 16 of 33 Oconee 3 Cycle 22 Shutdown Margin Rod Index Setpoints 4 Pumps 3 Pumps

%FP 102.0 100.0 48.0 13.0 3.0 2.8 0.0 77.0 75.0 48.0 13.0 3.0 2.8 0.0 RI Insertion Setpoint No Inop Rod 1 Inop Rod 224.6 291.7 221.5 289.5 141.5 231.5 76.5 161.5 1.5 76.5 0.0 74.8 0.0 51.0 RI Withdrawal Setpoint 300 300 300 300 300 300 300 300 300 300 300 300 300 300 227.4 221.5 141.5 76.5 1.5 0.0 0.0 285.2 281.5 231.5 161.5 76.5 74.8 51.0

Oconee 3 Cycle 22 Rod Index Setpoints 4 Pump Operaton, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 21 Page 17 of 33 ShtonMar In Sen Operational Alarm Setpoint

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 99.8 24.8 t00 100 61.5 101 100 99.0 24.0 100 100 61.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 61.5 98 100 96.7 21.7 100 100 61.5 97 100 95.9 20.9 100 100 61.5 96 100 95.2 20.2 100 100 61.5 95 100 94.4 19.4 100 100 61.5 94 100 93.6 18.6 100 100 61.5 93 100 92.9 17.9 100 100 61.5 92 100 92.1 17.1 100 100 61.5 91 100 91.3 16.3 100 100 61.5 90 100 90.6 15.6 100 100 61.5 89 100 89.8 14.8 100 100 61.5 88 100 89.0 14.0 100 100 61.5 87 100 88.2 13.2 100 100 61.5 86 100 87.5 12.5 100 100 61.5 85 100 86.7 11.7 100 100 61.5 84 100 85.9 10.9 100 100 61.5 83 100 85.2 10.2 100 100 61.5 82 100 84.4 9.4 100 100 61.5 81 100 83.6 8.6 100 100 61.5 80 100 82.9 7.9 100 100 61.5 79 100 82.1 7.1 100 100 59.5 78 100 81.3 6.3 100 100 57.5 77 100 80.6 5.6 100 100 55.5 76 100 79.8 4.8 100 100 53.5 75 100 79.0 4.0 100 100 51.5 74 100 78.2 3.2 100 100 49.5 73 100 77.5 2.5 100 100 47.5 72 100 76.7 1.7 100 100 45.5 71 100 75.9 0.9 100 100 43.5 70 100 75.2 0.2 100 100 41.5 69.8 100 75.0 0

100 100 41.1 69 100 73.8' 0

100 100 39.5 68 100 72.3 0

Wo 100 37.5 610,0 70.7 0

100 100 35.5 66 100 69.2 0

100 100 33.5 65 100 67.7 0

100 100 31.5 64 100 66.1 0

100 100 29.5 63 100 64.6 0

100 100 27.5 62 100 63.0 0

100 100 25.5 61.8 100 62.7 0

100 100 25.0 61 100 61.5 0

100 99.2 24.2 60 100 60.0 0

100 98.2 23.2 59 100 58.4 0

100 97.2 22.2 58 100 56.9 0

100----96.2 21.2 57 100 55.3 0

100 95.2 20.2 56 100 53.8 0

100 94.2 19.2 55 100 52.3 0

100 93.2 18.2 54 100 50.7 0

100 92.2 17.2 53 100 49.2 0

100 91.2 16.2 52 100 47.7 0

1 90.2 15.2 51 100 46.1 0

100 89.2 14.2 50 100 44.6 0

100 88.2 13.2

% FP CRGP 5 CRGP 6 CRGP7 CRGP5 CRGP6 CRGP7 D

Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Continued on next page.

