Indian Point Unit 3 Stretch Power UDrate License Amendment Request NRC - Entergy Review Meeting September 14, 2004
- Enh.rgy
A zYeN ad
Introductions
- 1.
Meeting Objective
- 2.
Key Perspectives
- 3.
Project Objectives
- 4.
NRC Requested Approvals
- 5.
Tech Spec and Bases Changes
- 6.
IP2 & IP3 Summary Comparison Licensed Core Power Key IP2 and IP3 NSSS Analyses Inputs Key IP2 and IP3 NSSS Analyses Methodology Changes Key IP2 and IP3 NSSS Analyses Results BOP Summary Operational Comparison System/Equipment Considerations Comparison Reliability & Efficiency Improvements Comparison Summary of Modifications
- 7.
Feedback/Questions & Answers AE:Entergy
Meeting Obj ective Support NRC efforts to review and approve the Indian Point Unit 3 Stretch Power Uprate LAR by March 2005 - prior to start of the 3R13 Refueling Outage.
Entergy
Key Perspectives
- Licensed "Stretch" increase of 4.85% to 3216 MWt.
- Licensed core power will be no greater than the original maximum calculated reactor power.
- Format, content, and methodologies very similar to separate IP2 SPU submittal.
- Incorporated IP2 SPU lessons learned and NRC Feedback.
- Took a "Defense in Depth" approach to quality measures.
- Design and licensing bases acceptance criteria remain the same and continue to be met for IP3 systems, components, and safety analyses.
- No Significant Hazards per 10CFR50.92.
=Entergy
Proj ect O)j ectives
- Safely support and implement a
/4% increase in the licensed core thermal power for IP3 at the start of Cycle 14 (Phase 1).
- Support Entergy' s strategy of providing much-needed additional electricity to the Northeast Region, particularly Metropolitan New York City.
'Entera
NRC Requested Approvals Stretch Power Uprate
- 3216 MWt Licensed Core Power
- 10-Minute Operator Action
- Associated Tech Specs
- No New NRC Licensing Commitments Alternate Source Term
- Associated Tech Specs
- Methodology and Assumptions
- Dose Limits
=Entergy
SPU Tech Spec and Bases Changes
- RCS Minimum Flow
- Pressurizer Water Level Limit
- Power Limit for Inoperable MSSVs
- ILRT Pressure Limit
- Entergy
1P2 & 1P3 Summary Comparison
-Licensed Core Power
-NSSS Analyses Inputs
-NSSS Analyses Methodology
-NSSS Analyses Results
-BOP Summary
-Operational Comparison
-System/Equipment Considerations Comparison
-Reliability & Efficiency Improvements Comparison
-Summary of Modifications DEntergy
Licensed Core Po wer IP2 Stretch IP3 Stretch
- MWt: 3 114.4 to 3216
- MWt: 3067.4 to 3216
>Phase I -A4%
> Phase II -0.85%
-Entergy
P2 and 1P3 NS SS Inputs IP2 IP3 Parameter Current Value SPU Value Current Value SPU Value Licensed Reactor Thermal 3114.4 MWt 3216 MWt 3067.4 MWt 3216 MWt Power Power Calorimetric 0.6%
2.0%
0.6%
2.0%
Uncertainty Reactor Vessel Tavg 549.40F - 579.20F 549.0F - 572.0F 5670F - 574.70F 549.0F - 572.0F Analysis Range Actual Full-Power 562°F +30F 562°F +30F 567°F 567°F + 3°F Programmed Tavg F
F Assumed Maximum SG Tube 20%
10%
30%
10%
Plugging Maximum Steam Flow 13.48E06 - 13.56E06 14.01E06 - 14.07E06 13.24E06 13.14E06-13.99E06 (lbm/hr)
ITS RWST Boron Concentration 2000ppm - 2500ppm 2400ppm - 2600ppm 2400ppm - 2600ppm 2400ppm - 2600ppm En tfergy
1P2 and IP3 Analyses Methodology Changes
SUMMARY
- OF -NSSS METHODS AN-IPUTS IP2
[P3 Analysis Current SPU Current SPU Non-LOCA Transient Code LOFTRAN RETRAN/
LOFTRAN LOFTRAN BELBOA oe ApoahWCOBRA-WCOBRA-WCOBRA-WCOBRA-BE LBLOCA Code Approach TRAC Anal.
