E-mail from Don Straka to Anthony Goody, Subject: FW: AIT RFIs from Paulk
ML042960342
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/25/2004
From: Straka D
Arizona Public Service Co
To: Gody A
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0307
Download: ML042960342 (2)


Text

From:

<DSTRAKA@apNc.c9M> 4 r2t Ko To:

<atg~nrc.gov>W<rha od Date:

6/25/04 11:51AM

Subject:

FW: AIT RFIs from Paulk Tony:

Please pass to Chuck Paulk.

SBCS configuration and Modifications, installation dates shown in RED month/year.

Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240

> -Original Message--

> From:

Barbera, Steven J(Z99626)

> Sent:

Thursday, June 24, 2004 3:52 PM

> To:

Straka, Donald J(Z99942); Hypse, Mark L(V53307); Anderson, Gary

> T(Z02256)

> Cc: Hodge, Michael F(Z48290); Taylor, James T(Z94098)

Subject:

RE: AIT RFIs from Paulk

> Don,

  • > I am assuming you are talking about NNND1I and NNNDI2 when you are

> talking about SBC power.

> 1. The NORMAL power source at NNNDII (D12) has always been from NHNM13

> (Ml 0) and the EMERGENCY from PHAM31 (M32). At one time there was

> confusion as to which source was more reliable and the units were

> aligning the panels differently. Some were units had the ABT aligned

> to the Emergency source while others were aligned to the Normal. After

> the "Ring-Tailed cat" event in Unit 1 we decided to replace the

> switches and to align them to the Normal source since PVNGS had

> experienced several loss of off-site power events to either S05 or

> S06.

> 2. The sources remained the same but the alignment changed. The Normal

> source was now the preferred source and the Emergency was the back-up.

> This change came out of the ring-tailed cat event in Unit 1.

> 3. All the NNND1I and D12 switches have been replaced under DMWO

> 740601.

> 1 ENNNDI1 DIWO 740602 03/98

> 1ENNND12 DIWO 740603 03/98

> 2ENNND11 DIWO 740604 09/97

  • 2ENNND12 DIWO 740605 09/97
  • 3ENNND1 I DIWO 740606 03/97
  • 3ENNND12 DIWO 740607 03/97

> -Original Message----

> From:

Straka, Donald J(Z99942)

> Sent:

Thursday, June 24, 2004 12:52 PM

> To: Hypse, Mark L(V53307); Anderson, Gary T(Z02256); Barbera, Steven

> J(Z99626)

> Cc: Hodge, Michael F(Z48290); Taylor, James T(Z94098)

Subject:

AIT RFls from Paulk

> 1. In the original (initial) plant configuration what were the power

> sources for Steam Bypass Control for the preferred (non-vital) power

> to alternate, and was the alternate power source vital (class) or

> another non-vital bus?

> 2. Under the Plant mod, the SBCS was changed from ABTs to static

> switches, were the power sources for the preferred and the alternate

> changed as well?

> 3. Are all three Units SBCS configurations the same, provided dates

> when the SBCS ABTs/static switches were installed in all three units?

> Regards,

> Don Straka

> Senior Consultant - Regulatory Affairs

> dstraka~apsc.com

> phone: 623.393.5041

> pager: 602.509.6240

> mobile: 602.509.6240 CC:

<MHODGE@apsc.com>, <SBARBEO1@apsc.com>, <MHYPSE@apsc.com>