Oconee 3 Cycle 22 Rod Index Setpoints 4 Pump Operation, No inoperable Rods, BOC to EOC ONEI-0400-70 Rev 21 Page 18 of 33 Shutdown Margin Setpoint

- Operational Alarm Setpoint

%FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 49 100 43.0 0

100 86.7 11.7 48 100 41.5 0

100 85.1 10.1 47 100 39.6 0

100 83.5 8.5 46 100 37.8 0

100 82.0 7.0 45 100 35.9 0

100 80.4 5.4 44 100 34.1 0

100 78.8 3.8 43 100 32.2 0

100 77.2 2.2 42 100 30.4 0

100 75.7 0.7 41.6 100 29.6 0

100 75.0 0

41 100 28.5 0

100 73.2 0

40 100 26.6 0

100 70.1 0

39.1 100 25.0 0

100 67.3 0

39 99.9 24.9 0

100 66.9 0

38 99.0 24.0 0

100 63.8 0

37 98.0 23.0 0

100 60.6 0

36 97.1 22.1 0

100 57.5 0

35 96.2 21.2 0

100 54.3 0

34 95.2 20.2 0

100 51.2 0

33 94.3 19.3 0

100 48.1 0

32 93.4 18.4 0

100 44.9 0

31 92.5 17.5 0

100 41.8 0

30 91.5 16.5 0

100 38.6 0

29 90.6 15.6 0

100 35.5 0

28 89.7 14.7 0

100 32.4 0

27 88.8 13.8 0

100 29.2 0

26 87.8 12.8 0

100 26.1 0

25.7 87.5 12.5 0

100 25.0 0

25 86.9 11.9 0

99.0 24.0 0

24 86.0 11.0 0

97A 22.4 0

23 85.0 10.0 0

95.8 20.8 0

22 84.1 9.1 0

94.2 19.2 0

21 83.2 8.2 0

92.7 17.7 0

20 82.2 7.2 0

91.1 16.1 0

19 81.3 6.3 0

89.5 14.5 0

18 80.4 5.4 0

88.0 13.0 0

17 79.5 4.5 0

-86.4 11.4 0

16-78.5 3.5 0

' 84.8 9.8 0

15 7T6 2.6 0

83.2 8.2 0

14 76.7 1.7 0

79.5 4.5 0

13 75.8 0.8 0

75.8 0.8 0

12.8 75.0 0

0 75.0 0

0 12 69.0 0

0 69.0 0

0 11 61.5 0

0 61.5 0

0 10 54.0 0

0 54.0 0

0 9

46.5 0

0 46.5 0

0 8

39.0 0

0 39.0 0

0 7

31.5 0

0 31.5 0

0 6

24.0 0

0 24.0 0

0 5

16.5 0

0 16.5 0

0 4

9.0 0

0 9.0 0

0 3

1.5 0

0 1.5 0

0 2.8 0

0 0

0 00 2

0

-0 0

0 0

0 1

0 0

0000 0

0 0

0 0 _

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 Rod Index Setpoints 3 Pump Operation, No Inoperable Rods, BOC to EOC ONEI-0400-70 Rev 21 Page 19 of 33 Shutdown Margin Setd e

tiona I Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 55.5 76.2 100 100 25.0 100 100 53.9 76 100 99.7 24.7 100 100 53.5 75 100 98.2 23.2 100 100 51.5 74 100 96.8 21.8 100 100 49.5 73 100 95.3 20.3 100 100 47.5 72 100 93.8 18.8 100 100 45.5 71 100 92.3 17.3 100 100 43.5 70 100 90.8 15.8 100 100 41.5 69 100 89.4 14.4 100 100 39.5 68 100 87.9 12.9 100 100 37.5 67 100 86.4 11.4 100 100 35.5 66 100 84.9 9.9 100 100 33.5 65 100 83A 8.4 100 100 31.5 64 100 82.0 7.0 100 100 29.5 63 100 80.5 5.5 100 100 27.5 62 100 79.0 4.0 100 100 25.5 61.8 100 78.6 3.6 100 100 25.0 61 100 77.5 2.5 100 99.2 24.2 60 100 76.0 1.0 100 98.2 23.2 59.3 100 75.0 0

