Nuclear Regulatory Commission Augmented Inspection Team Exit Meeting with Palo Verde Nuclear Generation Station

I. I C.

Inspection Charter

  • Basis of Augmented Inspection
  • Develop a complete sequence of events
  • Assess performance of plant systems
  • . Assess adequacy of plant procedures

.T 777- 1.

-I  ; N. I-i I t : ".11 , ,

I - -, - - -- -- MF*.Wfm Inspection Charter

    • Assess facility response to event
  • Assess facilities determination of apparent cause

+.*Assess maintenance related contributions

I ...rV7 i ',T -a' -.

110.df ' 4 mv-.

bm -~ '1gs Inspection Charter

  • . Assess facility coordination of offsite activities
    • Overall risk assessment of event

I-s -

SEQUENCE OF EVENTS

  • Fault Initiation
  • . Electrical Transmission and Grid
  • - ge i * *s SEQUENCE OF EVENTS
  • +Other Challenges

A-N PERFORMANCE OF PLANT SYSTEMS

  • .*Transmission system protection
  • .*All three reactors were safely shut down
  • Each unit was stabilized by operators

I me- Er t:'1..Si'4

's..1-.-, ;;',pt;saC%1/4lT.'C- *.c.7 *..,-

2.2S- 2 PERFORMANCE OF PLANT SYSTEMS

  • .+.Otherminor equipment problems noted during shutdown

71"'

V ft W-MNM Mg~

Plant Procedures

  • .Procedures used during event were generally acceptable
    • Some issues noted
MMW Facility Response
  • Conduct of operations generally good
  • .Emergency response organization challenges
  • Some other problems noted by the team

'V *A,jS *.'.' *. .$A';f...S7VT. -r:rrrv'-rv '9, Vt -

4 s.'?, *y-,.t'V't j7:;ji Apparent Causes

-. Electrical fault isolation failure

  • + Transmission lines between Hassayampa and Palo Verde switchyard

+:+Technical Support Center Emergency Diesel Generator failure

    • Others

Maintenance Related Aspects

  • Maintenance of switchyard and substation equipment good
  • .Implementation of facility maintenance processes

- ...... A.C SUEDAMINOs Off-Site Coordination

  • .Good coordination of actions following event
  • t Unrecognized design issue with Hassayampa to Palo Verde transmission line protection

Overall Risk Assessment

    • Given the loss of approximately 5,500 MWe of electrical generation, the grid performed well
  • Electrical power was restored in a timely*

manner

ptn

~.~/ P S ~2~~i 2

T.,;4~ ~ *~ 22 2 Overall Risk Assessment

    • All three units were stabilized and placed in a safe shutdown mode of operation