ML043430441

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report (Colr), Cycle 22, Rev. 21
ML043430441
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/30/2004
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONEI-0400-70, Rev 21
Download: ML043430441 (35)


Text

_ Duke RON A. JONES E Power. Vice President Oconee Nuclear Site A Duke Energy Company Duke Power ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax November 30, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Site Docket No. 50-287 Core Operating Limits Report (COLR)

Gentlemen:

Attached, pursuant to Oconee Technical Specifications 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 3, Cycle 22, Rev. 21.

Ve uly yours, Ro s Site, Vice President Oconee Nuclear Site Attachment

-Oc) www. dukepower. corn

NRC Document Control Desk November 30, 2004 Page 2 xc wlatt: Mr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation Mr. Mel Shannon Senior Resident Inspector Oconee Nuclear Site

ONEI-0400-70 Rev 21 Page 1of 33 Duke Power Company

-Oconee 3 Cycle 22 Core Operating Limits Report QA Condition I FOR INFORMATION ONLY Prepared By: A.T. Godfrey All A/ /a Date: (5'DO 2.OOI/

Checked By: L. D. Mc Clain / Date: )bN6ig/ 2oV-CDR By: G.J. Byers Date: \\

V Approved By: R.R. St.Clair , , Date Date:,: / /°

Document No. / Rev. ONEI-0400-70 Rev. 21 Date November 10. 2004 Page No. Page 2 of 33 INSPECTION OF ENGINEERING INSTRUCTIONS Inspection Waived By: Hi Date: 11,/Y40" (Spons&)'.

CATAWBA Inspection Waived MCE (Mechanical & Civil) E Inspected By/Date:

RES (Electrical Only) [ Inspected By/Date:

RES (Reactor) E Inspected By/Date:

MOD D Inspected By/Date:

Other ( ) l Inspected By/Date:

OCONEE Inspection Waived MCE (Mechanical & Civil) 0 Inspected By/Date:

RES (Electrical Only) 0 Inspected By/Date:  :

RES (Reactor) 0 Inspected By/Date:

MOD Inspected By/Date:

(

Other _) Q Inspected By/Date:

-MCGUIRE Inspection Waived MCE (Mechanical & Civil) D Inspected By/Date:

RES (Electrical Only) [ Inspected By/Date:

RES (Reactor) a Inspected By/Date:

MOD El Inspected By/Date:

Other ( [ I)nspected By/Date:

ONEI-0400-70 Rev 21 Page 3 of 33 Oconee 3 Cycle 22 Core Operating Limits Report Insertion Sheet for Revision 21 This revision Is not valid until the end of operation for Oconee 3 Cycle 21.

Remove these Revision 20 pages Insert these Revision 21 pages 1-33 1-33 Revision Log Effective Pages Pages Pages Total Effective Revision Date Revised Added Deleted Pages 1Oconee 3 Cycle 22 revisions below 1 21 Nov 2004 1 33 lOconee 3 Cycle 21 revisions below 20 Sep 2004 1 6 - - 33 19 Feb2004 1-4,6 - - 33 18 Nov.2003 1 -3, 5 - - 33 17 Apr. 2003 1 - 31 32 - 33 - 33

. CXn3Gycle O revlslqrns below --.

4 -ct.2002 -1.3,5 - - 31 N15

.Nov.2001 1-3 - - 31 14 Nov. 2001 1 31

ONEI-0400-70 Rev 21 Page 4 of 33 Oconee 3 Cycle 22 1.0 Error Adjusted Core Operating Lmits The Core Operating Umits Report for 03C22 has been prepared in accordance with the requirements of TS 5.6.5. The core operating limits within this report have been developed using NRC approved methodology identified in references I through 11. The RPS protective limits and maximum allowable setpoints are documented in references 12 through 14. These limits are validated for use in 03C22 by references is through 17. The 03C22 analyses assume a design flow of 107.5% of 88,000 gpm per RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB) Tavg reduction of up to 10"F provided 4 RCPs are in operation and Tavg does not decrease below 569*F.

The error adjusted core operating limits Included In section 1 of the report incorporate all necessary uncertainties and margins required for operation of the 03C22 reload core.

1.1 References

1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1004P-A, Revision 0, SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002A, Revision 1.

SER dated October 1, 1985.

3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5, SER dated December 8,2000.
4. ONS Core Thermnal Hydraulic Methodology Using VIPRE-01, DPG-NE-2003P-A, Revision 1, SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005P-A, Revision 2, SER dated June 8, 1999.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008P-A, Revision 0. SER dated April 3,1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 2, SER dated September 24,2003.
8. DPC-NE'-OOOP-A, Thermal Hydraulic Transient Analysis Methodology, Rev. 3, SER dated September 24,2003.
9. BAW-10192-PA, BWNT LOCA- BWNT Loss of Coolant Accident Evaluation Model for Once-Through Steam Generator Plants, SER dated February 18,1997.
10. BAW-10164P-A, Rev. 4, "REiAP5IMOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis", SER dated April 9, 2002.
11. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel, SER dated February 4, 2000.
12. RPS RCS Pressure & Temperature Trip Function Uncertainty Analyses and Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of 1.094, OSC-5604, Revision 2, October 2001.
14. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
15. 03C22 Maneuvering Analysis, OSC-8630, Revision 1, November 2004.
16. 03C22 Specific DNB Analysis, OSC-8635, Revision 0, August 2004.
17. 03C22 Reload Safety Evaluation, OSC-8684, Revision 0, November 2004.

ONEI-0400-70 Rev 21 Page 5 of 33 Oconee 3 Cycle 22 Miscellaneous Setpoints BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.

Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2220 ppm.