100 97.6 22.6 59 100 74.1 0

100 97.2 22.2 58 100 71.1 0

100 96.2 21.2 57 100 68.2 0

100 95.2 20.2 56 100 65.2 0

100 94.2 19.2 55 100 62.2 0

100 93.2 18.2 54 100 59.3 0

100 92.2 17.2 53 100 56.3 0

100 91.2 16.2 52 100 53.4 0

100 90.2 15.2 51 100 50.4 0

100 89.2 14.2 50 100 47.4 0

100 88.2 13.2 49 100 44.5 0

100 86.7 11.7 48 100 41.5 0

100 85.1 10.1 47 100 39.6 0

100 83.5 8.5 46 100 37.8 0

100 82.0 7.0 45 100 35.9 0

100 80.4 5.4 44

_10 34.1 0

100 78.8 3.8 43 100 32.2 0100 77.2 2.2 42 100 30.4 0

100 75.7 0.7 41.6 100 29.6 0

100 75.0 0

41 100 28.5 0

100 73.2 0

40 100 26.6 0

100 70.1 0

39.1 100 25.0 0

100 67.3 0

39 99.9 24.9 0

100 66.9 0

38 99 24.0 0

100 63.8 0

37 98 23.0 0

1100 60.6 0

36 971 22.1 0

100 57.5 0

35 96.2 21.2 0

100 54.3 0

34 95.2 20.2 0

100 51.2 0

33 94.3 19.3 0

100 48.1 0

32 93.4 18.4 0

100 44.9 0

31 92.5 17.5 0

100 41.8 0

30 91.5 16.5 0

100 38.6 0

29 90.6 15.6 0

100 35.5 0

28 89.7 14.7 0

100 32.4 0

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Continued on next page.

Oconee 3 Cycle 22 Rod Index Setpoints Pump Operation, No Ino erable Rods, BOC to EOC ONEI-0400-70 Rev 21 Page 20 of 33 ShUtdown Margin Setpoint Opera ional Alarm Setpodnt

% FP CRGP 5 CRGP6

-CRGP7 CRGP5 CRGP6 CRGP7 27 88.8 13.8 0

100 29.2 0

26 87.8 12.8 0

100 26.1 0

25,7 87.5 12.5 0

100 25.0 0

25 86.9 11.9 0

99.0 24.0 0

24 86.0 11.0 0

97.4 22.4 0

23 85.0 10.0 0

95.8 20.8 0

22 84.1 9.1 0

94.2 19.2 0

21 83.2 8.2 0

92.7 17.7 0

20 82.2 7.2 0

91.1 16.1 0

19 81.3 6.3 0

89.5 14.5 0

18 80.4 5.4 0

88.0 13.0 0

17 79.5 4.5 0

86.4 11.4 0

16 78.5 3.5 0

84.8 9.8 0

15 77.6 2.6 0

83.2 8.2 0

14 76.7 1.7 0

79.5 4.5 0

13 75.8 0.8 0

75.8 0.8 0

12.8 75.0 0

0 75.0 0

0 12 69.0 0

0 69.0 0

0 11 61.5 0

0 61.5 0

0 10 54.0 0

0 54.0 0

0 9

46.5 0

0 46.5 0

0 8

39.0 0

0 39.0 0

0 7

31.5 0

0 31.5 0

0 6

24.0 0

0 24.0 0

0 5

16.5 0

0 16.5.

0 0

4 9.0 0

0 9.0 0

0 3

1.5 0

0 1.5 0

0 2.8 0

0 0

0 0

0 2

0 0

0 0

0 0

1 0

0 0

0 0

0 0

0 0

0 0

0 0

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP 7 Shtvdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 Rod Index Setpoints 4 Pump Operation, 1 Inoperabfe Rod, BOC to EOC ONEI-0400-70 Rev 21 Page 21 of 33 Shutdown Margin spnt Operational Alarm Setpoint

