ML043370116
| ML043370116 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Oconee, Point Beach, Arkansas Nuclear, Surry, Turkey Point, Crystal River, PROJ0693, Crane |
| Issue date: | 11/30/2004 |
| From: | Mallay J B & W Owners Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC:04:068, OG:04:1855 | |
| Download: ML043370116 (2) | |
Text
i.
Duke Energy Company Oconee 1, 2,3 AmerGen Energy Company, LLC TMI-1 Entergy Operations, Inc.
ANO-1 The B&W FirstEnergy Nuclear Operating Company D-B Florida Power Corporation Crystal River 3 Owners Groupl Framatome ANP Working Together to Economically Provide Reliable and Safe Electrical Power November 30, 2004 NRC:04:068 OG:04:1855 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Supporting Materials for Review of BAW-1543(NP), Revision 4, Supplement 5, "Supplement to the Master Integrated Reactor Vessel Surveillance Program" Ref.: 1. Letter, James F. Mallay (Framatome ANP) to Document Control Desk (NRC), "Request for Review and Approval of BAW-1543(NP), Revision 4, Supplement 5, 'Supplement to the Master Integrated Reactor Vessel Surveillance Program'," OG:03:1838, NRC:03:091, December 19, 2003.
Ref.: 2. Letter, James F. Mallay (Framatome ANP) to Document Control Desk (NRC), 'Response to RAI on BAW-1543(NP), Revision 4, Supplement 5, 'Supplement to the Master Integrated Reactor Vessel Surveillance Program'," OG:04:1847, NRC:04:030, July 7, 2004.
On behalf of the B&W Owners Group Reactor Vessel Working Group, Framatome ANP requested the NRC's review and approval for referencing in licensing actions the topical report BAW-1543(NP), Revision 4, Supplement 5, "Supplement to the Master Integrated Reactor Vessel Surveillance Program," (Reference 1).
Our response to a Request for Additional Information was provided in Reference 2. A supplemental request for clarification of the contents of Table VIII of the report was discussed in a telephone call on November 23, 2004. provides a revised Table VIII that clarifies how Oconee Unit 2, Oconee Unit 3 and TMI are meeting the minimum number of capsules to be withdrawn and tested in accordance with ASTM E185-82.
This table completely replaces the table submitted in Reference 1.
We will appreciate your timely review.
Very truly yours James F. Mallay, Director Regulatory Affairs cc:
D. G. Holland B&WOG Reactor Working Vessel Group Project 693 Framatome ANP B&W Owners Group 3315 Old Forest Road Lynchburg, VA 24501 Phone: 434-832-2981 Fax: 434-832-4121
Document Control Desk November 30, 2004 NRC:04:068 OG:04:1855 Page A-1 Attachment I Table VIII. Comparison of the Plant-Specific Surveillance Capsules with ASTM E 185 Requirements ASTM E 185-82 5 Capsule Program Requirement 3 EFPY EOL 1.5 EFPY or or or Fluence Midway 6 EFPY 15 EFPY 1-2 Times EOL Fluence Fluence > 5E18 Between First and or or (Capsule may be Plant ARTNDT = 50°F Third Capsule T/4 EOL Fluence IS EOL Fluence held w/o testing)
Oconee-I F-I/T E-l/T A-l/T C-l/T B-l/NT Oconee-2 C-l/T A-l/T TM12-LGI/T E-I/T A5/T Oconee-3 A-l/T B-I/T LI/T D-l/T CR3 -LG2/T TMI-I E-I/T WI/T CR3-LGl/T C-l/T TM12-LG2/T Crystal River-3 B-I/T C-I/T D-l/T F-l/T A-l/NT ANO-I E-l/T B-I/T A-I/T C-l/T D-l/NT Davis-Besse F-I/T B-/IT A-l/T D-l/T C-I/NT Point Beach-l V-l/T S-l/T T-I/T R-l/T P-l/NT Point Beach-2 V-I/T T-l/T R-l/T S-l/T P-l/NT Surry-I T-l/T W-l/T*
V-l/T X-l/T S,U-R Surry-2 X-l/T W-l/T*
V-l/T Y-l/T S-I/T*;T-R Turkey Point-3 T-I/T V-l/T S-I/T X-l/T U,W-R Turkey Point4 Ti-/T S-I/T X-R V-R U,W-R Legend: I/T = Irradiated and tested I/NT = Irradiated and not tested R = In reactor
- Only dosimetry evaluated.