Palo Verde Nuclear Generating Station Augmented Team Inspection Briefing June 16, 2004 0700 MST Plant Status Nancy Salgado - Senior Resident Inspector Charter Assignments Tony Gody - Team Leader/Offsite & Grid Lead Chuck Paulk - Unit 2 Lead Tim McConnell - Unit 1 and 3 Lead Peter Alter - Emergency Response/Security Lead Tom Koshy - Grid Reliability Expert George Skinner - Technical Expert Preliminary Assessment of Initiating Event GDC 17 and Technical Specification Considerations Note: Any phase imbalance above the trip threshold sensed in the switchyard will result in the PV 1, PV 2, and PV 3 transmission lines isolating. This results in isolation of Hassayampa substation from the Palo Verde Switchyard.
This design problem is a restart issue being evaluated by the licensee.
oo4 1 QJ R
/6ot
(>JAJ.