%FP CRGP5' CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 100 91.7 100 100 91.7 101 100 100 90.6 100 100 90.6 100 100 100 89.5 100 100 89.5 99 100 100 88.4 100 100 88.4 98 100 100 87.3 100 100 87.3 97 100 100 86.2 100 100 86.2 96 100 100 85.0 100 100 85.0 95 100 100 83.9 100 100 83.9 94 100 100 82.8 100 100 82.8 93 100 100 81.7 100 100 81.7 92 100 100 80.6 100 100 80.6 91 100 100 79.5 100 100 79.5 90 100 100 78.3 100 100 78.3 89 100 100 77.2 100 100 77.2 88 100 100 76.1 100 100 76.1 87 100 100 75.0 100 100 75.0 86 100 100 73.9 100 100 73.9 85 100 100 72.8 100 100 72.8 84 100 100 71.7 100 100 71.7 83 100 100 70.5 100 100 70.5 82 100 100 69.4 100 too 69.4 81 100 100 68.3 100 100 68.3 80 100 100 67.2 100 100 67.2 79 100 100 66.1 100 100 66.1 78 100 100 65.0 100 100 65.0 77 100 100 63.8 100 100 63.9 76 100 100 62.7 100 100 62.7 75 100 100 61.6 100 100 61.6 74 100 100 60.5 100 100 60.5 73 100 100 59.4 100 100 59.4 72 100 100 58.3 100 100 58.3 71 100 100 57.2 100 100 57.2 70 100 100 56.0 100 100 56.0

.69

.100 100 54.9 100 100 54.9 68 100 100 53.8 100 100 53.8 67 100 100 52.7 400 100 52.7 66 V

100 100 51.6 100 100 51.6 65 100 100 50.5 100 100 50.5 64 100 100 49.3 100 100 49.3 63 100 100 48.2 100 100 48.2 62 100 100 47.1 100 100 47.1 61 100 100 46.0 100 100 46.0 60 100 100 44.9 100 100 44.9 59 100 100 43.8 100 100 43.8 58 100 100 42.7 100 100 42.7 57 100 100 41.5 100 100 41.5 56 100 100 40.4 100 100 40.4 55 100 100 39.3 100 100 39.3 54 100 100 38.2 100 100 38.2 53 100 100 37.1 100 100 37.1 52 100 100 36.0 100 100 36.0 51 100 100

_ 34.8 100 100 34.8 50 100 100 33.7 100 100 33.7 49 100 100 32.6 100 100 32.6 48 100 100 31.5 100 100 31.5

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Continued on next page.

Oconee 3 Cycle 22 Rod Index Setpoints 4 Pump Operation, II Ioperable Rod, BOC to EOC ONEI-0400-70 Rev 21 Page 22 of 33 Shutdown Margin Setpoint Operational Alarm Setpoint

%FP CRGP 5 CRGP6 CRGP 7 CRGPS CRGP 6 CRGP7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 242 100 992 24.2 43 100 98.2 232 100 98.2 23.2 42 100 97.2 222 100 97.2 22.2 41 100 96.2 212 100 96.2 21.2 40 100 952 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 912 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 132 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 862 11.2 30 100 85.2 10.2 100 85.2 10.2 29

-100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 72 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0

100 75.0 0

19 100 73.5 0

100 73.5 0

18 100 71.5 0

100 71.5 0

17 100 69.5 0

100 69.5 0

16 100 67.5 0

100 67.5 0

15 100 65.5 0

100 65.5 0

14 100 63.5 0

100

-63.5 0

13 100 61.5 0

100 61.5 0

12 100 53.0 0

100 53.0 0

11 100 44.5 0

100 44.5 0

10-100 36.0 0

100 36.0 0

9 100 27.5 0

100 27.5 0

8.7 100 25.0 0

100 25.0 0

8 97.0 22.0 0

97.0 22.0 0

7 92.8 17.8 0

92.8 17.8 0

6 88.5 13.5 0

88.5 13.5 0

5 84.2 9.2 0

° 84.2 9.2 0

4 80.0 5.0 0

80.0 5.0 0

3 75.8 0.8 0

75.8 0.8 0

2.8 75.0 0

0 75.0 0

0 2

68.0 0

0 68.0 0

0 1

59.5 0

0 59.5 0

0 0

51 0

_=

51 0

0

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 Rod Index Setpoints 3 Pump Operation, I Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 21 Page 23 of 33 Shutdown Margin SntOpera ional Alarm Setpoint

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 too 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 952 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100

_ 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 100 81.2__ 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpolnt RI = 300 is withdrawal limit at all power levels.

Continued on next page.

Oconee 3 Cycle 22 Rod Index Setpoints 3 Pump Operation. I Inoperable Rod, BOC to EOC ONEI-0400-70 Rev 21 Page 24 of 33 Shutdown Margin Setpolnt Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 782 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 12 20 100 75.2 02 100 75.2 0.2 19.8 100 75.0 0

100 75.0 0

19 100 73.5 0

100 73.5 0

18 100 71.5 0

100 71.5 0

17 100 69.5 0

100 69.5 0

16 100 67.5 0

100 67.5 0

15 100 65.5 0

100 65.5 0

14 100 63.5 0

100 63.5 0

13 100 61.5 0

100 61.5 0

12 100 53.0 0

100 53.0 0

1 1 100 44.5 0

100 44.5 0

10 100 36.0 0

100 36.0 0

9 100 27.5 0

100 27.5 0

8.7 100 25.0 0

100 25.0 0

8 97.0 22.0 0

97.0 22.0 0

7 92.8 17.8 0

92.8 17.8 0

6 88.5 13.5 0

88.5 13.5 0

5 84.2 92 0

84.2 9.2 0

4 80.0 5.0 0

80.0 5.0 0

3 75.8 0.8 0

75.8 0.8 0

2.8 75.0 0

0 75.0 0

0 2

68.0 0

0 68.0 0

0 1

59.5 0

0 59.5 0

0 0

51 0

0 51 0

0

%FP CRGP 5 CRGP 6 CRGP CRGP5 CRGP 6 CRGP 7 Shutdown arnSepint Operational Alarm Setpoint RI = 300 Is withdrawal limit at all power levels.

C

(

ONEI-0400-70(

21 IPage 25 of 33.

I Ocorie 3 C-cle2 I

105 100 95 90 85 80 75 70Q\\

65 CLU-60 4)55 0.LI. 50

.2 M45 40 35 30 25 20 15 10 5

0 l'U I I I IIMINI11II H19 IifL~tIMII II IIII I I III'lR estricted

.... 95 Operation 9

itill I'.85

..... 1. 111 - I, 1. I I I, t ll.

t8 0

]fi75 fil]

cIIjM Il Ht M

70il l

I I

I HI II I'llf I atiI n fi65 I

H il iii I

M I it iii~l ii i60

]I H ll I-ill im itf55 Acceptable 50111 milliOHILLtion

[Hil

Hil, H t Ilu 11145 111111 I

fill limi HU f40 I

Mll L35 5il 15 2

5 4

5 5

7 5

9 1111 1 ti le A

5 0

1-0 10 20 30 40 50 60 70 80 90 1001 I-0 10 20 30 40 50 60 70 80 90 1001I IGroup 5 I Group 7 Control Rod Position, % WD

(

(

ONEI-0400-7(

v 21

-j Oconee 3 -Cyle 22! L Page 26 of 33 105 -

100 t=ltttt lira=

m Control Rod Positio Stipoints No Inoperable l

R Np Flow 105 100 95 90 85 95 90 85 80 75 80 75 70 70 65 60 55 50 45 Unrn~ceptab e Opcaion~ '

z rITT 65 60 55 50 45 40 35 fRestridted

-Qpeortlon 40 35 30 25 Acceptable Operation

......II

.- 30 1111111111 25

;I 20 rm ; I r1m5~r e di 20 15 p=

10 10 5

5 0r

[1

'Group 6 1 111111 Mw ll 6II IP#

35 45 55 65 75 85 95 t 5-15-: 25 I

I I

0 10 20 30 40 50 60 70 80 90 100 I

I Group 5 l I 0 10 20 30 40 50 60 70 80 90 100 I Group 7 Control Rod Position, % WD

(

(

ONEI-0400-.

,v 21 Page 27 of 33 I

Oconee 3 Cycle22 I

I O!

10(

410 3'

24 8i 5

il I

I I Inoperabe

.od,.4..

n..

Flow.

t~~~

...............3..m"mmmxtllll HI I ]I, I.I i I I 1*

1 11 1 it lil I:FFR 11111 iiltllllllllll 5 w I# 11 I

S1

_m m S m m iS llT~iiiiiTllllliiit tiW l~lilil It I1 1 lIl I I I I tltlf 11 11 1 I 14lMXm.XWmwwX OperaIion U!t 1IIII MR.H*ilil II~llilt I11111111111l t

Li)t ilt fdh Uncceptable

-pTa 5

OperItlon ljil~~~~~~~~~~~~~~~~~ilii11 1

111111111111 I

I

'rI +$I 11111 lli46lllm+ "

1_i@T 1 I[]4 5

llliiiiillllilll lil lili I tl*lLH P*eLlo t

1111 lllllllli[iii ll 1111111 111 Il i1 I

HH ii Op r

111111111111111nlllilllllllllll11Illt' lllll1111[I i

i r

n 5

11 I

1St I

all Illlllllllll ltHlt 1111111 f lllffl 1 [lisflt

_1I L)11lV i

5l I

,.J h lllltltllhttllX Hil I

l

_iF g

llftllum llltl O

Li 11 lt m' l

[

S]l i

'I

_u lll l

llt I~ IM~~llTtTlla,

_H lLH 5

5 5

5 5

55 65 75 85 9

401 105 100

'95 90 85 80 75 07 65 60 55 50 45 40 35 30 F25 W20 p15 5

0o I 0 10 20 30 40 50 60 70 80 90 100 I Group 5 I 0 10 20 30 40 50 60 70 80 90 100 I I Group 7 Control Rod Position, % WD

(

I I

Oconee 3 Cycfe 22.

I 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5

A I

Control Rod Position Setpolnts I InoperabfeRoct,3. I'wrM Flow TE g

X ZE iiiiittl E

nll 11111uE E

rln mTTm E

rlll rrlQl ITrr E

r IIlTlm EnTr mIm e

E wrtr iiiiilll rlE g rarT ¢nTr ET E zrm IIm MT rmTmT

,IIIS Iml E

nlll mr B

mr rlllrarr g g 511 1

mr CrTF m mr

,xr.rTrr TrrT I rnTrTr m

mrmr E

[(llr mT m

rm uTrrur E

zm l rrm m

1: Fr m

lallalil a

fflir I rTl imJm Dlill rnTv m mmr Ililr rrilrm rwr tIrmm tm TmTl4+4I m

mImT Z

I m

14 I fi^lrm iiiiillr E

il 11 ITTTTm m,,,,,,

11 llr rm m

ffl g

l l l 1 l l TTTrT m

i f*emt tlt S: mmu R

S S

rTr iiilBa m

3 m

i Group 6 Unaccepthble

'Operation 105 100 95 90 85 80 75 70 60 55 iso 50 45 40 35 R 30 25 20 15 10 00l ONEI-0400-(

v 21 Page 28 of 33 Acceptable Operation 1i4l I

I 5 -15 25 35 45 55 65 75 85 95 111i11 1.......

I...rrl (r

1r111 1 II I

r

.I

l.

rI r IL0 10 20 30 40 50 60 70. 80 90 100 I

I I

I o 10=

20 30 40 50 60 70 80 90 100 Group 5 1 I Group 7 l Control Rod Position, % WD

=-

ONEI-0400-70 Rev 21 Page 29 of 33 Oconee 3 Cycle 22 2.0 Core Operating Limits -

Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Information provided In this section should not be used in plant procedures.

Core Power Level, Quadrant Power Ti Core Outl p

ii 2

2:

2:

%FP 3(

ilt, %

Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State 1

) - 100 0 - 30 30 - 10' 5.69 10.00 9.44 Transient 0

0 - 30 12.00 Maximum 0 - 100 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 et Pressure Reactor Coolant Outlet Temperature, TF Asia 3 RCS Pumps 4 RCS Pumps BOO 581.0 578.3 900 590.0 587.3 000 598.9 596.3 100 607.9 605.2 200 616.9 614.2 300 625.9 623.2

ONEI-0400-70 Rev 21 Page 30 of 33 Oconee 3 Cycle 22 Axial Power Imbalance Protective Limits Referred to byTS 2.1.1 Not for Plant Use

