November 3, 2004 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - BRUNSWICK STEAM ELECTRIC PLANT
Dear Mr. Gannon:
During a conversation on November 2, 2004, Mr. Edwin Lea, NRC Senior Operations Engineer, and Mr. Tony Pearson, Brunswick Supervisor of Operations Requalification Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Brunswick Steam Electric Plant. The inspection is planned for the week of November 29, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In order to adequately conduct this inspection, the NRC has asked that your staff provide documentation associated with the implementation of your requalification program as described in 10 CFR 55.59(c). The documentation will be reviewed the week of the inspection.
Mr. Pearson has been informed of the documentation request.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
2 CP&L Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Pearson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Edwin Lea at (404) 562-4567 or me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62
Enclosure:
List of Items Requested cc w/encl: (See next page)
3 CP&L cc w/encl:
T. P. Cleary, Director Site Operations Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution David H. Hinds Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company Electronic Mail Distribution Edward T. O'Neil, Manager Support Services Carolina Power & Light Company Brunswick Steam Electric Plant Electronic Mail Distribution Lenny Beller, Supervisor Licensing/Regulatory Programs Carolina Power and Light Company Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 David R. Sandifer Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402-1525 Jackie Gawron Training Manager Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429
4 CP&L Distribution w/encl:
B. Mozafari, NRR R. Franovich, NRR (Regulatory Conferences Only)
C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE
/RA By JMoorman for/
/RA/
/RA/
NAME ELea:pmd JMoorman PFredrickson DATE 11/3/04 11/3/04 11/3/04 11/ /2004 11/ /2004 11/ /2004 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\\Filenet\\ML043090004.wpd
Enclosure List of Items Requested 1.
Written exam results since the last requal inspection.
2.
Exam scenarios given since the last requal inspection.
3.
Remedial training given as a result of requal written exam and/or operating test failures.
4.
A copy of the last biennial requal written examination (2 RO/SRO exams).
5.
List of personnel scheduled for requal testing during the inspection week.
6.
Copies of simulator scenarios for this requal exam.
7.
Program evaluation for the previous 2 years training cycle.
- 8.
A list of all personnel that reactivated their licenses since the last requal inspection.
9.
List of all open simulator discrepancies. (DR's) 10.
Copy of the Simulator Management and Configuration Procedures.
11.
List of all closed simulator DR's for last 12 months.
12.
List of Simulator Performance tests.