ML042960340
| ML042960340 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/24/2004 |
| From: | Straka D Arizona Public Service Co |
| To: | Gody A Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960340 (1) | |
Text
From:
<DSTRAKA@aps.c
>cor To:
<atg~nrc.govi Date:
6/24/04 11:27AM U
U
Subject:
FW: DRAFT Integrated Timeline of Three Unit LOOP on 6/14/04 -As requested by NRC on 6/24/04 Tony:
Enclosed is our most current revision of the time line.
Side note: Katie Clifton provided John Mateychick a large package of information including graphs that should help answer the Borg-Warner Check Valve questions.
- Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240
> -Original Message--
> From:
McDowell, James P(Z98774)
> Sent:
Thursday, June 24, 2004 9:14 AM
> To: Straka, Donald J(Z99942)
> Cc: Taylor, James T(Z94098)
Subject:
DRAFT Integrated Timeline of Three Unit LOOP on 6/14/04
> -As requested by NRC on 6/24/04
> <<<SOE FLowchartA1.pdf>>
CC:
<MHODGE@apsc.com>, <JTAYLO01@apsc.com>, <DAOAKES@apsc.com>,
<MWINSOR@apsc.com>, <MBRUTCHE@apsc.com>, <TBRADISH@apsc.com>,
<KCLIFTON@apsc.com>