%FP RPS Operational 4 Pumps 3 Pumps 0

80 87.3 90 100 109.4 109.4 100 90 80 0

0 59,6 77.0 81.7 81.7 77.0 62.3 0

-35.0

-35.0

-11.6 14.4 35.0 35.0

-35.0

-35.0

-11i.6 14.4 35.0 35.0

-42.2

-42.2

-38.8

-26.6 30.0 42.3 41.8 41.8

-42.2

-42.2 41.8 41.8

ONEI-0400-70 Rev 21 Page 31 of 33 Oconee 3 Cycle 22 Rod Index Limits Referred to by TS 3.2.1 l

Not for Plant Use Operational RI Shutdown Margin RI Insertion Limit

%FP Insertion Limit No Inop Rod I Inop Rod 4 Pumps 3 Pumps 102 100 90 80 50 15 5

77 50 15 5

260 260 260 260 200 90 0

254 200 90 0

220 140 75 0

220 140 75 0

288 230 160 75 280 230 160 75 RI Withdrawal Limit 300 300 300 300 300 300 300 300 300 300 300

ONEI-0400-70 Rev 21 Page 32 of 33 Oconee 3 Cycle 22 LOCA Limits l

Not for Plant Use Core Elevation Feet LOCA LHR kw/ft Limit Versus Bumup Mk-B10 Fuel Mk-BII Fuel 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0.000 2.506 4.264 6.021 7.779 9.536 12.00 0 GWd/mtU 15.6 16.5 16.8 17.0 17.0 16.7 15.8 0 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 0 GWd/mtU 14.9 15.7 15.8 15.9 15.8 15.7 14.9 30 GWd/mtU 15.6 16.5 16.8 17.0 17.0 16.7 15.8 40 GWd/mtU 16.6 17.5 17.6 17.7 17.6 17.5 16.6 40 GWd/mtU 14.9 15.7 15.8 15.9 15.8 15.7 14.9 62 GWdImtU 11.6 11.6 11.6 11.6 11.6 11.6 11.6 62 GWd/mtU 12.2 12.2 12.2 12.2 12.2 12.2 12.2 62 GWd/mtU 11.0 11.0 11.0 11.0 11.0 11.0 11.0 WH-177 Fuel 0.000 2.506 4.264 6.021 7.779 9.536 12.00

ONEI-0400-70 Rev 21 Page 33 of 33 Oconee 3 Cycle 22 Instrument uncertainties are not nlauded In the values shortn l

4 RPOperation - Loop Average T=Mp., OF.

3 RC? Opertion - Loop Averge Temp.. F iTcold, 0F Tavg (Ainalytical)

Tavg (Analytical) 0.0

<581.0

<581.0 0.1

<581.0

<581.0 0.2

<581.1

<581.0 0.3

<581.1

<581.1 0.4

<581.2

<581.1 0.5

<581.2

<581.1 0.6

<581.2

<581.2 0.7

<581.3

<581.2 0.8

<581.3

<581.2 0.9

<581.3

<581.2

1.

<581.4

<581.2 1.1

<581.4

<581.2 1.2

<581.5

<581.3 1.3

<581.5

<581.3 1.4

<581.5

<581.3 1.5

<581.6

<581.3 1.6

<581.6

<581.4 1.7

<581.6

<581.4 1.8

<581.7

<581.4 1.9

<581.7

<581.4 2.0

<581.8

<581.4 2.1

<581.8

<581.5 2.2

<581.8

<581.5 2.3

<581.9

<581.5 2.4

<58129

<581.5 2.5

<582.0

<581.6 2.6

<582.0

<581.6 2.7

<582.0

<581.6 2.8

<582.1

<581.6 2.9-

<582.1

<581.6

-3

<582<581.7 3.1

<582.2

<581.7 3.3

<581.7 3.4

<52.3

<581.7 3.5

<5823

<581.8 3.6

<582A.

<581.8 3.7.

<582.4

<581.8 3.8

<582A

<581.8 3.9

<582.5

<581.9 4.0

<582.5

<581.9 4.1

<582.6

<581.9 4.2

<582.6

<581.9 4.3

<582.6

<581.9 4.4

<582.7

<582.0 4.5

<582.7

<582.0 4.6

<582.7

<582.0 4.7

<582.8

<582.0 4.8

<582.8

<582.1 4.9

<582.9

<582.1 50<582.9

<582.1