Referred to byTS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.

Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 1838 ppm. The average boron concentration in the CFT's shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm.

Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1%Ak/k.

Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than: MTC x 10-4 Unear interpolation is'valid within the table provided. Ap I OF  % FP Referred to by TS 3.1.3. +0.90 0

+0.73 15 0.00 80 0.00 100 0.00 120 Departure from Nudeate Boiling (DNB) parameter for RCS loop pressure shall be Referred to by TS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig 3 RCP: measured hot leg pressure > 2125 psig DNB parameter for RCS loop average temperature shall be: Max Loop Tavg (Incl 20 F unc)

Referred to by TS 3.4.1. ATc, F 4RCPOp 3RCPOp 0 581.0 581.0

  • The measured Tavg must be less than COLR'limits minus 1 581.4 581.2 instrumentjuncertainty. ATc is the setpoint value selected by 2 581.8 581.4 the operators. Values are expanded by linear interpolation on 3 582.1 581.7 page 33 of this document without instrument uncertainty. 4 582.5 581.9 5 582.9 582.1
  • This limit is applied to the loop with the lowest loop average temperature consistent with the NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be: 4 RCP: Measured > 107.5 %df Referred to by TS 3.4.1. 3 RCP: Measured > 74.7 % of 4 RCP min flow Regulating rod groups shall be withdrawn in sequence starting with group 5. group 6, and finally group 7.

Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% +/- 5% between two sequential groups.

Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculations when determining if overlap requirements are met as these situations are explicitly addressed by TS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3 (Quadrant Power Tilt).

ONEI-0400-70 Rev 21 Page 6 of 33 Oconee 3 Cycle 22 Steady State Operating Band Rod Index APSR %WD EFPD Min Max Min Max o to 436 292 +/- 5 300 30 40 436 to EOC 292 +/- 5 300 100 100 Quandrant Power Tilt Setpoints Steady State Transient Maximum Core Power Level, %FP 30 -100 0 - 30 30 - 100 0 - 30 0 - 100 Full Incore 3.50 7.35 6.85 9.14 16.29 Out of Core 2.59 6.09 5.63 7.72 14.22 Backup Incore 2.33 3.87 3.63 4.81 10.07 Referred to by TS 3.2.3 Correlation Slope (CS) 1.15 Referred to by TS 3.3.1 (SR 3.3.1.3).

ONEI-0400-70 Rev 21 Page 7 of 33 Oconee 3 Cycle 22 Variable Low RCS Pressure RPS Setpoints Referred to by TS 3.3.1 2400 2300 2200 a-1 2100 0

41, a.

C 0

g 2000 1900 1800 1700 4-540 560 580 600 620 640 Reactor Coolant Outlet Temperature, OF

ONEI-0400-70 Rev 21 Page 8 of 33 Oconee 3 Cycle 22 RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps .0 -33.0 87.7 -33.0 107.9 -11.6 107.9 14.4 90.4 33.0 0 33.0 3 Pumps 0 -33.0 60.4 -33.0 80.6 -11.6 80.6 14.4 63.1 33.0 0 33.0 Maximum Allowable RPS Power Imbalance Setpoints

% FP  % Imbalance 4 Pumps 0 -35.0 87.3 -35.0 109.4 -11.6 109.4 14.4 90.0 35.0 0 35.0 3 Pumps 0 -35.0 59.6 -35.0 81.7 -11.6 81.7 14.4 62.3 35.0 0 35.0

ONEI-0400-70 Rev 21 Page 9 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints Full Backup Out of

%FP Incore Incore Core 4 Pumps 0 -30.2 -29.6 -30.2 80 -30.2 -29.6 -30.2 90 -26.9 -26.5 -26.9 100 -16.3 -16.3 -16.3 102 -14.2 -14.2 -14.2 102 17.0 16.5 17.0 100 19.1 18.7 19.1 90 29.7 29.3 29.7 80 29.9 29.3 29.9 0 29.9 29.3 29.9 3 Pumps 0.0 -30.2 -29.6 -30.2 61.92 -30.2 -30.2 62.49 -29.6 77.0 -14.2 -14.2 -14.2 77.0 17.0 16.5 17.0 65.42 29.3 64.84 29.9 29.9 0.0 29.9 29.3 29.9

ONEI-0400-70 Rev 21 Page 10 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints Operation vwth 4 RCS Pumps, BOC to EOC

% FP I RPS Trip I Full Incore Alarmn Out of Core Alarm 107.9 -11.56 14.40 107 -12.51 15.36 106 -13.57 16.42 105 -14.64 17.48 104 -15.70 18.54 103 -16.76 19.60 102 -17.82 20.66 -14.16 17.00 -14.16 17.00 101 -18.88 21.73 -15.22 18.06 -15.22 18.06 100 -19.94 22.79 -16.28 19.12 -16.28 19.12 99 -21.01 23.85 -17.34 20.19 -17.34 20.19 98 -22.07 24.91 -18.40 21.25 -18.40 21.25 97 -23.13 25.97 -19.47 22.31 -19.47 22.31 96 -24.19 27.04 -20.53 23.37 -20.53 23.37 95 -25.25 28.10 -21.59 24.43 -21.59 24.43 94 -26.32 29.16 -22.65 25.49 -22.65 25.49 93 -27.38 30.22 -23.71 26.56 -23.71 26.56 92 -28.44 31.28 -24.77 27.62 -24.77 27.62 91 -29.50 32.35 -25.84 28.68 -25.84 28.68 90.38 -30.16 33.00 -26.49 29.34 -26.49 29.34

