- r Britt T. McKlnney Vice President-Nuclear Site Operations U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington DC 20555-0001 PPL Susquohanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@ pplweb.com PP mu--.
ban am-.*
SEP 2 3 2004 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO THE SEPTEMBER 10, 2004 NRC REQUEST FOR IMPLEMENTATION STATUS OF INDEPENDENT SPENT FUEL STORAGE INSTALLATION INTERIM COMPENSATORY MEASURES (TAC NO. MC2979 AND MC2980)
PLA-5820 Docket Nos. 50-387 and 50-388
References:
1)
PLA-5550, B. L Shriver (PPL) to G. M. Tracy (NRC), "Ssquehanna Steamn Electric Station Response to October 16, 2002 NRC Order Modifying Licenses EA-02-104,"
dated November 4, 2002.
- 2) PLA -5798, B. L Shriver (PPL) to USNRC, "Susqutehanna Steamz Electric Station Updated Submittal of the Sutsqutehanna Steam Electric Station Physical Security Plan Revision 0," dated August 30, 2004.
- 3) Letterfrom M. H. Chernoff (NRC) to T. L Harpster (PPL), "Implementation Status of Independent Spent Fuel Storage Installation Interim Coinpensatory Measures (TAC NOS.
MC2979 and MC2980)," dated September 10, 2004.
The purpose of this letter is to provide the PPL Susquehanna, LLC (PPL) response to the NRC request dated September 10, 2004. [Reference 3]
The Independent Spent Fuel Storage Installation (ISFSI) at PPL's Susquehanna Steam Electric Station is located within the protected area of the operating power reactors.
Therefore the requirements of, and changes associated with, the NRC issued Order (EA-03-086) for the revised Design Basis Threat dated April 29, 2003 apply to the PPL ISFSI-related security provisions. PPL has determined that there have been no modifications or revisions which decrease the implementation effectiveness of ISFSI-related security provisions established by the ISFSI ICM Orders issued on October 16, 2002. The PPL ISFSI security and contingency plan meets the requirements set forth in the October 16, 2002 NRC Orders Modifying Licenses EA-02-104 as stated in Appendix D of enclosure 1 of Reference 2.
If you have any questions, please contact Mr. Joseph Meter at (570) 542-1873.
J5 I e Z O *~
Document Control Desk PLA-5820 In accordance with 10 CFR 2.202(b), the following affirmation is provided.
Britt T. McKinney states that he is the Vice President-Nuclear Site Operations of PPL Susquehanna, LLC, is authorized to execute this oath on behalf of PPL and, to the best of his knowledge and belief, the facts set forth in this letter are true.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on:
S>2W-Britt T. McKinney copy: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP