CPSES-200402123, August 2004 Monthly Operating Report for Comanche Peak Steam Electric Station, and Correction to May and June Reports for Unit 2

From kanterella
(Redirected from ML042720360)
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Comanche Peak Steam Electric Station, and Correction to May and June Reports for Unit 2
ML042720360
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/20/2004
From: Blevins M, Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200402123, TXX-04169
Download: ML042720360 (6)


Text

^TXU Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &

Electric Station Chief Nuclear Officer P. O. Box 1002 (EO1)

Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 697 6652 mike.blevins~txu.com Ref: #10CFR50.36 CPSES-200402123 Log# TXX-04169 RP-84 September 20,2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 MONTHLY OPERATING REPORT FOR AUGUST 2004 AND CORRECTION TO MAY AND JUNE REPORTS FOR UNIT 2 REF: 1. Letter logged TXX-04101 from TXU Energy dated June 21, 2004 "MONTHLY OPERATING REPORT FOR MAY 2004"

2. Letter logged TXX-04127 from TXU Energy dated July 16, 2004 "MONTHLY OPERATING REPORT FOR JUNE 2004" Gentlemen:

Attached is the Monthly Operating Report for August 2004, prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License, Nos. NPF-87 and NPF-89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.

Additionally, corrected reports are submitted for the months of May and June for Unit

2. A manual spreadsheet entry error resulted in all entries on line 6 "Net Electrical Energy Generated (MWHrs)" to be in error for the month of May. This also resulted in the entries on line 6 for "Yr-to-Date" and "Cumulative" to be in error for the month of June.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

TXX-04169 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units I and 2. Should you have any questions, please contact Douglas Snow at (254) 897-8448.

Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: fi 277 Q%_

Fred W. Madden Regulatory Affairs Director DWS Attachment cc - B. S. Mallett Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors

' Attachment to TYX-04169 Page I of 4 OPERATING DATA REPORT DOCKET NO. 50-445 UNIT NAME Comanch ie Peak 1 DATE September 13, 2004 COMPLETED BY Gary Lytle TELEPHONE (54) 9-' 5455 REPORTING PERIOD: / August 2004

1. Design Electrical Rating 1,150.00
2. Maximum Dependable Capacity (MWe-Net) 1,150.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 4,988.00 108,173.43
4. Number of Hours Generator On-line 744.00 4,948.87 107,265.10
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 859,537.00 5,602,218.00 114,587,341.0 UNIT SHUTDOWNS Type Method of l F: Forced Duration Shutting Cause & Corrective Action No. Date S:Scheduled (Hours) Reason Down 2 Comments I INONE I I I NONE I I I I I I I

SUMMARY

Unit 1 began the month at full power. Unit 1 ended the month at full power.

2 1 Method:

Reason: 1 Manual A Equipment Failure (Explain) 2 Manual Trip/Scram B Maintenance or Test 3 Automatic Trip/Scram C Refueling 4 Continuation D Regulatory Restriction 5 Other (Explain)

E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain)

' Attachment to TXX-04169 Page 2 of 4 OPERATING DATA REPORT DOCKET NO. 50-446 UNIT NAME Uo ma n Rhhe Peak 2 DATE September 13,2004 COMPLETED BY Gary Lytle TELEPHONE 54) 9-i 5455 REPORTING PERIOD: I Wgust 2004

1. Design Electrical Rating 1,150.00
2. Maximum Dependable Capacity (MWe-Net) 1,150.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,855.00 86,691.05
4. Number of Hours Generator On-line 744.00 5,855.00 86,141.28
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 842,880.00 6,689,441.00 93,744,743.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date s: Scheduled (Hours) Reason 1 Down 2 Comments l I I NONE I I I I NONE I I I I I I I

SUMMARY

Unit 2 began the month at full power. Unit 2 ended the month at full power.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

I Attachment to TXX-04169 Corrected Page 2 of 2 for XX-04101 Page 3 of 4 OPERATING DATA REPORT DOCKET NO. 50-446 UNIT NAME Comanche Peak 2 DATE September 13,2004 COMPLETED BY TELEPHONE REPORTING PERIC May 2004

1. Design Electrical Rating 1,150.00
2. Maximum Dependable Capacity (MWe-Net) 1,150.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,647.00 84,483.05
4. Number of Hours Generator On-line 744.00 3,647.00 83,933.28
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 854,385.00 4,186,066.00 91,241,368.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I I I NONE lI I I NONE I I I I I I I I

SUMMARY

5/01 000 Unit began the month at full power 5/31 2400 Unit ended the month at full power.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1

' Attachment to TXX-04169 Corrected Page 2 of 2 for TXX-04127 Page 4 of 4 OPERATING DATA REPORT DOCKET NO. 50-446 UNIT NAME Comanche Peak 2 DATE September 13, 2004 COMPLETED BY Gary Lytle TELEPHONE (254) 897-5455 REPORTING PERIOD: June 2004

1. Design Electrical Rating 1,15000
2. Maximum Dependable Capacity (MWe-Net) 1,150.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,367.00 85,203.05
4. Number of Hours Generator On-line 720.00 4,367.00 84,653.28
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 818,481 .00 5,004,547.00 92,059,849.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason Down 2 Comments I INONE I I I NONE

SUMMARY

06/01/04 0000 Unit began the month at full power. 06/30/04 2400 Unit ended the month at full power.

2 1 Method:

Reason: 1 Manual A Equipment Failure (Explain) 2 Manual Trip/Scram B Maintenance or Test 3 Automatic Trip/Scram C Refueling 4 Continuation D Regulatory Restriction 5 Other (Explain)

E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1