ML043340188
| ML043340188 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/22/2004 |
| From: | Domonique Malone Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| +sispjld120050824, NEI-99-001, RIS-03-018 | |
| Download: ML043340188 (4) | |
Text
Palisades Nuclear Plant Committed to Nuclear Operated by Nuclear Management Company, LLC October 22, 2004 10 CFR 50, Appendix E U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Revision to Emergency Action Levels Nuclear Management Company, LLC, (NMC) is transmitting for NRC review and approval, revisions to the Palisades Nuclear Plant (PNP) emergency action levels (EALs). This revision implements new EALs based on NEI 99-01, Revision 4, "Methodology for Development of Emergency Action Levels," using the guidance of Regulatory Issue Summary (RIS) 2003-18, Supplement 1, "Use of Nuclear Energy Institute (NEI) 99-01, 'Methodology for Development of Emergency Action Levels,"'
dated July 13, 2004.
The enclosed security EALs are in compliance with NEI 99-01, Revision 4, but are not aligned with the "Order For Interim Safeguards and Security Compensatory Measures for - Palisades Plant," dated February 25, 2002. The PNP response to that Order is dated September 5, 2002. The NRC has indicated that additional security EALs are being developed for threat advisories. If revised security EALs are issued before the enclosed EALs are approved, NMC will provide a supplement to reflect the updated security EALs. NMC intends to remain in compliance with the security EALs in the September 2002 security Order response, as modified by the threat advisories, until the NRC approves new security EALs for PNP.
On July 23, 2004, PNP submitted "Request for Approval of Emergency Action Level Changes." The request was related to a modification that abandoned the failed fuel monitor in place, which affected the fission product barrier EAL. NMC requests that the letter dated July 23, 2004, be withdrawn. The enclosed EAL scheme includes EALs with site-specific methods for detection of failed fuel.
27780 Blue Star Memorial Highway. Covert, Michigan 49043-9530 Telephone: 269.764.2000
Document Control Desk Page 2 The current EAL scheme in use at Palisades is based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
This request contains the following enclosures: : Table of Contents : Summary Explanation : State/Local Government Official Agreement Documentatioh : Detailed Supporting Information : Compact disk of Enclosures, References, and Supporting Documentation These proposed EALs have been discussed and agreed to by applicable state and local government officials, and have been reviewed and approved by the Plant Review Committee.
It is-requested that the enclosed EAL revision be approved by November 1, 2005.
Summary of Commitments This letter contains one new commitment and no revisions to existing commitments.
The new commitment is:
If revised security EALs are issued before the enclosed EALs are approved, NMC will provide a supplement to reflect the updated security EALs.
Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (5)
CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC (w/o encl.)
Spent Fuel Project Office, USNRC (w/o encl.)
ENCLOSURE 1 TABLE OF CONTENTS contains the Summary Explanation, or Executive Summary. contains the State and Local Government Official Agreement Documentation. contains the Detailed Supporting Information and is divided into four attachments: : Red-line of the Technical Basis Document : Clean copy of the Technical Basis Document : Justification Matrix : Emergency Plan Changes contains two compact disks of enclosures, references and supporting documentation.
Page 1 of 1