  • 90 -30.56 33.00 -26.90 29.74 -26.90 29.74

-89 -31.63 33.00 -27.23 29.76 -27.23 29.76 88 -32.69 33.00 -27.55 29.78 -27.55 29.78 87.71 -33.00 33.00 -27.65 29.78 -27.65 29.78 87 -33.00 33.00 -27.88 29.79 -27.88 29.79 86 -33.00 33.00 -28.21 29.81 -28.21 29.81 85 -33.00 33.00 -28.53 29.83 -28.53 29.83 84 -33.00 33.00 -28.86 29.84 -28.86 29.84 83 -33.00 33.00 -29.19 29.86 -29.19 29.86 82 -33.00 33.00 -29.52 29.88 -29.52 29.88 81 -33.00 33.00 -29.84 29.89 -29.84 29.89 80 -33.00 33.00 -30.17 29.91 -30.17 29.91 0 -33.00 33.00 -30.17 29.91 -30.17 29.91

% FP I RPS Trip Full Incore Alarm I Out of Core Alarm ONEI-0400-70 Rev 21 Page 11 of 33 Oconee 3 Cycle 22 Operational Power Imbalance Setpoints Operation with 3 RCS Pumps, BOC to EOC

% FP I RPS Trip I Full Incore Alarm I Out of Core Alarm 80.58 -11.56 14.40 80 -12.17 15.02 79 -13.23 16.08 78 -14.30 17.14 77.0 -15.36 18.20 -14.16 17.00 -14.16 17.00 76 -16.42 19.26 -15.22 18.06 -15.22 18.06 75 -17.48 20.32 -16.28 19.12 -16.28 19.12 74 -18.54 21.39 -17.34 20.19 -17.34 20.19 73 -19.60 22.45 -18.40 21.25 -18.40 21.25 72 -20.67 23.51 -19.47 22.31 -19.47 22.31 71 -21.73 24.57 -20.53 23.37 -20.53 23.37 70 -22.79 25.63 -21.59 2443 -21.59 24.43 69 -23.85 26.70 -22.65 25.49 -22.65 25.49 68 -24,91 27.76 -23.71 26.56 -23.71 26.56

67 -25.98 28.82 -24.77 27.62 -24,77 27.62 66 -27.04 29.88 -25.84 28.68 -25.84 28.68 65 -28.10 30.94 -26.90 29.74 -26.90 29.74 64.84 -28.27 31.11 -27.07 29.91 -27.07 29.91 64 -29.16 32.01 -27.96 29.91 -27.96 29.91 63.06 -30.16 33.00 -28.96 29.91 -28.96 29.91 63 -30.22 33.00 -29.02 29.91 -29.02 29.91 62 -31.29 33.00 -30.08 29.91 -30.08 29.91 61.92 -31.37 33.00 -30.17 29.91 -30.17 29.91 61 -32.35 33.00 -30.17 29.91 -30.17 29.91 60.38 -33.00 33.00 -30.17 29.91 -30.17 29.91 60 -33.00 33.00 -30.17 29.91 -30.17 29.91 0 -33.00 33.00 -30.17 29.91 -30.17 29.91

% FP I RPS Trip Full Incore Alarm I Out of Core Alarm ONEI-0400-70 Rev 21 Page 12 of 33 Oconee 3 Cycle 22 RPS Power Imbalance Setpoints Referred to by TS 3.3.1 Thermal Power Level, %FP 120

(-11.6,107.9) (14.4,107.9)

M2 = -0.942 Ml = 0.942 Acceptable Operation (33.0,90.4)

(-33.0,87.7) (-11.6,80.6): (14.4,80.6) 60 - (33.0,63.1)

(-33.0,60.4)

Acceptable 3 or 4 Pu up Operatioi n 40-

20

, 20-

.* Jf I

-30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 Percent Power Imbalance

( C ONEI-0400.( .ev 21 Page 13 of 33 Oconee 3 Cycle 22 Imbaoince Setpoints for 4 Pump Operation, BOC to EOC 110 100 90 80 70 so CL 60 0~

0 4-0 50 a,

40 30 20 10 0

35 25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

( ONEI-0400-74. ,ev 21 Oconee 3 Cycle 22 Page 14 of 33 Imbalance Setpoints for:3 Pump Operation, BOC to EOC 110 0 100 I

90 80 RPS Trip Setpoint RPS Trip Setpoint ~

I Incore & Outcore Alarm 70 I-0 CL.

60 -I.. Ir 1 U.-

0 C 50 0L 40 30 20 10 0 w

-40 30 -25 -20 -15 -10 -5 9 0 5 10 15 20 25 30 35 40 Percent Axial Imbalance

ONEI-0400-70 Rev 21 Page 15 of 33 Oconee 3 Cycle 22 Operational Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No nop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 261.5 291.7 300 100.0 261.5 289.5 300 90.0 261.5 278.3 300 80.0 261.5 267.2 300 50.0 201.5 233.7 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps -77.0 255.5 285.2 300 75.0 251.5 281.5 300 50.0 201.5 235.2 300 48.0 195.2 231.5 300 15.0 91.5 165.5 300 13.0 76.5 161.5 300 5.0 16.5 93.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

ONEI-0400-70 Rev 21 Page 16 of 33 Oconee 3 Cycle 22 Shutdown Margin Rod Index Setpoints RI Insertion Setpoint RI Withdrawal

%FP No Inop Rod 1 Inop Rod Setpoint 4 Pumps 102.0 224.6 291.7 300 100.0 221.5 289.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300 3 Pumps 77.0 227.4 285.2 300 75.0 221.5 281.5 300 48.0 141.5 231.5 300 13.0 76.5 161.5 300 3.0 1.5 76.5 300 2.8 0.0 74.8 300 0.0 0.0 51.0 300

