September 2004 Monthly Operating Report for Limerick Generating Station, Units 1 and 2
ML042890213
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/15/2004
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
IE24
References
GL-97-002
Download: ML042890213 (4)


Text

T.S. 6.9.1.6 October 15, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for September 2004 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of September 2004 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of September 2004 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Original signed by Bryan C. Hanson Bryan C. Hanson Plant Manager-LGS Attachments cc:

S. Collins, Administrator, Region I, USNRC S. Hansell, LGS USNRC Senior Resident Inspector

Unit:

Limerick 1 Docket No:

50-352 Date:

10/15/04 Completed by: Greg Lee Telephone:

(610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-September 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 720.00 6,180.17 144,746.64 Hours Generator On-Line (Hours) 720.00 6,136.38 142,717.58 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 823,001.00 6,952,178.00 148,778,467.00 B.

UNIT SHUTDOWN No.

Date (yymmdd)

Type Generator Off-line Duration (hrs)

Reason Method Corrective Actions/Comments None during September 2004

SUMMARY

Unit 1 began the month of September 2004 at 100% of rated thermal power (RTP).

On September 9th at 22:06 hours, reactor power was reduced from 99.9% RTP to 99.3% RTP for scram time testing.

On September 10th at 01:00 hours, reactor power was restored to 99.8% RTP. At 22:02 hours, reactor power was reduced from 99.9% RTP to 66.6% RTP for the post summer readiness load drop.

On September 11th at 23:06 hours, reactor power was restored to 99.9% RTP.

On September 15th at 16:11 hours, reactor power was reduced from 99.9% RTP to 98.0% RTP to investigate a potential reactor overpower condition.

On September 16th at 12:17 hours, ENS 41043 was submitted to NRC concerning the overpower event on Unit

1.

On September 20th at 02:39 hours, reactor power was restored to 99.9% RTP.

Unit 1 ended the month of September 2004 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During September 2004

Unit:

Limerick 2 Docket No:

50-353 Date:

10/15/04 Completed by: Greg Lee Telephone:

(610) 718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-September 2004 Design Electrical Rating (MWe-Net) 1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 Month Year to Date Cumulative Hours Reactor Critical (Hours) 720.00 6,544.13 120,994.23 Hours Generator On-Line (Hours) 720.00 6,525.02 119,212.74 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 755,828.00 7,412,197.00 128,433,563.00 B. UNIT SHUTDOWN No.

Date (yymmdd)

Type Generator Off-line Duration (hrs)

Reason Method Corrective Actions/Comments None During September 2004

SUMMARY

Unit 2 began the month of September 2004 at 100% of rated thermal power (RTP).

On September 2nd at 22:16 hours, reactor power was reduced from 99.9% RTP to 99.4% RTP for scram time testing.

On September 3rd at 04:54 hours, reactor power was restored to 99.9% RTP. At 22:02 hours, reactor power was reduced from 100% RTP to 64.0% RTP for the post summer readiness load drop.

On September 5th at 23:07 hours, reactor power was restored to 99.9% RTP.

On September 6th at 01:30 hours, reactor power was reduced from 99.9% RTP to 97.6% RTP for maintenance on the 2B Recirculation Pump MG Set. At 09:42 hours, reactor power was restored to 100%

RTP. At 23:00 hours, reactor power was reduced from 99.9% RTP to 97.1% RTP for maintenance on the 2B Recirculation Pump MG Set. At 23:45 hours, reactor power was restored to 99.9% RTP.

On September 12th at 09:58 hours, reactor power was reduced from 99.9% RTP to 98.7% RTP for maintenance on the 2B Recirculation Pump MG Set. At 13:13 hours, reactor power was restored to 100%

RTP.

On September 13th at 19:42 hours, reactor power was reduced from 99.7% RTP to 98.7% RTP for maintenance on the 2B Recirculation Pump MG Set. At 21:54 hours, reactor power was restored to 100%

RTP.

On September 16th at 22:00 hours, reactor power was reduced from 99.8% RTP to 89.1% RTP for rod pattern adjustment.

On September 17th at 02:33 hours, reactor power was restored to 99.8% RTP.

On September 22nd at 00:46 hours, reactor power was reduced from 99.9% RTP to 98.3% RTP for maintenance on the 2B Recirculation Pump MG Set. At 03:13 hours, reactor power was restored to 100%

RTP.

On September 24th at 09:59 hours, reactor power was reduced from 99.5% RTP to 97.6% RTP for maintenance of the 2B Recirculation Pump MG Set. At 13:23 hours, reactor power was reduced from 97.6%

RTP to 65.5% RTP for 5A Feedwater Heater maintenance.

Unit 2 ended the month of September 2004 at 98.3% RTP as a result of the 5A Feedwater Heater maintenance power ascension.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During September 2004