L -AFS A subsidiary of Pinnacle II ist Capital Corporation Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.
623-393-6116 Fax.
623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 October 13, 2004 035-00728-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for SEPTEMBER 2004 Enclosed are the Monthly Operating Reports for SEPTEMBER 2004, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Don Vogt at (623) 393-5926.
Sincerely, DMS/ap
Enclosures:
SEPTEMBER 2004 Monthly Operating Reports cc:
(all w/enclosures)
Dr. Bruce S. Malleft - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute
~~ eZ2A
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-528 Palo Verde 1 October 13, 204 Don Vogt (623) 393-5926 September 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00
- 3.
Number of Hours the Reactor was Critical 4
Number of Hours Generator On-line 5
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 868,984.07 Yr-to-Date Cumulative 5,518.30 128,300.22 5,462.67 126,851.70 0.00 0.00 6,568,486.76 152,824,177.10 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Began month in Mode 1. RX power at fufl power. Ended month in Mode 1. RX power at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TrIplScram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-529 Palo Verde 2 October 13,2004 Don Vogt
_6235 393-5926 September 2004
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,354.00 1,335.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator OnIline
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 932,071.68 Yr-to-Date Cumulative 5,972.41 126,761.67 5,932.28 125,321.80 0.00 0.00 7,774,542.48 153,162,635.35 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The Design Electrical Rating (DER) and the Maximum Dependable Capacity (MDC) reflect the power uprate performed in 2003. These are interim values. Official values approved by station owners will be determined after testing is completed at the end of the 3rd quarter (late summer) Began month in Mode 1, RX power at full power. Ended month in Mode 1. RX power at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of I
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-530 Palo Verde 3 October 13, 2004 Don Vogt (623) 393-5926 September2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On4ine S. Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date Cumulative 720.00 6,192.03 124,155.33 720.00 6,109.83 123,021.20 0.00 0.00 0.00 890,474.27 7,551,382.26 150,613,250.28 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
Began month in Mode 1. RX power at full power. Ended month in Mode 1. RX power at full power.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1