ML043230407
| ML043230407 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/10/2004 |
| From: | Danni Smith Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 035-00729-DMS | |
| Download: ML043230407 (4) | |
Text
I Law A suebsidiarv ofPinacle 1i'st Capital Corporation Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.
623-393-6116 Fax.
623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 November 10, 2004 035-00729-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for OCTOBER 2004 Enclosed are the Monthly Operating Reports for OCTOBER 2004, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
S' crey DMS/ap
Enclosures:
OCTOBER 2004 Monthly Operating Reports cc:
(all w/enclosures)
Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
,, I ,-'
4
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-528 Palo Verde I November 10, 2004 Don Vogt (623)393-5926 October 2004
- 1. Design Electrical Rating
- 2.
MaxImum Dependable Capacity (MWe-Net) 1,265.00 1,243.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On4ine
- 6.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 898,363.35 Yr-to-Date Cumulative 6,262.30 129,044.22 6,206.67 127,595.70 0.00 0.00 7,466,850.11 153,722,540.45 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason 1 Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Began month in Model. RX poweratfull power. Ended month in Model. RX poweratfull power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriptScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-529 Palo Verde 2 November 10,2004 Don Vogt (623)393-5926 REPORTING PERIOD:
October 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity MWe-Net) 1,354.00 1,335.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-lne
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 968,921.24 Yr-to-Date Cumulative 6,716.41 127,505.67 6,676.28 126,065.80 0.00 0.00 8,743,463.72 154,131,556.59 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reasn I Shutting Cause & Corrective Action S: Scheduled lHours)
Down 2 Comments
SUMMARY
- The Design Electrical Rating (DER) and the Maximum Dependable Capacity (MDC) reflect the power uprate performed in 2003. These are interim values. Official values approved by station owners will be effective on 12101104.Began month in Mode 1, RX power at full power. Ended month in Mode 1. RX power at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & Ucense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-530 Palo Verde 3 November 10. 2004 Don Vogt (623)393-5926 October 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity(MWe-Net) 1,269.00 1,247.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On4ine
- 6.
Reserve Shutdown Hours
- 6.
Net Electrical EnergyGenerated (MWHrs)
This Month 24.02 24.02 0.00 25,677.38 Yr-to-Date Cumulative 6,216.05 124,179.35 6,133.85 123.045.22 0.00 0.00 7,577,059.64 150,638,927.66 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason 1 Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments 04-04 10/02/2004 S
719.98 C
1 Manually tripped the RX for U3R11
SUMMARY
Began month in Mode 1. RX power at full power. Manually tripped RX on 10/02104 @ 00:01 to begin U3R1 1 (Entered mode 3). On 10/02104 @107:35 entered mode 4. On 10/02104 @ 18:02 entered mode 5 On 10105104 @22:01 entered mode 6. On 10/13/04 @ 04:07 Unit 3 is defueled. Ended month with RX defueled.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TripiScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1