Main Office: Box 83 Shelburne Falls. MA 01370 P/F:413-339-5781/8768 CTCAN: 54 Old Turnpike Road, Haddam, CT 06438 P/F: 860-345-2157 VTCAN: Box 403, Putney. VT 05346 P/F: 802-387-4050 NVTCAN 16 Johnson St. Burlington, VT 05656 03858802 382-8153 CNYCAN: 140 Basset St.. Syracuse, NY 13210 315-425-0430 WESCAN: 42A Adrian Court, Cortlandt Manor. NY 10567 914-739-6164 NYCAN: 144 North 11 St. Brooklyn, NY 11211 718-963-9105 NHCAN, 14 North Main St. Newton, NH, 603-382-2575 CITIZENS AWARENESS N ETWORK September 21, 2004 DOCKETED USNRC Secretary United States Nuclear Regulatory Commission Washington, DC 20555-0001 ATT: Rulemakings and Adjudications Staff RE:
In the matter of Yankee Atomic Electric Company (Yankee Nuclear Power Station, Rowe, Massachusetts)
September 22, 2004 (3:13PM)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF Docket no.50-029
Dear Rulemakings and Adjudications Staff:
Enclosed for filing in the above referenced matter please find the original and two copies of a letter from Citizens Awareness Network to the parties to the above matter attaching The Requests For Additional Information regarding the License Termination Plan for Yankee Rowe from the NRC Staff which can not be provided to them electronically on this day. We had assumed that since these are NRC documents that they would be readily available to all the parties; however we decided to provide them to parties to ensure their access to them.
416bor-AB. Katz Executive Director Citizens Awareness Network cc:
Service List i-etpIae =-sec'/- oq3 5VO~
-5 (5 c %/- 0 9-
Main Office: Box 83 Shelburne Falls, MA 01370 P/F:413-339-5781/8768 CTCAN: 54 Old Turnpike Road, Haddam, CT 06438 P/F: 860-345-2157 VTCAN: Box 403, Putney, VT 05346 P/F: 802-387-4050 NVTCAN 16 Johnson St. Burlington, VT 05656 03858802 382-8153 CNYCAN: 140 Basset St., Syracuse. NY 13210 315-425-0430 WESCAN: 42A Adrian Court, Cortlandt Manor, NY 10567 914-739-6164 NYCAN: 144 North 11 St, Brooklyn, NY 11211 718-963-9105 NHCAN. 14 North Main St, Newton, NH, 603-382-2575 CITIZENS AWARENESS-N ETWORK September 21, 2004 Chief Judge G. Paul Bollwerk, III Atomic Safety and Licensing Board United States Nuclear Regulatory Commission Washington, D.C. 20555 RE:
In the matter of Yankee Atomic Electric Company LTP (Yankee Nuclear Power Station, Rowe, Massachusetts)
Docket no.50-029 ASLBP No. 04-831-01-OLA
Dear Chief Law Judge Bollwerk (and Parties to above referenced case):
Citizens Awareness Network has sent to all the parties to the above matter Requests For Additional Information regarding the License Termination Plan for Yankee Rowe from the NRC Staff which can not be provided to them electronically on this day. We had assumed that since these are NRC documents that they would be readily available to all the parties; however we decided to provide them to parties to ensure their access to them.
CAN is sorry for any inconvenience this may cause.
Sincerely, itz Exnes tor Citizens Awareness twvork, Inc.
cc:
Service List
FRCOG PLASMING 41377411ES5 10d/ZW.1%04 1":
X fprn r-.
IM--
REOUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE TERMINATION PLAN YANKEE (ROWE) NUCLEAR POWER STAiOQN DOCKET NO. 5D.029
- 1.
(Page 5-1) Section 5.1, second paragraph, states that 'advanced survey technologies may be used to conduct radiological surveys that can effectively scan 1 % of the surface...'. On page 5-17, it is noted that less than 100% coverage of survey units may occur. Text in Section 5.1 should state that less than 100% coverage may occur for Class 2 and 3 survey units.