TRAC Eval.
TRAC Anal.
TRAC Anal.
SBLOCA Evaluation Model EM EM + COSI EM EM + COSI Operator Action for LONF/LOAC Not Credited 10 Minutes Not Credited 10 Minutes Containment Peak Pressure - LOCA Coco coco coco coco Containment Peak Pressure - MSLB COCo COCo COCO COCO HLSO Time Generic Specific Specific Specific AST Draft AST Final Misc. Reg.
AST Final Radiological Dose Analysis RG 1081 RG113 Guides (e.g.
R
.8
_I_
"'Plus" RG___ 1__183 1.4, 1.25, 1.77)
RG__ _1_183
~--En tergy
IP2 and IP3 Analyses Results SUMM:ARY-OF-NSSS ANALYSES RESULTS';
IP2 IP3 Analysis Current SPU Current SPU BE LBLOCA 2176°F PCT 2137°F PCT 2174°F 2014°F PCT SBLOCA 2116°F PCT 1028°F PCT 1526°F 1543F PCT Operator Action for LONF/LOAC NO PRZR FILL NO PRZR FILL NO PRZR FILL NO PRZR FILL Containment Peak Pressure - LOCA 43.0 psig 45.7 psig 38.77 psig 42.0 psig Containment Peak Pressure - MSLB 46.7 psig 38.9 psig 42.1 psig 39.2 psig HLSO Time 24 Hrs 6.5 Hrs 14 Hrs 6.5 Hrs
< Thyroid and Radiological Dose Analysis
< TEDE Limits
< TEDE Limits Whole-Body Dose
< TEDE Limits
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _L im its_
E t
--- En tegy
Operational Comparison IP2 Stretch Uprate IP3 Stretch Uprate
- Restored 2% power uncertainty to analyses for improved safety and operational margin.
- Hot Leg Safety Injection switch over completion time from 24 to 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
(EOPs)
- 10 Minute Operator Action for AFW Flow
- Same
- Start HLSO at 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />, complete by 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> - to start at 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, complete at 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
- Same Entergy
BOP Summary
- The initial NRC questions and NRC RAIs on the IP2 SPU submittal were considered when preparing the IP3 SPU LAR.
- Strengthened the Acceptance Criteria, Design Criteria and Results/Conclusions sections of the IP3 LAR.
- The Piping Vibration Plan for IP3 will be similar to that used for 1P2.
--En tergy
System/Equipment Considerations Comparison 1P2 Stretch Uprate
- Components were added to Flow Accelerated Corrosion (FAC) program.
- Power uprate had no appreciable affect on EQ program.
- Main Feedwater Block valves (BFD-5's) were added to MOV program to take credit for closure on feedwater isolation.
- SI System analysis addressed the recirculation sump particle criteria and system throttle valve cavitation issues for the as-set system conditions.
IP3 Stretch Uprate
- Same
- Same
- HHSI modifications are being implemented Entergy
Reliability &WEfficiency Improvements Comparison IP2 Stretch Uprate IP3 Stretch Uprate
- HP Turbine
- Same upgrade to HP Turbine
- Same upgrade to MSRs
- Moisture Separator Reheater Internals changed to chevron design
- Iso Phase Bus Duct cooling upgrade Main Power
- Transformer Monitoring
- Phase 2 only
- Similar modifications planned A-Entergy
Summary of Modifications IP2
- HPT Steam Path
- Moisture Separator Reheater Internals
- Main Power Transformer Monitoring
- Setpoint / Instrument Changes
- Iso Phase Bus Duct Cooling
- MW Meter Replacement
- HPT Steam Path
- Moisture Separator Reheater Internals
- Main Power Transformer Monitoring
- Setpoint / Instrument Changes
- HHSI flow balancing
- CCR Charcoal Filter Upgrade
Feedback RAI Process Discussion Questions and Answers