October 2004 Monthly Operating Report for Watts Bar Nuclear Plant
ML043200547
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/10/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043200547 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 NOV 1 0 2004 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In the Matter of Tennessee Valley Authority

)

Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -

OCTOBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for October 2004 as required by WBN Technical Specification Section 5.9.4.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, g P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -

October 2004 cc:

See page 2

aq Pnn2d onr-Cdpaw

U.S. Nuclear Regulatory Commission Page 2 NOV 10 2004 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. R. J. Pascarelli, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. C. P. Patel, Project Manager U.S. Nuclear Regulatory Commission MS 08H12 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT October 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

50-390 Unit Name:

WBN Unit 1 Date:

November 3, 2004 Completed By:

Patrick Salkeld Telephone:

(423) 365-3635 Reporting Period:

October 2004

1. Design Electrical Rating (MANe-Net):
2.

Maximum Dependable Capacity (MWe-Net):

3.

4.

5.

6.

Number of Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MNVlI) 1,155 1,121 Month 745 745 0.00 846,240 Year-to-Date 7,240 7,216 0.00 8,165,179 Cumulative 68,003 67,668 0.00 75,180,862 E-2

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 November 3, 2004 Patrick Salkeld (423) 365-3635 REPORT PERIOD: October 2004 No ae 'ye uain Rao 2

M to iese Sse omponent:.C:::,::.iuse and Core.t.e.cti..t (Hours)o..Even...de..od...Prvent:Recurrence, Shtting Report. No.

D...........

n....

R e................cto r...................

3 N/A

/A./ANA.NA.N/.N/.N/

N/A..Unit.1 opraedatorner10.prcntpoe for.the.etire.monh of.Octber.2004 1F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Mcthod 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

Summary:

Unit I operated at or near 100 percent power for the entire month of October 2004.

E-3