Basis: LTP sections should be consistent with each other.
- 2.
(Page 5-1) Section 5.1, second paragraph, discusses advanced survey technologies.
Technical evaluations will be developed. Confirr that NRC will be given the opportunity to review the technical evaluations and you will provide prior notification to the NRC before the use of alternate instruments or technologies.
Basis: This information is necessry to determine if the survey method is adequate to meet the decommissioning requirements in Subpart E of 10 CFR 20.
- 3.
(Page 56) In the second paragraph under the bullet 'Specify Tolerable Limits on Decision Errors", change the last sentence to 'The following statement will [rather than may] be used as the null hypothesis at YNPS unless otherwise approved by the NRC:
'The survey unit exceeds the release criteria." Change Section 1.6 to reflect NRC concurrence is needed to use other than this null hypothesis.
Basis: Other null hypotheses may be less robust. MARSSIM recommends using the null hypothesis as stated above. Statistical tests must ensure survey units meet the decommissioning requirements in Subpart E of 10 CFR 20.
- 4.
(Page 5-6) A Type I error of 0.05 (5%) is set in section 5.4.1. If double sampling is performed as proposed in Section 5.5.3.5, a smaller Type I error (e.g., 0.025) may be necessary for the Initial survey design. See additional discussion In comment on Section 5..3.5. Please Justify your proposal or revise.
Basis: Double sampling changes the Type I error. This information is necessary to determine If the statistical analysis Is adequate to meet the decommissioning requirements in Subpart E of 10 CFR 20.
- 5.
(Page 5.7) The first paragraph of Section 5.4.2 states "The process described in LTP Section 1.6 will be used to evaluate the modifications to unit classifications to determine whether prior notification by the NRC is required.' As it reads currently, "...prior notification by the NRC...' isn't really correct since notification is done by the licensee to the NRC. Please revise "by the NRC" to "to the NRC."
FF-RC PLY
'IWN:
418774119S 7e/28/04
- 3:17pm P.
MaG 6.
(Page 5-8) Section 5.4.2, first paragraph folloWng Table 5-1 must be consistent with Section 5.5.3.5, Re-survey. Changes are anticipated in Section 5.5.3.5 concerning subdividing survey units. Subdividing the survey units changes the statistical result Please Include a requirement for NRC notification prior to subdividing survey units.
- 7.
(Page 5-8) Section 5.4.3 should provide the accuracy (and explanation as to the acceptability ol that accuracy) of the GPS system.
Basis: Aocurate survey equipment is necessary for the proper chara-teriation and for meeting the rernodiation requirements in Subpart E of 10 CFR 20.
- 8.
(Page 5-9) Section 5A.4, third paragraph, discusses an alternative background determination method. This method rmay be used only with prior NRC approval. It is not clear If this is a conservative background determination method. This should not be the general or routine method for obtaining backgrounds. Provide further technical Justification or remove.
- 9.
(Page 5-12) Section 5.4. 52, first paragraph after bullets, references two standard deviations above the FSS mean as a threshol to initiate an investigation. Explain the statistical basis for this threshold, and vhich data set the standard deviation comes from. I! Is not clear that the proposed threshold and associated survey(s) provide assurance equivalent to the FSS.
- 10.
(Page 5-12) Section 5.4.52, last paragraph should reference, specify, or describe the specifc radiological contamination leveles that are used to trigger an investigation survey.
- 11.
(Page 5-14) Section 5A.6.1, last paragraph discusses insignificant radionudides and gives a citation to to CFR 20. However, 1 CFR 20.1204(g)(3) pertains to calculation of internal dose for occupational exposure, and the dose is still calculated on the total activity of the mixture. NUREG-1757, Vol. 2, Section 3.3, page 34 has a discussion of the treatment of insignificant radionuclides concerning pathway analysis and dose for decommissioning. The treatment in the LTP should be similar to that in NUREG-1757 or a Justification need to be provided.
- 12.
(Page 5-14) Section 5.4.62: may need more detail concerning DQOs for surrogate ratios. How (and how well) will ratios be daternined? Will the ratio be checked to ensure It Is representative during the FSS?
- 13.
(Page 5-15) Section 5.4.62, last two sentences: the contributions from all radionuclides, including InsIgnificant contributors, must be accounted for in demonstrating cornpliance per NUREG-1757. Delete the last sentence or justify. See question 11.
- 14.
(Page 5-16) Section 5.5, second bullet at bottom of page, gives ranges of scanning coverage for Class 2 survey units. Provide the methodology for deciding what the coverage will actually be for a Class 2 survey unit-
FRCOtC PLANING 41S2774119S FR~O PL*I~lE 4877415500/28/84 03sl7pon P.
007 15.
(Page 5-17) Section 5.5: the text on this page describes In a general way how advanced survey techniques will be used. When 100% of the area is covered (as in Class I units), and assuming an adequate MDC. the advanced survey technique provides more complete spatial coverage than discrete measurements or samples.
However, when less than 100% Is covered, there will be some unsampled area.
MARSSIM traditional methodology provides coverage over 100% of the area by a randorn-start systematic pattern, with statistical inference. Even 100 % of Class 3 areas are sampled randomly. The proposed substitution of advanced survey techniques for both the scan and fixed measurementslsampling does not provide adequate spatial coverage for Class 2 and 3 areas. Please provide further clarification on how advanced survey techniques will be conducted on Class 2 and 3 areas to ensure that 100% of the area Is subject to random sampling.
- 16.
(Page 5-17) The last bullet discusses surveys that combine advanced techniques with traditional methods. Provide more detail as to how the number of traditional measuroments/samples will be determined for the areas not assessed with the advanced technique, and how statistical tests wil be performed.
- 17.
(Page 5-18) Section 5.5.1.1 sets a at 0.05. Note that the double sampling proposed in Section 5.5.3.5 winl increase a to greater than 0.05. If the ficensee retains the provision for double sampling, a should be setto 0.025. See question 4 4.
- 18.
(Page 5-19) Section 5.5.1.2, sentence after the two bullets: as noted in the cornmern for page 5-9, Section 5.4.4, parameters for backgrounds should not be taken from the survey area. Add a sentence emphasizing that the reference areas wAil not be in the survey area unless NRC approval is obtained.
- 19.
(Page 5-24) In the paragraph following Equation 5-15, it is stated that if a method of calculating MDC is different than MARSSIM, a technical evaluation will be available for NRC inspection. Noficaion to the NRC should be made prior to implementation.
Basis: Since the MDC Is a key parameter for survey design, the method to calculate MDC should not be changed without NRC concurrence. Calculating MDC in an approved and defensible manner is necessary to ensure the survey design is adequate to meet the decommissioning requirements in Subpart E of 10 CFR 20.
- 20.
(Page 5-26) Section 5.5.1, last paragraph: the accuracy and suitablity of the GPS system should be provided somewhere. (Essentially the same comment as for Section 5.4.3, page -8.) See question # 7.
- 21.
(Page 527) Section 5.52, first paragraph at top of page: Specify the number, percentage, or other DOO that quantifies how many samples will be taken to confirm the radionuclide rmx.
- 22.
Page 528) Section 5.5.3.3 discusses remediation-Provide examples of °other reasons that cause removal of materials that would not be considered remediation.
- 23.
(Page 5-28) Section 5.53.3 does not discuss the possibility that remediation may also be necessary to meet the requirement for the average concentration above background
F-RC OG PLANNI lNG 4197741195 P~cO~PLANNC 4377419S06/ZB/04 03:17pim P.
0G0e to be less than the DCGLW, not just those spots above the DCGLM,,. Please address this issue.
- 24.
(Page 5-29) Section 5.5.3.4 allows subdividing a survey unit and reclassifying the parts.
While a whole unit could be re-classified from a less restrictive to more restrictive classification without prior NRC approval, subdividing a failed unit has a potential impact on the Type 1 decision error (as well as raising questions concerning the original classification methodology) and so should be done only with prior NRC notification.
- 25.
(Page 5-29) Section 5.5.3.5 proposes a re-survey methodology that is essentially double sampling. Double sampling can double the Type I decision error. In some cases, double sampling may be acceptable if a smaller Type 1 error was used for the initial survey design. if the original survey uses a Type 1 error of 0.05, the proposed additional sampling of the subdivided cleaner' area would result in an increase of the Type I error to greater than 0.05 and would require NRC approval. See also questions 4 and 17.
- 26.
(Page 5-29) Section 5.5.3.5, last paragraph: This case (remediation of a small area of a Class 1 survey area and subsequent limited survey) could only be performed If the survey unit passed the Wilcoxon or Sign test.
- 27.
(Page 5-32) Section 5.6.1.3, last paragraph: NRC notification should be made prior to using advanced survey technologies. See also question X2.
- 28.
(Page 5-32) Section 5.6.1.4: NRC notification should made prior to using advanced survey technologies. See also question E2
- 29.
(Page 5-32) Section 5.6.1.4, last paragraph: While a calibration using one geometry may be extended to others by modeling, the requirement that the measured configuration matches the assumed (modeled) configuration exists. Often, much more data is needed concerning the materials close to the source (such as shield densities, thicknesses, and composition). A source distribution is also assumed. These factors and associated quality assurance will need to be addressed in a technical support document submitted to the NRC prior to implementation.
- 30.
(Page -32) Section 5.6.1.5: A nominal or minimum sample size (mass) and depth should be specified, as well as procedural details such as removal of extraneous material and handling.
- 31.
(Page 5-35) Section 5.6.2.3: "adjusted' data must be documented and noted as such in the FSS Report. The technical basis and rationale for the adjustment must be provided for review.
- 32. -
(Page 5-35) Section 5.6.2.4: The statement Instruments and methods used for field measurements will be capable of meeting the investigation level in Table 5-2 Is less limiting than the third paragraph on page 5-17 (10-50% of the DCGL). Please resolve the discrepancy.
FRrZOQ PLk#IIG 4157?4115
3,Z8e4 03:1?jxn P. a
Fr=C P'LPJN"IN 41577411X5 Vs.,z3184 03:17p P.
DU$ 33.
(Page 5.38) Section 5.62A.4. first paragraph, second sentence: If larger Nal detectors..are used, then the scan MDC will be computed using the methods of
_.MARSSIM. Please commit to documenting the computation of the scan MDC.
- 34.
(Page 5-38) Secton 5.6.2.4.4, second paragraph, last sentence: Demonstrate the alternate method of determining the scan MDC is conservative.
- 35.
(Page 5-44) Section 5.6.32.2 states that 25 locations in the industrial area w1l be sampled Initially for subsurface contamination. Please provide the rationale for this number.
- 36.
(Page 5-44) Section 5.6.3.2.2 itates a minimum of 5% of the routine subsurface samples will be analyzed for hard-to-detect radionuclides. For other samples (e.g.,
surfaces soils), what fraction vwl be analyzed for hard-to-detect radionuclides? Is there additional Information to support this percentage?
- 37.
(Page 5-44) Section 5.6.322 indicates that 3-meter subsurface samples will be haor)genized aver the entire depth of the core. Homogenizing over 1-meter lengths or less provides more information on the vertical distribution of radionucrlides. Please justfy 3 meter homogenization.
- 38.
(Page 5-46ff) Section 5.7 addresses only the traditional type of surveys. It Is not clear how data from traditional methods combtned witf advanced methods, or data from advanced methods alone, wiR be evaluated.
- 39.
(Page 5-50) Secton 5.7.2, second paragraph from top: elaborate on which actual values will be assigned to 'less than MDC' data for the Sign Test
- 40.
(Page 5-51) Section 5.7.5, second paragraph references MARSSIM Secftons 1.9 and 1.10 concerning retospective power analyses Section 1.10 presents spreadsheet forrnuas and does not deal with power analyses.
- 41.
(Page 5-51) Section 5.7.5, last sentence: Depernding on the survey design, a new survey may also Increase the Type I error and would, therefore, also require con-urrence by the regulator. Please revise the statement axordingly or justify why not.
- 42.
(Page 4-2) Section 42.1: Please commit to NRC notification prior to backill of excavatons or justify why not.
- 43.
(Page 43) Section 4.2.3: Is no remediationt of groundwater" stll true given more data on the tritium plume?
- 44.
(Page 4-4) Section 4.3.2: last paragraph: provide justification lor (or the source of) the statement 'The ALARA criterion is met by performing the action and not necessarily by achieving results below the specified action level', and also the next sentence.
- 45.
(Page 4A-3) Table 4A-1 change parameter *R to.
r-RCOG PLNtING 4137741195 L'6V28/e4 eO3s7pm P.
010 46.
(Page 4A-5) last paragraph: Additional discussion is needed concerning meeting ALARA criteria by performing a cleanup action as opposed to achieving cleanup goals.
- 47.
HSA Section 8 references: provide Rel. 15 (YRC-1178)
- 48.
HSA Vol. 1 (page 7-4) Section 7.3 references Section 72.2; should this be 7.3.2?
- 49.
HSA Vol. 1 (page 7-6) paragraph preceding Section 7.3.1:
'in examining the SOF values on Table 7-4, It Is evident that the use of the interim DCGLs would not result In any reclassifications for all class 2 and 3 survey areas given the reasonably close agreement between these DCGLs and the low SOF values shown for the survey areas. Therefore, modification of the comparison basis to the final proposed DCGLs is not needed since this data provides ample substantiation of the classification performed only by historical basls."
Commoent More discussion Is needed on possible reclassification due to smaller DCGLs. The criteria for classification are not presented quantitatively, so it is not evident that the smaller final DCGLs do not cause some previously Class 3 areas to be Class 2. In addition contributions from tritium and Sr-90 must be added if present. An additional concern Is that the dose contribution from insignrfficarrt radionucrides may not have been factored in (see comment for page 5-14. Section 5.4.6.1). Some areas that are classified as Class 3 (for example, OOL-01, OOL-03, and OOL-08) will have a mnaxmum SOF that is close to or greater than 0.5. Table 7.4 should be augmerted (or a new table created) with SOFs based on the final DCGLs and accounting for dose from Insignificant radionuclides, tritium and Sr-900. (Conversely, subtraction of environmental background for Cs-137 will lower the SOF.)
- 50.
HSA OOL-02, p.4, current status ff, discusses OOL-08... need OOL-02 discussion.
S1.
The licensee should provide groundwater potentiometric maps of the water-bearing units that have been or potentially may be impacted by site-generated radionuclides.
The licensee should indicate groundwater flow directions on these maps and provide Information on the hydraulic gradient Additional potentiometric maps may need to be developed to represent seasonal or climatic changes in the water levels if these changes are significant.
- 52.
The extent of the H-3 groundwater plume and of other potential site-generated radionuclide plumes should be adequately characterized, including horizontal and verlical dimensions and magnitude of radionuclide concentrations. The characterization of the plume(s) should also cover the development of hydraulic conductivity and storage values for the different water-bearing units.
- 53.
The ficensee should discuss whether site-generated radionuclides have moved offshte (i.e., reached Sherman Pond, Deerfield River, ori other locations) or discuss the potential for site-generated radionuclides to move off site. The fate and transport of the radionuclides in the groundwater should be evaluated and discussed. The licensee should also provide the rates of groundwater transport and an estimate of the time for radionuclides In the groundwater to travel offsite.
r-RCOG PLANINS 41=z4119S F~cO PL~IN
~ 413741 SS G/28/04 02:17pm P.
