L R
Scott A. Bauer Department Leader Regulatory Affairs Palo Verde Nuclear Generating Station Tel: 623/393-5978 Fax: 623/393-5442 e-mail: sbauer~apsc.com TRM T5.0.600.2.c Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 102-05161 -SAB/TNW/JAP October 15, 2004 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
- 1) Letter 102-05071-SAB/TNW/JAP, "Unit 2, Cycle 12 Startup Report,"
from Scott A. Bauer, APS to USNRC, dated March 11, 2004
- 2) Letter 102-05111 -SABITNW/JAP, Unit 2, Cycle 12 Startup Report -
Supplement 1," from Scott A. Bauer, APS to USNRC, dated June 11, 2004
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Unit 2, Cycle 12 Startup Report - Supplement 2
Dear Sirs:
As required by the PVNGS Technical Requirements Manual (TRM), Arizona Public Service Company (APS) is submitting this supplemental report to the PVNGS Unit 2, Cycle 12 Startup Report (Reference 1). TRM T5.0.600.2.c requires that supplemental reports be submitted at least every 3 months until all testing has been completed. At the time that Unit 2, Cycle 12 Startup Report (Reference 1) was initially submitted, two tests had not yet been performed. Those two tests were 1) steam generator moisture carryover and, 2) steam generator blowdown piping vibration measurement. As reported in Reference 2, the remaining portions of the Steady State Vibration Testing for Unit 2 were completed on May 20, 2004. The Steam Generator Moisture Carryover Test, remains to be completed. A subsequent report will be provided when this testing is completed.
No commitments are being made to the NRC by this letter.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
-- U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Unit 2, Cycle 12 Startup Report-Supplement 1 Page 2 If you have any questions, please contact Thomas N. Weber at (623) 393-5764.
Sincerely, At~
SAB/TNW/JAP/kg cc:
B. S. Mallet M. B. Fields N. L. Salgado NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS