ML043100167

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Licensee Performance and Planned Activities as Part of the Mc 0350 Action Matrix Column 4 Process at Perry
ML043100167
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/03/2004
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML043100167 (4)


Text

November 3, 2004 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE OCTOBER 28, 2004, PUBLIC MEETING TO DISCUSS LICENSEE PERFORMANCE AND PLANNED ACTIVITIES AS PART OF THE MANUAL CHAPTER 0305 ACTION MATRIX COLUMN 4 PROCESS On October 28, 2004, the Nuclear Regulatory Commission (NRC) held a public meeting at the Quail Hollow Resort in Painesville, Ohio. The meeting was between the NRC Region III Management and FirstEnergy Nuclear Operating Company (FENOC) to discuss licensee performance and planned activities as part of the Manual Chapter 0305 Action Matrix Column 4 process at the Perry Nuclear Power Plant. The letter of notification, meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML042780120, ML042780126, ML043010358, and ML043090198 respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure. Agenda topics included an overview of the NRCs Reactor Oversight Process/ Action Matrix, a discussion of the Perry Improvement Initiative (ML042800555), and a discussion of Inspection Procedure 95003.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated cc w/encl: G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC F. von Ahn, Plant Manager, Nuclear Power Plant Department W. OMalley, Manager, Maintenance Department J. Lausberg, Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

DOCUMENT NAME: E:\Filenet\ML043100167.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME GRoach:dtp CLipa DATE 11/03/04 11/03/04 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company ADAMS Distribution:

GYS DFT SPS1 RidsNrrDipmIipb GEG HBC RJP DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC J. Caldwell, Regional Administrator, RIII S. Reynolds, Acting Division Director, DRP, RIII J. Jolicoeur, RIII EDO Coordinator, OEDO C. Lipa, Branch Chief, DRP, RIII M. Ring, Branch Chief, DRP, RIII S. Sands, Project Manager, NRR R. Powell, Senior Resident Inspector, Perry J. Ellegood, Resident Inspector, Perry J. Strasma, Public Affairs, RIII R. Lickus, State Liaison, RIII FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer, FENOC F. von Ahn, Director Site Operations, Perry J. Messina, Director, Performance Improvement, Perry T. Lentz, Director, Nuclear Engineering Department, Perry N. Bonner, Manager, Nuclear Quality Assessment, Perry