Third Amended Supplemental Response to the April 29. 2003 Orders to Nine Mile Point Nuclear Station. LLC
ML042930619
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/15/2004
From: Spina J
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086, NMP1L 1873
Download: ML042930619 (5)


Text

SAFEGUARDS INFORMATION James A. Spina P.O. Box 63 Vice President - Nine Mile Point Lycoming, NY 13093 Constellation Energy October 15, 2004 NMP1L 1873 Docket Nos: 50-220 50-410 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Third Amended Supplemental Response to the April 29. 2003 Orders to Nine Mile Point Nuclear Station. LLC The Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003, requiring compliance with Revised Design Basis Threat ("Order EA-03-086" or "Order") and other security related Orders (collectively "Orders") for Nine Mile Point Nuclear Station, Units 1 and

2. By letter dated April 28, 2004 (Reference a), Nine Mile Point Nuclear Station, LLC

("NMPNS"), submitted its Supplemental Response to Order EA-03-086. The Supplemental Response included, as Attachment A, revisions to the NMPNS Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan, as required by the Order.

On September 9, 2004, NMPNS submitted an Amended Supplemental Response (Reference b) that included revisions to the security plans. The revised plans incorporated our responses to several Requests for Additional Information ("RAIs") received from the NRC subsequent to the submittal of the original Supplemental Response.

On September 30,2004, NMPNS submitted a Second Amended Supplemental Response (Reference c) to incorporate additional security plan changes requested by the NRC Security Plan Review Team, as well changes requested in correspondence from Mr. S.A. Morris of the NRC's Office of Nuclear Security and Incident Response (Reference d) regarding security enhancements in the owner controlled area.

This Third Amended Supplemental Response is being submitted to incorporate final security plan changes requested by Mr. Brian Benney and Mr. James Creed of the NRC Security Plan Review Team in telephone conversations with representatives of NMPNS on October 11, 2004.

NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION FROM THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

Document Control Desk October 15, 2004 Page 2 Our supplemental responses of April 28th, September 9th, and September 30th are amended via the enclosure to this letter only. All other information provided in those supplemental responses remains unchanged and is unaffected by this Amendment.

The enclosure includes a CD-ROM containing the revised security plans formatted in pdf, as well as a summary of the changes. Should you have any questions on this matter, we would be pleased to discuss them with you.

Very truly yours, ames A. Spina STATE OF NEW YORK TO WIT:

COUNTY OF OSWVEGO I, James A. Spina, being duly sworn, state that I am Vice President Nine Mile Point, and that I am duly authorized to execute and file this response on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

JasA. Spina

>)Ace President Nine Mile Point Subscribed and sworn before me, a Notary Public in and for the State of New York and County of Oswego, this / S'day of o cod~e..i

,2004.

WITNESS my Hand and Notarial Seal:

gt Z/

C9 Notary Public My Commission Expires:

ID 16q Date SANDRA A. OSWALD Notary Public, State of New York No. 010S6032276 Qualified In Oswego County Commission Expires 1r/1zecS

Document Control Desk October 15, 2004 Page 3

REFERENCES:

(a) Letter from J.A. Spina (NMPNS) to Document Control Desk (NRC), dated April 28, 2004, Supplemental Response to the April 29, 2003 Orders to Nine Mile Point Nuclear Station, LLC (b) Letter from T.J. O'Connor (NMPNS) to Document Control Desk (NRC), dated September 9, 2004, Amended Supplemental Response to the April 29, 2003 Orders to Nine Mile Point Nuclear Station, LLC (c) Letter from J.A. Spina (NMPNS) to Document Control Desk (NRC), dated September 30, 2004, Second Amended Supplemental Response to the April 29, 2003 Orders to Nine Mile Point Nuclear Station, LLC (d) Letter from S.A. Morris, NRC Office of Nuclear Security and Incident Response, to J.A.

Spina (NMPNS), dated September 21, 2004, Re: Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response

Document Control Desk October 15, 2004 Page 4 cc: (without enclosure)

Mr. James E. Dyer Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 05-E-07 Washington, DC 20555 Mr. Roy P. Zimmerman Director, Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, DC 20555 Gordon K. Hunegs Senior Resident Inspector - Nine Mile Point U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Mr. Peter S. Tam Senior Project Manager, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Samuel J. Collins Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Document Control Desk October 15, 2004 Page 5

Contact:

Name Mailing Address E-mail Address Phone Number Dennis M. Pierce Security West Nine Mile Point Nuclear Station 348 Lake Rd.

Oswego, NY 13126 dennis.pierce(econstellation.com 315-349-2739 Contents of enclosure (CD-ROM) with file name, size of file and sensitivity level:

NMP1L 1873:

(cover letter)

Attachment A:

Attachment Al:

Attachment A2:

Attachment A3:

(NMP1L 1873, cover letter.pdf; 606,274 bytes, publicly available)

Third Amended NMPNS Security, Safeguards Contingency, and Security Training and Qualification Plan, Issue 6, Rev. 0 (Third Amended NMPNS Security Plan Issue 6, Rev. 0.pdf; 537,685 bytes; Safeguards Information)

Figure 1 of Appendix D to the Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, and Security Training and Qualification Plan (FIG1-OCA.pdf; 101,069 bytes, Safeguards Information)

Figure 2 of Appendix D to the Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, and Security Training and Qualification Plan (FIG2-PA&VBS.pdf; 100,700 bytes, Safeguards Information)

Summary of Security Plan Changes in Third Amended Supplemental Response (Summary of Changes.pdf; 46,763 bytes, Safeguards Information)