Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0421800612004-08-0606 August 2004 General Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML0428201412004-10-25025 October 2004 License Amendment No. 162, Adds License Condition 2.C.(22) & Deletes Control Room Emergency Filtration System Technical Specification Surveillance Requirement 3.7.3.6 Project stage: Acceptance Review 2004-10-25
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML21147A1672021-06-11011 June 2021 Issuance of Amendment No. 221 Regarding Revision of Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-563 ML21029A2542021-05-24024 May 2021 Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) ML21098A0452021-04-26026 April 2021 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 ML20358A1552021-02-24024 February 2021 Issuance of Amendment No. 218, Revision to Technical Specifications to Change Certain Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20294A0352020-12-22022 December 2020 Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML20094G8142020-04-0808 April 2020 Audit Plan in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19288A0732019-12-18018 December 2019 Issuance of Amendment No. 215 Revision to Technical Specification 3.3.5.3 ML19189A0042019-11-0505 November 2019 Issuance of Amendment Technical Specifications Task Force (TSTF)-564 Safety Limit Minimum Critical Power Ratio ML18306A4512019-01-0707 January 2019 Issuance of Amendment Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML18250A1632018-09-20020 September 2018 Issuance of Amendment No. 212 Elimination of Main Steam Line Radiation Monitor Trip and Isolation Function (CAC No. MG0228; EPID L-2017-LLA-0274) ML18247A4522018-09-17017 September 2018 Issuance of Amendment Revision to Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0208; EPID L-2017-LLA-0282) ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML18144A0642018-07-17017 July 2018 Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink ML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications ML17128A3162017-11-29029 November 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Process ML17076A0272017-04-14014 April 2017 Issuance of Amendment to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML17074A1092017-03-16016 March 2017 Corrections to Amendment No. 205 Regarding Type a and C Testing ML16351A4602017-03-0909 March 2017 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16270A5262016-12-15015 December 2016 Fermi 2, Renewed Facility Operating License NPF-43 ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) ML15057A2972015-03-16016 March 2015 Issuance of Amendment License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries (Tac No. MF4002) ML14016A4872014-03-10010 March 2014 Issuance of Amendment Revise the Fermi 2 Licensing Basis Concerning Protection from Tornado-Generated Missiles ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13309A5942014-01-17017 January 2014 Issuance of Amendment to Adopt TSTF-423 Revision 1 Technical Specifications End States, NEDC-32988-A ML13204A1152013-08-0808 August 2013 Attachment 2 - Fermi 1, Amendment 21 to Operating License ML13164A2502013-07-12012 July 2013 Issuance of Amendment to Change Licensee Name on the Operating License ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process ML12207A5042012-08-29029 August 2012 Issuance of Amendment for Adoption of TSTF-306 ML1135004332012-02-24024 February 2012 Issuance of Amendment 188 TSTF-50, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML1124504642011-09-23023 September 2011 Issuance of Amendment Staff Augmentation Times During Radiological Emergencies ML1122109312011-08-26026 August 2011 License Amendment 186, Reactor Coolant System Leakage ML1119202212011-07-28028 July 2011 License Amendment, Cyber Security Plan ML1036304352011-01-24024 January 2011 License Amendment, Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests ML1027703822010-10-20020 October 2010 Issuance of Amendment to Revise Degraded Voltage Function to Reflect Modification ML1013408612010-05-15015 May 2010 Issuance of Emergency Amendment Regarding Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B ML0913906462009-06-19019 June 2009 License Amendment, Issuance of Amendment Removal of Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specifications ML0812705642008-06-25025 June 2008 Issuance of Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0814904202008-06-23023 June 2008 Issuance of Amendment 179 Control Rod Notch Surveillance Test Frequency - TSTF-475 2023-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML21253A0102021-10-15015 October 2021 Revised Relief Request RR-A39 for the Fourth 10-Year Inservice Inspection Interval ML21147A1672021-06-11011 June 2021 Issuance of Amendment No. 221 Regarding Revision of Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-563 ML21029A2542021-05-24024 May 2021 Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) ML21098A0452021-04-26026 April 2021 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 ML21036A0822021-03-12012 March 2021 Relief Request RR-A42 for Inservice Inspection Impracticality During the Third 10-Year Inservice Inspection Interval ML20358A1552021-02-24024 February 2021 Issuance of Amendment No. 218, Revision to Technical Specifications to Change Certain Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20294A0352020-12-22022 December 2020 Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML20169A6522020-07-0808 July 2020 Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval ML20034F7842020-02-0707 February 2020 Issuance of Relief Proposed Alternative Requests Nos. VRR-010 and VRR-011 Associated with Fourth Ten Year Interval Inservice Testing of Various Valves ML20014E7312020-01-24024 January 2020 Issuance of Relief Proposed Alternative Request Nos. VRR-002, VRR-003, VRR-006, VRR-008, and VRR-009 Associated with Fourth Ten Year Interval Inservice Testing of Various Valves (EPID L-2019-LLR-0048, EPID L-2019-LLR-0049 ML19336A0062020-01-10010 January 2020 Issuance of Relief Proposed Alternative Request Nos. PRR-001 and PRR-004 Associated with Fourth Ten Year Interval Pump Inservice Testing Program (EPID L-2019-LLR-0038 and EPID L-2019-LLR-0041) ML19288A0732019-12-18018 December 2019 Issuance of Amendment No. 215 Revision to Technical Specification 3.3.5.3 ML19267A0272019-10-0303 October 2019 Proposed Alternative to the Required Examination Associated with Snubbers ML19248C7072019-10-0303 October 2019 Proposed Alternative to the Required Examination Associated with Valves Examination ML19183A4722019-08-19019 August 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19183A0232019-07-31031 July 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19204A2532019-07-20020 July 2019 Relief from the Requirements of the ASME Code ML19171A3572019-06-27027 June 2019 Relief from the Requirements of the ASME Code PRR-002 and PRR-003 ML19169A3152019-06-26026 June 2019 2. - Relief from the Requirements of the ASME Code ML19143A2192019-06-13013 June 2019 Relief from the Requirements of the ASME Code ML18306A4512019-01-0707 January 2019 Issuance of Amendment Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML18250A1632018-09-20020 September 2018 Issuance of Amendment No. 212 Elimination of Main Steam Line Radiation Monitor Trip and Isolation Function (CAC No. MG0228; EPID L-2017-LLA-0274) ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML18144A0642018-07-17017 July 2018 Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink ML18096A6142018-06-0505 June 2018 Relief from the Requirements of the ASME Code ML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications ML17354B0022018-03-0707 March 2018 Relief from the Requirement of the ASME OM Code (CAC No. MG0070; EPID L-2017-LLR-0079) ML18003A2102018-03-0707 March 2018 Relief from the Requirements of the ASME OM Code (CAC No. MG0119; EPID L-2017-LLR-0082) ML17128A3162017-11-29029 November 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Process ML17076A0272017-04-14014 April 2017 Issuance of Amendment to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML16351A4602017-03-0909 March 2017 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16357A2802017-01-18018 January 2017 Relief from the Requirements of the ASME Code ML16258A0402016-09-29029 September 2016 Fermi, Unit 2 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0770 and MF0771) ML16230A5082016-09-23023 September 2016 Revised Relief Request No. PRR-007 for the Inservice Testing Program Third10-year Interval (CAC No. Mf7573) ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15218A3602015-08-24024 August 2015 Inservice Testing Program Relief Request PRR-012 for Quarterly Test of Core Spray Pumps (Tac No. MF5816) ML15155A5062015-07-29029 July 2015 Request for Use of Mururoa Supplied Air Suits Models MTH2, V4F1 and Blu Suit Systems ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) ML15057A2972015-03-16016 March 2015 Issuance of Amendment License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries (Tac No. MF4002) ML14176A9292014-07-16016 July 2014 Alternative Request PVRR-001 Concerning the Third 10-Year Inservice Testing Program 2023-09-18
[Table view] |
Text
October 25, 2004 Mr. William T. OConnor, Jr.
Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI 2 - ISSUANCE OF AMENDMENT RE: ADDITION OF A LICENSE CONDITION AND DELETION OF CONTROL ROOM EMERGENCY FILTRATION SYSTEM TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.7.3.6 (TAC NO. MC3922)
Dear Mr. OConnor:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 162 to Facility Operating License No. NPF-43 for the Fermi 2 facility. The amendment consists of changes to the Technical Specifications and the addition of a license condition in response to your application dated July 30, 2004.
The amendment adds License Condition 2.C.(22) requiring an integrated tracer gas test of the control room envelope, and deletes Surveillance Requirement 3.7.3.6, which requires verification that unfiltered inleakage from control room emergency filtration system duct work outside the control room envelope is within limits.
A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the NRCs biweekly Federal Register notice.
Sincerely,
/RA/
David P. Beaulieu, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosures:
- 1. Amendment No. 162 to NPF-43
- 2. Safety Evaluation cc w/encls: See next page
ML042820141 (Letter) ML043000400 (TSs)
ML043000454 (Package)
OFFICE PDIII-1/PM PDIII-1/LA IROB/SC DSSA/SPSB OGC PDIII-1/SC NAME DBeaulieu THarris TBoyce RDennig MLemoncelli LRaghavan (by memo)
DATE 10/22/04 10/22/04 10/13/04 9/28/04 10/21/04 10/22/04 Fermi 2 cc:
Mr. Peter Marquardt Legal Department 688 WCB Detroit Edison Company 2000 2nd Avenue Detroit, MI 48226-1279 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, MI 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, MI 48166 December 2002
DETROIT EDISON COMPANY DOCKET NO. 50-341 FERMI 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 162 License No. NPF-43
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Detroit Edison Company (the licensee) dated July 30, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 162, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. DECo shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
In addition, the license is amended to add paragraph 2.C.(22) to Facility Operating License No. NPF-43 as follows:
(22) DECo shall perform an integrated tracer gas test to measure Control Room inleakage using methods described in ASTM E741-00, "Standard Test Method for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution."
This test will be performed by March 31, 2005. Further periodic assessments and testing will be performed in accordance with the guidance provided in NRC Regulatory Guide 1.197, (May 2003) "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Section D, Implementation, using the six year cycle described. In accordance with the Regulatory Guide, a self assessment will be performed after three years and a periodic test after 6 years.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Operating License Date of Issuance: October 25, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 162 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following page of Facility Operating License No. NPF-43 with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 6 6 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 3.7-7 3.7-7 3.7-8 3.7-8 3.7-10 3.7-10
(21) The schedule for performing surveillance requirements (SRs) that are new or revised in Amendment No. 134 shall be as follows:
- For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of this amendment.
- For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
- For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
- For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
(22) DECo shall perform an integrated tracer gas test to measure Control
- Room inleakage using methods described in ASTM E741-00, "Standard
- Test Method for Determining Air Change in a Single Zone by Means of
- a Tracer Gas Dilution." This test will be performed by March 31, 2005.
- Further periodic assessments and testing will be performed in accordance
"Demonstrating Control Room Envelope Integrity at Nuclear Power
- Reactors," Section D, Implementation, using the six year cycle described.
- In accordance with the Regulatory Guide, a self assessment will be
- performed after three years and a periodic test after 6 years. *
[NEXT PAGE IS PAGE 8]
Amendment No. 117, 134, 162
- SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 162 FACILITY OPERATING LICENSE NO. NPF-43 DETROIT EDISON COMPANY FERMI 2 DOCKET NO. 50-341
1.0 INTRODUCTION
By application dated July 30, 2004, the Detroit Edison Company (DECo or the licensee) requested changes to the Technical Specifications (TSs) and the addition of a license condition for Fermi 2. The proposed changes would add License Condition 2.C.(22) requiring an integrated tracer gas test of the control room envelope, and would delete Surveillance Requirement (SR) 3.7.3.6, which requires verification that unfiltered inleakage from control room emergency filtration system duct work outside the control room envelope is within limits.
2.0 REGULATORY EVALUATION
The Nuclear Regulatory Commission (NRC) staff considered the following regulatory documents in developing its finding on this license amendment application:
10 CFR 50.2 provides the definition for the term "design bases."
10 CFR Part 50, Appendix A, General Design Criterion 19, Control Room, provides requirements regarding the value for radiological dose to control room personnel to be used as a limiting value for design basis analyses.
NRC Generic Letter 91-18, "Information to Licensees Regarding NRC Inspection Manual Section on Resolution of Degraded and Nonconforming Conditions," provides the framework for licensees to make an operability determination and take corrective actions upon discovery of a nonconforming condition, such as when as-built equipment does not meet the design requirements specified in the Final Safety Analysis Report.
3.0 TECHNICAL EVALUATION
The licensee proposed revising TSs to delete SR 3.7.3.6 which requires that the license "Verify that unfiltered inleakage from [Control Room Emergency Filtration] CREF system duct work outside the Control Room envelope that is at negative pressure during accident conditions is within limits," at a frequency of every 36 months. In addition, the licensee proposed deleting footnote # that is associated with this 36-month frequency, as well as, deleting the reference for performance of SR 3.7.3.6 from TS Limiting Condition for Operation (LCO) 3.7.3, Conditions D and F.
The NRC staff noted that a portion of the CREF duct work that is under negative pressure is located outside of the control room envelope. In addition, these sections of duct work use a brazed mechanical joint rather than a welded joint. The joints are sealed with a silicone sealant that can become hard and brittle and crack with age. Leakage through cracks in the sealant would enter the control room. This potential leakage would enter the control room which could increase the radiological dose received by control room personnel following a postulated accident.