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 17 of 33 4 Pump Operaton, No Inoperable Rods, BOC to EOC ShtonMar In Sen Operational Alarm Setpoint

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 99.8 24.8 t00 100 61.5 101 100 99.0 24.0 100 100 61.5 100 100 98.2 23.2 100 100 61.5 99 100 97.5 22.5 100 100 61.5 98 100 96.7 21.7 100 100 61.5 97 100 95.9 20.9 100 100 61.5 96 100 95.2 20.2 100 100 61.5 95 100 94.4 19.4 100 100 61.5 94 100 93.6 18.6 100 100 61.5 93 100 92.9 17.9 100 100 61.5 92 100 92.1 17.1 100 100 61.5 91 100 91.3 16.3 100 100 61.5 90 100 90.6 15.6 100 100 61.5 89 100 89.8 14.8 100 100 61.5 88 100 89.0 14.0 100 100 61.5 87 100 88.2 13.2 100 100 61.5 86 100 87.5 12.5 100 100 61.5 85 100 86.7 11.7 100 100 61.5 84 100 85.9 10.9 100 100 61.5 83 100 85.2 10.2 100 100 61.5 82 100 84.4 9.4 100 100 61.5 81 100 83.6 8.6 100 100 61.5 80 100 82.9 7.9 100 100 61.5 79 100 82.1 7.1 100 100 59.5 78 100 81.3 6.3 100 100 57.5 77 100 80.6 5.6 100 100 55.5 76 100 79.8 4.8 100 100 53.5 75 100 79.0 4.0 100 100 51.5 74 100 78.2 3.2 100 100 49.5 73 100 77.5 2.5 100 100 47.5 72 100 76.7 1.7 100 100 45.5 71 100 75.9 0.9 100 100 43.5 70 100 75.2 0.2 100 100 41.5 69.8 100 75.0 0 100 100 41.1 69 100 73.8' 0 100 100 39.5 68 100 72.3 0 Wo 100 37.5 610,0 70.7 0 100 100 35.5 66 100 69.2 0 100 100 33.5 65 100 67.7 0 100 100 31.5 64 100 66.1 0 100 100 29.5 63 100 64.6 0 100 100 27.5 62 100 63.0 0 100 100 25.5 61.8 100 62.7 0 100 100 25.0 61 100 61.5 0 100 99.2 24.2 60 100 60.0 0 100 98.2 23.2 59 100 58.4 0 100 97.2 22.2 58 100 56.9 0 100----96.2 21.2 57 100 55.3 0 100 95.2 20.2 56 100 53.8 0 100 94.2 19.2 55 100 52.3 0 100 93.2 18.2 54 100 50.7 0 100 92.2 17.2 53 100 49.2 0 100 91.2 16.2 52 100 47.7 0 1 90.2 15.2 51 100 46.1 0 100 89.2 14.2 50 100 44.6 0 100 88.2 13.2

% FP CRGP 5 CRGP 6 CRGP7 CRGP5 CRGP6 CRGP7 D Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 18 of 33 4 Pump Operation, No inoperable Rods, BOC to EOC Shutdown Margin Setpoint - Operational Alarm Setpoint

%FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 49 100 43.0 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 100 34.1 0 100 78.8 3.8 43 100 32.2 0 100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99.0 24.0 0 100 63.8 0 37 98.0 23.0 0 100 60.6 0 36 97.1 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25.7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97A 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 -86.4 11.4 0 16- 78.5 3.5 0 ' 84.8 9.8 0 15 7T6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 - 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5 0 0 4 9.0 0 0 9.0 0 - 0 3 1.5 0 0 1.5 _ 0 0 2.8 0 0 0 0 00 2 0 -0 0 0 0 0 1 0 0 0000

_ 0 0 0 0 _ 0 _ _

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7

. Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 19 of 33 3 Pump Operation, No Inoperable Rods, BOC to EOC Shutdown Margin Setd e tiona I Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 77 100 100 27.4 100 100 55.5 76.2 100 100 25.0 100 100 53.9 76 100 99.7 24.7 100 100 53.5 75 100 98.2 23.2 100 100 51.5 74 100 96.8 21.8 100 100 49.5 73 100 95.3 20.3 100 100 47.5 72 100 93.8 18.8 100 100 45.5 71 100 92.3 17.3 100 100 43.5 70 100 90.8 15.8 100 100 41.5 69 100 89.4 14.4 100 100 39.5 68 100 87.9 12.9 100 100 37.5 67 100 86.4 11.4 100 100 35.5 66 100 84.9 9.9 100 100 33.5 65 100 83A 8.4 100 100 31.5 64 100 82.0 7.0 100 100 29.5 63 100 80.5 5.5 100 100 27.5 62 100 79.0 4.0 100 100 25.5 61.8 100 78.6 3.6 100 100 25.0 61 100 77.5 2.5 100 99.2 24.2 60 100 76.0 1.0 100 98.2 23.2 59.3 100 75.0 0 100 97.6 22.6 59 100 74.1 0 100 97.2 22.2 58 100 71.1 0 100 96.2 21.2 57 100 68.2 0 100 95.2 20.2 56 100 65.2 0 100 94.2 19.2 55 100 62.2 0 100 93.2 18.2 54 100 59.3 0 100 92.2 17.2 53 100 56.3 0 100 91.2 16.2 52 100 53.4 0 100 90.2 15.2 51 100 50.4 0 100 89.2 14.2 50 100 47.4 0 100 88.2 13.2 49 100 44.5 0 100 86.7 11.7 48 100 41.5 0 100 85.1 10.1 47 100 39.6 0 100 83.5 8.5 46 100 37.8 0 100 82.0 7.0 45 100 35.9 0 100 80.4 5.4 44 _10 34.1 0 100 78.8 3.8 43 100 32.2 0100 77.2 2.2 42 100 30.4 0 100 75.7 0.7 41.6 100 29.6 0 100 75.0 0 41 100 28.5 0 100 73.2 0 40 100 26.6 0 100 70.1 0 39.1 100 25.0 0 100 _ 67.3 0 39 99.9 24.9 0 100 66.9 0 38 99 24.0 0 100 63.8 0 37 98 23.0 0 1100 60.6 0 _