011
- 54.
The relationship between groundwater and surface water should be examined and discussed.
- 55.
The only groundwater sample results for site-generated radionuclides in the LTP are for H-3, gross alpha, and gross beta (Table 2-7). The concentrations and dates of sample collection for all site-generated radionuclides in the groundwater and surface water should be provided.
Basis (51-55): The extent of site-generated redionuclides in the groundwater and surface water needs to be adequately characterized to understand the potential dose that these radionuclides may produce. The existing H-3 groundwater plume and other potential site-generated radionuclide groundwater plumes should be defined with respect to length, width, depth, and magnitude of concentration. The hydrogeologic features at the site that impact the ability of radionuclides in the groundwater and surface water to migrate should also be characterized. These data are needed to understand the impact, the potential dose, of sitegenerated radionuclides on humans.
- 56.
The dose contribution of the H-3 plume should be evaluated. Based on the results of the analysis, either a derived concentration guideline level (DCGL) can be created or, if the dose is less than 0.025 mSvfy (2.5 mremty), the H-3 dose contribution can be treated as insignificant as described in Section 3.3 of NUREG-1757, Volume 2. The dose contribution, as described in the guidance, would still count as part of meeting the dose limit.
Basis: The license termination rule is based on an all-pathways dose analysts. Data from the site shows elevated concentrations of H-3 in portions of the groundwater.
- 57.
The LTP should be revised in Chapter 6 to include a common table displaying the DCGLs for soil, surfaces, and below-grade concrete. Additionally, the DCGLs for elevated measurements should be Included in the revised Chapter 6.
Basis: Currently, the site-wide average DCGLs and the elevated measurements DCGLs are contained in a number of separate documents that were provided as support to the LTP between December 2003 and March 2004. Consolidation of the derived limits would facilitate review and future inspection against the derived limits.
Please provide copies of the following documents:
- 1.
Copies of Franklin County Council of Governments comments on the LTP (and YAEC responses). Please submit these as soon as possible, as we would like to review them before the public meeting.
- 2.
One copy of the November 2003 Public Archeology Laboratory report, 'Archeological Reconnaisance Survey, Archeological Resources Management Plan, Yankee Nuclear Power Station.
rule PPING 41S77411E5 CSIZ804 MS27p P.
012 Z Copies of communications tolfrom Massachusetts Historical Commission, including: Ju*y 11, 2003 letter to MHC from ERM and August 18, 2003 response from MHC to ERM.
- 4.
Copies oi communications tolirom the Wivision of Fisheries and Wildlife or the Fish and W~dife Service concerning endangered species.
S.
Site Characteriation Status Report when available.
- 6.
Copy of MEPA certificate when available.
.7.
Unredacted copy of the in!orination subrritted to FERC in reference 7-2.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD CHIEF JUDGE G. PAUL BOLLNWERK, III In the Matter of
)
YANKEE ATOMIC ELECTRIC COMPANY )
Docket No. 50-29 (Yankee (Rowe) Atomic Power Station)
License Termination Plan
}
CERTIFICATE OF SERVICE I hereby certify that copies of the within letter and attached resume of Robert Ross in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class; this 21 st day of September, 2004.
Office of the Secretary ATTN: Docketing and Service U.S. Nuclear Regulatory Commission Washington, D.C. 20555 hearingdocket~nrc.gov Margaret J. Bupp, Esq Office of General Counsel U.S Nuclear Regulatory Commission Washington, D.C. 20555 mjb5@nrc.gov Chief Judge G. Paul Bollwerk, III Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555 gpb(nrc.gov David A. Repka, Esq.
William A. Horin, Esq.
Winston & Strawn LLP 1400 L Street, N.W.
Washington, D.C. 20005-3502 drepka~winston.com whorin@winston.com) 2 Drk Deborah B. Katz, pro se for Citizens Awareness Netwi