SR 3.7.3.6 was implemented to provide assurance that the seals between the joints under negative pressure were intact. Although inspection and maintenance programs are performed to visually assess and repair the joint sealing, only direct testing can provide the integrity assurance. The deletion of SR 3.7.3.6 removes the requirement to directly test the integrity of these non-welded, silicone sealed, CREF duct work joints that are at negative pressure outside of the control room envelope.
To provide assurance of control room habitability integrity for unfiltered inleakage, the licensee proposed adding License Condition 2.C.(22) which states:
"DECo shall perform an integrated tracer gas test to measure Control Room inleakage using methods described in ASTM E741-00, "Standard Test Method for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution." This test will be performed by March 31, 2005. Further periodic assessments and testing will be performed in accordance with the guidance provided in NRC Regulatory Guide 1.197, (May 2003) "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Section D, Implementation, using the six year cycle described. In accordance with the Regulatory Guide, a self assessment will be performed after three years and a periodic test after 6 years."
The license condition does not explicitly state the test acceptance criterion for control room inleakage. As such, the license condition also does not describe the actions that would be required if the test acceptance criterion were not met. The NRC staff has determined that the acceptance criterion for the test is the design basis value for control room inleakage used in the design-basis accident analysis, and that the test must be performed in the operating configuration(s) assumed in the design-basis accident analysis. The NRC Division of Licensing Project Management provided the following information to explain the regulatory flow path for the Fermi tracer gas testing license condition:
The license condition will require the performance of the tracer gas test in accordance with the standard. The function of the tracer gas test is, in part, to determine the level of control room envelope in-leakage. The 10 CFR 50.2 design basis for control room envelope inleakage is established and documented in dose calculations. These values have been established in docketed correspondence.
If the tracer gas testing identifies inleakage greater than that assumed in the calculations, the CREF system may not be capable of performing its specified safety function in accordance with the Technical Specification definition of OPERABILITY. As discussed in NRC Generic Letter 91-18, licensees are obligated to thoroughly evaluate any information that potentially impacts the ability of a Technical Specification system to perform its specified safety function.
If the licensee believes that the system remains capable of performing its specified safety function (e.g., the deviation from assumed inleakage is very small and the licensee understands that the calculations contain conservatisms), an operability determination can be completed in accordance with the guidance in NRC Generic Letter 91-18.
If this evaluation concludes that the system is capable of performing its specified safety function (i.e., it is OPERABLE but degraded/non-conforming), operation may continue and the degraded/non-conforming condition is resolved via the corrective action program.
If the OPERABILITY determination concludes that the CREF system is not OPERABLE or the licensee does not have an initial rationale for believing the CREF system is OPERABLE but degraded/non-conforming, then both trains of CREF would be declared in-OPERABLE and CONDITION 3.7.3.B would be entered. REQUIRED ACTION 3.7.3.B.1 would have to be completed within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. If this REQUIRED ACTION is not met REQUIRED ACTION 3.7.3.C is entered. Unless the condition can be corrected, 3.7.3.C would require that the plant be in MODE 3 in 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> and MODE 4 in 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br />.
It should be noted that CONDITION 3.7.3 B states, Two CREF subsystems inoperable due to an inoperable control room boundary in MODE 1, 2, or 3. Thus, an inoperable control room boundary based on tracer gas test results is a sufficient reason to declare the CREF system inoperable. The actions for an inoperable CREF system are sufficient to respond to a failure to achieve successful test results.
The NRC staff considers the tracer gas test specified in the proposed License Condition 2.C.(22) to be a better test than the existing SR 3.7.3.6 that is being deleted. The tracer gas test will address the entire boundary of the control room envelope and produce a more accurate assessment of unfiltered inleakage.
The NRC staff has also determined that the changes to TS LCO 3.7.3, Conditions D and F, as well as the deletion of the SR 3.7.3.6 footnote, are acceptable because these revisions involve the deletion of wording that relates to SR 3.7.3.6 which is being deleted. Therefore, this language would no longer be applicable.
The proposed changes to the above TSs require that the licensee revise the discussion in the associated TS Bases section. Although the licensees application included possible wording for the revised TS Bases, the licensee will formally address the change to the Bases in accordance with the Fermi 2 Bases Control Program. The TS Bases should be addressed separately from this amendment and should be included in a future update of the TS Bases in accordance with the Fermi 2 Bases Control Program.
Based on the above evaluation, the NRC staff finds that the proposed amendment is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Michigan State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or changes a surveillance requirement. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (69 FR 50217). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: E. Forrest Date: October 25, 2004