36 971 22.1 0 100 57.5 0 35 96.2 21.2 0 100 54.3 0 34 95.2 20.2 0 100 51.2 0 33 94.3 19.3 0 100 48.1 0 32 93.4 18.4 0 100 44.9 0 31 92.5 17.5 0 100 41.8 0 30 91.5 16.5 0 100 38.6 0 29 90.6 15.6 0 100 35.5 0 28 89.7 14.7 0 100 32.4 0

%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 20 of 33 Pump Operation, No Ino erable Rods, BOC to EOC ShUtdown Margin Setpoint Opera ional Alarm Setpodnt

% FP CRGP 5 CRGP6 -CRGP7 CRGP5 CRGP6 CRGP7 27 88.8 13.8 0 100 29.2 0 26 87.8 12.8 0 100 26.1 0 25,7 87.5 12.5 0 100 25.0 0 25 86.9 11.9 0 99.0 24.0 0 24 86.0 11.0 0 97.4 22.4 0 23 85.0 10.0 0 95.8 20.8 0 22 84.1 9.1 0 94.2 19.2 0 21 83.2 8.2 0 92.7 17.7 0 20 82.2 7.2 0 91.1 16.1 0 19 81.3 6.3 0 89.5 14.5 0 18 80.4 5.4 0 88.0 13.0 0 17 79.5 4.5 0 86.4 11.4 0 16 78.5 3.5 0 84.8 9.8 0 15 77.6 2.6 0 83.2 8.2 0 14 76.7 1.7 0 79.5 4.5 0 13 75.8 0.8 0 75.8 0.8 0 12.8 75.0 0 0 75.0 0 0 12 69.0 0 0 69.0 0 0 11 61.5 0 0 61.5 0 0 10 54.0 0 0 54.0 0 0 9 46.5 0 0 46.5 0 0 8 39.0 0 0 39.0 0 0 7 31.5 0 0 31.5 0 0 6 24.0 0 0 24.0 0 0 5 16.5 0 0 16.5. 0 0 4 9.0 0 0 9.0 0 0 3 1.5 0 0 1.5 0 0 2.8 0 0 0 0 0 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP 7

_____ Shtvdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 21 of 33 4 Pump Operation, 1 Inoperabfe Rod, BOC to EOC Shutdown Margin spnt Operational Alarm Setpoint

%FP CRGP5' CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 102 100 100 91.7 100 100 91.7 101 100 100 90.6 100 100 90.6 100 100 100 89.5 100 100 89.5 99 100 100 88.4 100 100 88.4 98 100 100 87.3 100 100 87.3 97 100 100 86.2 100 100 86.2 96 100 100 85.0 100 100 85.0 95 100 100 83.9 100 100 83.9 94 100 100 82.8 100 100 82.8 93 100 100 81.7 100 100 81.7 92 100 100 80.6 100 100 80.6 91 100 100 79.5 100 100 79.5 90 100 100 78.3 100 100 78.3 89 100 100 77.2 100 100 77.2 88 100 100 76.1 100 100 76.1 87 100 100 75.0 100 100 75.0 86 100 100 73.9 100 100 73.9 85 100 100 72.8 100 100 72.8 84 100 100 71.7 100 100 71.7 83 100 100 70.5 100 100 70.5 82 100 100 69.4 100 too 69.4 81 100 100 68.3 100 100 68.3 80 100 100 67.2 100 100 67.2 79 100 100 66.1 100 100 66.1 78 100 100 65.0 100 100 65.0 77 100 100 63.8 100 100 63.9 76 100 100 62.7 100 100 62.7 75 100 100 61.6 100 100 61.6 74 100 100 60.5 100 100 60.5 73 100 100 59.4 100 100 59.4 72 100 100 58.3 100 100 58.3 71 100 100 57.2 100 100 57.2 70 100 100 56.0 100 100 56.0

.69 .100 100 54.9 100 100 54.9 68 100 100 53.8 100 100 53.8 67 100 100 52.7 400 100 52.7 66 V 100 100 51.6 100 100 51.6 65 100 100 50.5 100 100 50.5 64 100 100 49.3 100 100 49.3 63 100 100 48.2 100 100 48.2 62 100 100 47.1 100 100 47.1 61 100 100 46.0 100 100 46.0 60 100 100 44.9 100 100 44.9 59 100 100 43.8 100 100 43.8 58 100 100 42.7 100 100 42.7 57 100 100 41.5 100 100 41.5 56 100 100 40.4 100 100 40.4 55 100 100 - 39.3 100 100 39.3 54 100 100 38.2 100 100 38.2 53 100 100 37.1 _, 100 100 37.1 52 100 100 36.0 100 100 36.0 51 100 100 _ 34.8 100 100 34.8 50 100 100 33.7 100 100 33.7 49 100 100 32.6 100 100 32.6 48 100 100 31.5 100 100 31.5

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 22 of 33 4 Pump Operation, II Ioperable Rod, BOC to EOC Shutdown MarginSetpoint Operational Alarm Setpoint

%FP CRGP 5 CRGP6 CRGP 7 CRGPS CRGP 6 CRGP7 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 242 100 992 24.2 43 100 98.2 232 100 98.2 23.2 42 100 97.2 222 100 97.2 22.2 41 100 96.2 212 100 96.2 21.2 40 100 952 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 912 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 132 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 862 11.2 30 100 85.2 10.2 100 85.2 10.2 29 -100 84.2 9.2 100 84.2 9.2 28 100 83.2 8.2 100 83.2 8.2 27 100 82.2 72 100 82.2 7.2 26 100 81.2 6.2 100 81.2 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2 23 100 78.2 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 1.2 20 100 75.2 0.2 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 -63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10- 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 __ 88.5 13.5 0 5 84.2 9.2 _ 0

° 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68.0 0 0 68.0 0 0 1 59.5 0 0 59.5 0 0 0 51 0 _= 51 0 0

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpoint RI = 300 is withdrawal limit at all power levels.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 23 of 33 3 Pump Operation, I Inoperable Rod, BOC to EOC Shutdown Margin SntOpera ional Alarm Setpoint

%FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 77 100 100 85.2 100 100 85.2 76 100 100 83.4 100 100 83.4 75 100 100 81.5 100 100 81.5 74 100 100 79.6 100 100 79.6 73 100 100 77.8 100 100 77.8 72 100 100 75.9 100 100 75.9 71 100 100 74.1 100 100 74.1 70 100 100 72.2 100 100 72.2 69 100 100 70.4 100 100 70.4 68 100 100 68.5 100 100 68.5 67 100 100 66.7 100 100 66.7 66 100 100 64.8 100 100 64.8 65 100 100 63.0 100 100 63.0 64 100 100 61.1 100 100 61.1 63 100 100 59.3 100 100 59.3 62 100 100 57.4 100 100 57.4 61 100 100 55.6 100 100 55.6 60 100 100 53.7 100 100 53.7 59 100 100 51.9 100 100 51.9 58 100 100 50.0 100 100 50.0 57 100 100 48.2 100 100 48.2 56 100 100 46.3 100 100 46.3 55 100 too 44.5 100 100 44.5 54 100 100 42.6 100 100 42.6 53 100 100 40.8 100 100 40.8 52 100 100 38.9 100 100 38.9 51 100 100 37.1 100 100 37.1 50 100 100 35.2 100 100 35.2 49 100 100 33.4 100 100 33.4 48 100 100 31.5 100 100 31.5 47 100 100 29.5 100 100 29.5 46 100 100 27.5 100 100 27.5 45 100 100 25.5 100 100 25.5 44.8 100 100 25.0 100 100 25.0 44 100 99.2 24.2 100 99.2 24.2 43 100 98.2 23.2 100 98.2 23.2 42 100 97.2 22.2 100 97.2 22.2 41 100 96.2 21.2 100 96.2 21.2 40 100 952 20.2 100 95.2 20.2 39 100 94.2 19.2 100 94.2 19.2 38 100 93.2 18.2 100 93.2 18.2 37 100 92.2 17.2 100 92.2 17.2 36 100 91.2 16.2 100 91.2 16.2 35 100 90.2 15.2 100 90.2 15.2 34 100 89.2 14.2 100 89.2 14.2 33 100 88.2 13.2 100 88.2 13.2 32 100 87.2 12.2 100 87.2 12.2 31 100 86.2 11.2 100 86.2 11.2 30 100 85.2 10.2 100 85.2 10.2 29 100 84.2 9.2 100 _ 84.2 9.2 28 100 - 83.2 8.2 100 83.2 8.2 27 100 82.2 7.2 100 82.2 7.2 26 100 81.2 6.2 _ 100 81.2__ 6.2 25 100 80.2 5.2 100 80.2 5.2 24 100 79.2 4.2 100 79.2 4.2

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7 Shutdown Margin Setpoint Operational Alarm Setpolnt RI = 300 is withdrawal limit at all power levels. Continued on next page.

Oconee 3 Cycle 22 ONEI-0400-70 Rev 21 Rod Index Setpoints Page 24 of 33 3 Pump Operation. I Inoperable Rod, BOC to EOC Shutdown Margin Setpolnt Operational Alarm Setpoint

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7 23 100 782 3.2 100 78.2 3.2 22 100 77.2 2.2 100 77.2 2.2 21 100 76.2 1.2 100 76.2 12 20 100 75.2 02 100 75.2 0.2 19.8 100 75.0 0 100 75.0 0 19 100 73.5 0 100 73.5 0 18 100 71.5 0 100 71.5 0 17 100 69.5 0 100 69.5 0 16 100 67.5 0 100 67.5 0 15 100 65.5 0 100 65.5 0 14 100 63.5 0 100 63.5 0 13 100 61.5 0 100 61.5 0 12 100 53.0 0 100 53.0 0 11 100 44.5 0 100 44.5 0 10 100 36.0 0 100 36.0 0 9 100 27.5 0 100 27.5 0 8.7 100 25.0 0 100 25.0 0 8 97.0 22.0 0 97.0 22.0 0 7 92.8 17.8 0 92.8 17.8 0 6 88.5 13.5 0 88.5 13.5 0 5 84.2 92 0 84.2 9.2 0 4 80.0 5.0 0 80.0 5.0 0 3 75.8 0.8 0 75.8 0.8 0 2.8 75.0 0 0 75.0 0 0 2 68.0 0 0 68.0 0 0 1 59.5 0 0 59.5 0 0 0 51 0 0 51 0 0

%FP CRGP 5 CRGP 6 CRGP CRGP5 CRGP 6 CRGP 7

_____ Shutdown arnSepint Operational Alarm Setpoint RI = 300 Iswithdrawal limit at all power levels.

C ( ONEI-0400-70( ;21 IPage 25 of 33.

105 I Ocorie 3 C-cle2 I 5 l'U 100 0 95 I I II I IIII I I III'lR H19 IifL~tIMII IIMINI11II estricted .... 95 Operation 9 90 85 itill . I'.85

.... .I I,1.111 t ll.- I , t81.I 0 80 ]fi75 fil] Il Ht cIIjMM l 70il 75 I HI III I'llfI I atiIn fi65 70Q\

I H il iii I M I it iii~l ii i60 65 ]I H ll -- I-ill im itf55 CL Acceptable 50111 U-60 milliOHILLtion

[Hil Hil, H t Ilu 11145 4)55 111111 I fill HU limi f40

0. I Mll L35 LI. 50

.2 M45 40 35 30 5il 15 2 5 4 5 5 7 5 9 11111 ti le A 25 20 15 10 5

0 1-0 10 20 30 40 50 60 70 80 90 1001I- 0 10 20 30 40 50 60 70 80 90 1001I IGroup 5 I Group 7 Control Rod Position, %WD

(  : .

( ONEI-0400-7( v 21 105 - ----- -

t=ltttt

-j Oconee 3 -Cyle 22  ! L Page 26 of 33 105 lira= Control Rod Positio Stipoints 100 100 m No Inoperable R l Np Flow 95 95 90 90 85 85 80 80 75 75 70 70 65 Unrn~ceptab e 65 Opcaion~ '

60 z 60 55 rITT 55 50 50 fRestridted 45 -Qpeortlon 45 40 40 35 35 30 25 Acceptable Operation ...... II 1111111111.- 30

.- 25

I rmr1m5~r e di 20 p=  ; ;I 20 15 10 10 5 [1 'Group 66II 1 111111 Mw ll IP#

5 5- 15-: 25 35 45 55 65 75 85 95 t 0 I r0 10 20 30 40 50 I Group 5 l I

60 I 70 80 90 100 I I0 10 20 30 40 50 60 I Group 7 70 80 90 100 Control Rod Position, % WD

( ( ONEI-0400-.

Page 27 of 33

,v 21 I O!5 I Oconee 3 Cycle22 I 105 10( 100 il I I I Inoperabe n.. Flow. .od,.4.. .

410 '95 t~~~ ....... ...... ..3..m"mmmxtllll 90 HI I ]I, I .I i II 1* it lil I:FFR 11111 1 11 1 iiltllllllllll 5 w I# 11 I S1 _m tiWl~lilil It I1 1 lIl m S mm I I I Itltlf 11111 I14lMXm.XWmwwX 85 iS llT~iiiiiTllllliiit 80 75 1IIII MR.H*ilil II~llilt t I11111111111l OperaIion U!t

. 07 Li)t ilt -pTa fdh Uncceptable 65 3'5 OperItlon 60 ljil~~~~~~~~~~~~~~~~~ilii11 I 1I 111111111111

'rI +$I11111 1_i@T lli46lllm+

1 I[]4 "

5 .... ....lil lili I llliiiiillllilll tl*lLH P*eLlo t 1111 lllllllli[iii ll 1111111 55 24 50 i1111 ii Il I HH 111111111111111nlllilllllllllll11Illt' lllll1111[I i i r Op n r 8i 45 5 40 11 ---- . I I1St all Illlllllllll 35 ltHlt 1111111 1f [lisflt lllffl _1I 5l L)11lV I i 30 F25

...... .. ,.J h lllltltllhttllX W20 l Hil _iF g llftllum I llltl p15 O Li 5 5 11 5 ' lt 5 5 55 65 75 85 9 m' l [ S]l

_u i 'Illl l llt I~ IM~~llTtTlla, _H __

lLH 401 5

0o I0 10 20 30 40 50 60 70 80 90 100 I0 10 20 30 40 50 60 70 80 90 100 I I Group 5 I Group 7 Control Rod Position, % WD

ONEI-0400-( :v 21

( I Oconee 3 Cycfe 22. II Page 28 of 33 105 100 I Control Rod Position Setpolnts I InoperabfeRoct,3. I'wrM Flow TE g X ZE iiiiittl E

105 100 nll 11111uE 95 E 95 rln mTTm E

90 rlll rrlQl ITrr 90 E

r IIlTlm 85 E nTr mIm 85 e

80 E wrtr iiiiilll 80 rlE g rarT ¢nTr 75 75 E

70 TE zr m IIm Unaccepthble 70 MT rmTmT

,IIIS Iml

'Operation 65 E nlll mr B

60 mr rlllrarr 60 gg 511 CrTFm 1 mr 55 mr ,xr.rTrr TrrT 55 iso I rnTrTr 50 m mrmr 50 E

[(llr mT m 45 rm uTrrur Acceptable 45 E

zm l rrm m 40 1: Fr m lallalil Operation 40 a fflir I rTl imJm 35 Dlill m mmr Ililr rnTv rrilrm 35 R 30 rwr tIrmm 30 tm m

TmTl4+4I mImT Z

I m 25 14 I 25 1i4l fi^lrm iiiiillr E

il 11 ITTTTm 20 m ,,,,,,

11 m llr rm 20 ffl g 15 lll 1l l TTTrT m 15 I iS: f*emtmmu R tlt 10 S rTr iiilBa S m 10 3 m 5 i Group 6 0 0l 5 -15 25 35 45 55 65 75 85 95 A

IL0 10 20 30 40 50 60 I 111i11 70 . 80 1 .......

