Palo Verde Nuclear Generating Station Augmented Team Inspection Briefing June 16, 2004 0700 MST

  • Plant Status
  • Charter Assignments
  • Chuck Paulk - Unit 2 Lead
  • Tim McConnell - Unit 1 and 3 Lead
  • Peter Alter - Emergency Response/Security Lead
  • Tom Koshy - Grid Reliability Expert
  • George Skinner - Technical Expert
  • Preliminary Assessment of Initiating Event
  • GDC 17 and Technical Specification Considerations
  • Note: Any phase imbalance above the trip threshold sensed in the switchyard will result in the PV 1, PV 2, and PV 3 transmission lines isolating. This results in isolation of Hassayampa substation from the Palo Verde Switchyard.
  • This design problem is a restart issue being evaluated by the licensee.