90 (r I...rrl 100 I 1r111 Io 1II . I 10= 20

.Ir l. rI r I

30 40 I

50 60 70 80 90 100 Group 5 1 I Group 7 l Control Rod Position, % WD

=-

ONEI-0400-70 Rev 21 Page 29 of 33 Oconee 3 Cycle 22 2.0 Core Operating Limits - Not Error Adjusted The data provided on the following pages satisfies a licensing commitment to identify specific parameters before instrumentation uncertainties are incorporated.

References provided in section 1 of this COLR identify the sources for the data which follows.

Information provided In this section should not be used in plant procedures.

Quadrant Power Tilt Limits Referred to by TS 3.2.3 Steady State 1Transient Maximum Core Power Level, %FP 3() - 100 0 - 30 30 - 10'0 0 - 30 0 - 100 Quadrant Power Ti ilt, % 5.69 10.00 9.44 12.00 20.00 Variable Low RCS Pressure Protective Limits Referred to by TS 2.1.1 Core Outl et Pressure Reactor Coolant Outlet Temperature, TF pAsia 3 RCS Pumps 4 RCS Pumps BOO 581.0 578.3 ii 900 590.0 587.3 000 598.9 596.3 2

100 607.9 605.2 2:

200 616.9 614.2 2:

300 625.9 623.2

ONEI-0400-70 Rev 21 Page 30 of 33 Oconee 3 Cycle 22 Axial Power Imbalance Protective Limits Referred to byTS 2.1.1 Not for Plant Use

%FP RPS Operational 4 Pumps 0 -35.0 -42.2 80 -42.2 87.3 -35.0 90 -38.8 100 -26.6 109.4 -11.6 109.4 14.4 100 30.0 90 35.0 42.3 80 41.8 0 35.0 41.8 3 Pumps 0 -35.0 -42.2 59,6 -35.0 77.0 -42.2 81.7 -11i.6 81.7 14.4 77.0 41.8 62.3 35.0 0 35.0 41.8

ONEI-0400-70 Rev 21 Page 31 of 33 Oconee 3 Cycle 22 Rod Index Limits Referred to by TS 3.2.1 l Not for Plant Use Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal

%FP Insertion Limit No Inop Rod I Inop Rod Limit 4 Pumps 102 260 220 288 300 100 260 300 90 260 300 80 260 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300 3 Pumps 77 254 220 280 300 50 200 140 230 300 15 90 75 160 300 5 0 0 75 300

ONEI-0400-70 Rev 21 Page 32 of 33 Oconee 3 Cycle 22 LOCA Limits l Not for Plant Use Core Elevation Feet LOCA LHR kw/ft Limit Versus Bumup Mk-B10 Fuel 0 GWd/mtU 30 GWd/mtU 62 GWdImtU 0.000 15.6 15.6 11.6 2.506 16.5 16.5 11.6 4.264 16.8 16.8 11.6 6.021 17.0 17.0 11.6 7.779 17.0 17.0 11.6 9.536 16.7 16.7 11.6 12.00 15.8 15.8 11.6 Mk-BII Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 16.6 16.6 12.2 2.506 17.5 17.5 12.2 4.264 17.6 17.6 12.2 6.021 17.7 17.7 12.2 7.779 17.6 17.6 12.2 9.536 17.5 17.5 12.2 12.00 16.6 16.6 12.2 WH-177 Fuel 0 GWd/mtU 40 GWd/mtU 62 GWd/mtU 0.000 14.9 14.9 11.0 2.506 15.7 15.7 11.0 4.264 15.8 15.8 11.0 6.021 15.9 15.9 11.0 7.779 15.8 15.8 11.0 9.536 15.7 15.7 11.0 12.00 14.9 14.9 11.0

ONEI-0400-70 Rev 21 Page 33 of 33 Oconee 3 Cycle 22 Instrument uncertainties are not nlauded In the values shortn l 4 RPOperation - Loop Average T=Mp., OF. 3 RC? Opertion - Loop Averge Temp.. F iTcold, 0F Tavg (Ainalytical) Tavg (Analytical) 0.0 <581.0 <581.0 0.1 <581.0 <581.0 0.2 <581.1 <581.0 0.3 <581.1 <581.1 0.4 <581.2 <581.1 0.5 <581.2 <581.1 0.6 <581.2 <581.2 0.7 <581.3 <581.2 0.8 <581.3 <581.2 0.9 <581.3 <581.2

1. <581.4 <581.2 1.1 <581.4 <581.2 1.2 <581.5 <581.3 1.3 <581.5 <581.3 1.4 <581.5 <581.3 1.5 <581.6 <581.3 1.6 <581.6 <581.4 1.7 <581.6 <581.4 1.8 <581.7 <581.4 1.9 <581.7 <581.4 2.0 <581.8 <581.4 2.1 <581.8 <581.5 2.2 <581.8 <581.5 2.3 <581.9 <581.5 2.4 <58129 <581.5 2.5 <582.0 <581.6 2.6 <582.0 <581.6 2.7 <582.0 <581.6 2.8 <582.1 <581.6 2.9- <582.1 <581.6 3- <582<581.7 3.1 <582.2 <581.7 3.3 < <581.7 3.4 <52.3 <581.7 3.5 <5823 <581.8 3.6 <582A. <581.8 3.7. <582.4 <581.8 3.8 <582A <581.8 3.9 <582.5 <581.9 4.0 <582.5 <581.9 4.1 <582.6 <581.9 4.2 <582.6 <581.9 4.3 <582.6 <581.9 4.4 <582.7 <582.0 4.5 <582.7 <582.0 4.6 <582.7 <582.0 4.7 <582.8 <582.0 4.8 <582.8 <582.1 4.9 <582.9 <582.1 50<582.9 <582.1